Province | Subbasin | % |
---|---|---|
Columbia Plateau | Crab | 100.00% |
Previous: | Next: |
---|---|
74314 REL 91: 2006-003-00 EXP DESERT WILDLIFE AREA O&M |
|
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
BPA Administrative duties | B: 119. BPA Administrative Requirements | 01/31/2022 | 01/31/2022 | |
Environmental Compliance | C: 165. Complete environmental compliance documentation | 01/31/2022 | 01/31/2022 | |
TD-1 cells tilled | D: 181. Till cells at TD1 | 10/31/2021 | 10/31/2021 | |
Seed 20 acres of moist soil vegetation at TD-1 project site | E: 47. Moist soil seeding in TD-1 | 10/31/2021 | 10/31/2021 | |
Monitor and maintain desirable vegetation, control undesirable vegetation at TD-2, TD-4, TD-6 | F: 198. Monitor and maintain desirable vegetation, control undesirable vegetation at TD-2 | 01/31/2022 | 01/31/2022 | |
Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1, TD-3, TD-5 | G: 198. Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1 | 01/31/2022 | 01/31/2022 | |
Armor dikes at the TD-1 site | H: 186. Inspect and repair water control structures and dikes at TD-1 site | 01/31/2022 | 01/31/2022 | |
Armor dikes at the TD-2 site | I: 186. Inspect and repair dikes at TD-2 site | 01/31/2022 | 01/31/2022 | |
Seed and plant plugs into disturbed soil at TD-1 | J: 186. Seed and plant plugs into disturbed soil at TD-1 site | 01/31/2022 | 01/31/2022 | |
Seed and plant plugs into disturbed soil at TD-2 | K: 186. Seed and plant plugs into disturbed soil at TD-2 site | 01/31/2022 | 01/31/2022 | |
Seasonally inundate and dewater the wetland cells at TD-1 (Oct-May) | L: 186. Operate water control structures at TD-1 | 01/31/2022 | 01/31/2022 | |
Numbers and species of waterfowl using TD-1 and TD-2 waters through the spring, fall and winter | M: 157. Fall and winter waterfowl counts | 01/31/2022 | ||
Attach 2020 Annual Progress Report in Pisces | N: 132. Submit Progress Report for the period Feb 2020 to Jan 2021 | 09/30/2021 | 09/30/2021 |
Primary Focal Species | Work Statement Elements |
---|---|
Wildlife |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 119 | BPA Administrative Requirements | |||||||
C | 165 | Complete environmental compliance documentation | |||||||
D | 181 | Till cells at TD1 | 02/01/2021 | ||||||
E | 47 | Moist soil seeding in TD-1 | 02/01/2021 | ||||||
F | 198 | Monitor and maintain desirable vegetation, control undesirable vegetation at TD-2 | 02/01/2021 | ||||||
G | 198 | Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1 | 02/01/2021 | ||||||
H | 186 | Inspect and repair water control structures and dikes at TD-1 site | 02/01/2021 | ||||||
I | 186 | Inspect and repair dikes at TD-2 site | 02/01/2021 | ||||||
J | 186 | Seed and plant plugs into disturbed soil at TD-1 site | 02/01/2021 | ||||||
K | 186 | Seed and plant plugs into disturbed soil at TD-2 site | 02/01/2021 | ||||||
L | 186 | Operate water control structures at TD-1 | 02/01/2021 | ||||||
M | 157 | Fall and winter waterfowl counts | 02/01/2021 | ||||||
N | 132 | Submit Progress Report for the period Feb 2020 to Jan 2021 |