Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74314 REL 13: 2010-001-00 EXP IPID & CITY OF LEAVENWORTH FISH SCREEN UPGRADE
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
74314 REL 13
Contract Title:
2010-001-00 EXP IPID & CITY OF LEAVENWORTH FISH SCREEN UPGRADE
Contract Continuation:
Previous: Next:
n/a
  • 74314 REL 79: 2010-001-00 EXP IPID & CITY OF LEAVENWORTH FISH SCREEN UPGRADE
Contract Status:
Closed
Contract Description:
This contract deliverable will be 100% engineered fish screen facility designs for the 117 cfs Icicle Creek diversion owned by the Icicle Peshastin Irrigation District (IPID) and for the 6 cfs City of Leavenworth (CoL) diversion. These diversions are located at nearly the same point in the reach with IPID being located on the river-right side and CoL on the river-left side. The two points of diversion utilize the same channel spanning weir to control water surface elevations at their respective points of diversion. This funding is for design only, no permitting or construction actions are included.

The contractor (WDFW), its designated agents, sub-consultants and project stakeholders will be available, responsive and collaboratively address contract related issues during the term of the contract. Contract issues include but are not limited to technical, policy, regulatory, project management and associated elements related to the project. Successful execution of this contract is contingent on alignment of the preceding contract issues with the BPI and BPA contracting processes, project management plans, design review protocols (including but not limited to BPA RRT design review, Technical and Design Team guidance, review, input, comments, integration, stakeholder congruence with proposed actions and decisions rendered by 1) the project executive team (BPA, UCSRB, WDFW, IPID, & City of Leavenworth). Arbitration and dispute resolution will occur relative to the following two tier escalation ladder: 1) conference with the project Executive Team and 2) Direct consultation between program managers.
Account Type(s):
Expense
Contract Start Date:
08/21/2017
Contract End Date:
09/30/2018
Current Contract Value:
$190,617
Expenditures:
$190,617

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance A: 165. Environmental Compliance 09/30/2018 09/30/2018
Fish Screen Facility Designs for the City of Leavenworth and IPID B: 119. Project Management 09/30/2018 09/30/2018
WDFW Coordination and Collaboration C: 191. WDFW will Coordinate with all Pertinent Partners Associated with Project 09/30/2018 09/30/2018
IPID Fish Screen Facility Design D: 175. Design of IPID Fish Screen 09/30/2018 09/30/2018
City of Leavenworth Fish Screen Facility 100% Design E: 175. Design of City of Leavenworth Fish Screen 09/30/2018 09/30/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 08/21/2017
B 119 Project Management 07/01/2017
C 191 WDFW will Coordinate with all Pertinent Partners Associated with Project 08/21/2017
D 175 Design of IPID Fish Screen 07/01/2017
E 175 Design of City of Leavenworth Fish Screen 07/01/2017
F 185 Periodic Status Reports for BPA 07/01/2017
G 132 (no report is required per COTR) 08/21/2017