Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74314 REL 47: 2002-014-00 EXP SUNNYSIDE WILDLIFE MITIGATION: O&M (ENHANCEMENTS)
Project Number:
Title:
Sunnyside Wildlife Mitigation
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
74314 REL 47
Contract Title:
2002-014-00 EXP SUNNYSIDE WILDLIFE MITIGATION: O&M (ENHANCEMENTS)
Contract Continuation:
Previous: Next:
74314 REL 6: 2002-014-00 EXP SUNNYSIDE WILDLIFE MITIGATION: O&M (ENHANCEMENTS)
  • 74314 REL 77: 2002-014-00 EXP SUNNYSIDE WILDLIFE MITIGATION
Contract Status:
Closed
Contract Description:
The Sunnyside Wildlife Area (SWA) is a complex of 5 separate management units, which are located in Benton and Yakima counties. The total size of the wildlife area is 10,705 acres. Three of the units, the I-82, Headquarters and Byron Ponds, are located within the Yakima River floodplain. Typical habitat ranges from upland shrub-steppe to mature riparian forest. The remaining two units, Thornton and Rattlesnake Slope, are located within the western end of the Rattlesnake Hills in Benton County. Shrub-steppe and grassland are the primary habitat types.

Substantial wetland enhancement projects have been initiated on the Headquarters unit and require continued management activity to maintain desired functionality. Large monocultures of Russian olive exist on the HQ and Byron Pond units. Manageable blocks of olives are removed each year so native herbaceous and woody habitat can be planted. Noxious weeds are present on most sites and are controlled by chemical, mechanical and cultural methods. Wherever possible, native vegetation is planted after the weeds are controlled to offer continued competition against reinfestation.

The Sunnyside Wildlife Area was selected to provide mitigation benefits for habitat losses incurred through the construction of 3 Columbia River dams (Grand Coulee, McNary and John Day). In general, work performed on this wildlife area is centered around enhancing and restoring the native habitat to meet the needs of the indicator species that were selected to represent these habitat types. The wildlife area also serves as an important public hunting area and is managed for production of upland wildlife and waterfowl. The staff consists of a Wildlife Area Manager, full time Assistant Manager (Fish and Wildlife Biologist 2) and a 9-month career seasonal technician (Natural Resource Tech 2). All of the assistant manager's salary and all of the 9-month seasonal technician's salary are covered in the 2011 budget. The Manager's salary has always been partially funded because the BPA-funded Sunnyside WA has been merged with select, state-funded lands that are associated with Snake River Mitigation. BPA funds are only used to accomplish tasks on the original 5 units of the Sunnyside Wildlife Area. State funds are used to make up the balance and to assure full time staffing is maintained for all lands. The Manager's salary & benefits are covered at the 67% level by BPA funding under this project.
Account Type(s):
Expense
Contract Start Date:
07/01/2018
Contract End Date:
06/30/2019
Current Contract Value:
$276,664
Expenditures:
$276,664

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Project adminstrative work required by BPA 06/30/2019 06/30/2019
Documentation and assistance for environmental and cultural resource clearances C: 165. Environmental Compliance Documentation & Clearance for habitat protection, restoration & enhan 06/30/2019 06/30/2019
Weed suppression consistent with improved or restored native cover in upland and wetland habit D: 199. Weed Control (ongoing): Combined Management Units (minimum of 400 acres) 06/15/2019 06/15/2019
Maintain 40 acres of previously extracted Russian olive areas on HQ E: 198. Continue to Remove Russian olives, HQ Unit (ongoing) 06/15/2019 06/15/2019
Improved habitat condition and function F: 198. Burn vegetation to improve habitat (ongoing) 06/15/2019 06/15/2019
Successful establishment of shrubs, herbaceous plantings G: 198. Maintain extant shrub/tree plantings, shrub-steppe habitat and herbaceous seedings (ongoing) 06/15/2019 06/15/2019
Productive waterfowl and shorebird feeding, nesting, brood rearing & loafing areas H: 198. Maintain moist soil management cells: adjacent waterfowl nesting and brood rearing habitat (ongoing) 06/15/2019 06/15/2019
Additional wetland habitat enhanced or restored I: 181. Enhanced or restored wetland habitat 06/30/2019 06/30/2019
Collection and assessment of trend data for ~10 vegetation transects J: 115. Assess Vegetation Trends to Monitor Changing Habitat Condition (added in FY16) 06/15/2019 06/15/2019
Intact and functional boundary fencing. K: 186. Boundary Fence Maintenance 06/15/2019 06/15/2019
Safe, secure, healthy and operational project facilities and equipment L: 186. Maintain (repair) Headquarters buildings, equipment yards, etc. 06/15/2019 06/15/2019
Maintain and regulate access and provide public information M: 188. Install and/or maintain signs, kiosks, access roads & parking lots 06/30/2019 06/30/2019
Exclude livestock and resolve trespass issues. N: 26. Resolve trespass issues 06/30/2019 06/30/2019
Managed lands, access areas, and public health & safety maintained O: 27. Monitor access areas: remove debris as needed 06/30/2019 06/30/2019
Submit 2-year Progress (Annual) Report for 2015 & 2016 P: 132. COMPLETE: Progress Report (2-year) for 2015 and 2016 (01/01/2015 to 12/31/2016) 07/31/2018 07/20/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 199 Remove Vegetation
  • 4 instances of WE 198 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 27 Remove Debris
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 115 Produce Inventory or Assessment

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 07/01/2018
B 119 Project adminstrative work required by BPA 07/01/2018
C 165 Environmental Compliance Documentation & Clearance for habitat protection, restoration & enhan 07/01/2018
D 199 Weed Control (ongoing): Combined Management Units (minimum of 400 acres) 07/01/2018
E 198 Continue to Remove Russian olives, HQ Unit (ongoing) 07/01/2018
F 198 Burn vegetation to improve habitat (ongoing) 07/01/2018
G 198 Maintain extant shrub/tree plantings, shrub-steppe habitat and herbaceous seedings (ongoing) 07/01/2018
H 198 Maintain moist soil management cells: adjacent waterfowl nesting and brood rearing habitat (ongoing) 07/01/2018
I 181 Enhanced or restored wetland habitat
J 115 Assess Vegetation Trends to Monitor Changing Habitat Condition (added in FY16) 07/01/2018
K 186 Boundary Fence Maintenance 07/01/2018
L 186 Maintain (repair) Headquarters buildings, equipment yards, etc. 07/01/2018
M 188 Install and/or maintain signs, kiosks, access roads & parking lots 07/01/2018
N 26 Resolve trespass issues 07/01/2018
O 27 Monitor access areas: remove debris as needed 07/01/2018
P 132 COMPLETE: Progress Report (2-year) for 2015 and 2016 (01/01/2015 to 12/31/2016) 07/01/2018
Q 132 Deliverable due next period: Progress Report (2-year): 2017 and 2018 (01/01/2017 - 12/31/2018) 07/01/2018