Contract 74624: 2000-027-00 EXP MALHEUR RIVER WILDLIFE MITIGATION
Project Number:
Title:
Malheur River Wildlife Mitigation
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Middle Snake Malheur 100.00%
Contract Number:
74624
Contract Title:
2000-027-00 EXP MALHEUR RIVER WILDLIFE MITIGATION
Contract Continuation:
Previous: Next:
71145: 2000-027-00 EXP MALHEUR RIVER WILDLIFE MITIGATION
  • 78136: 2000-027-00 EXP MALHEUR RIVER WILDLIFE MITIGATION BPT
Contract Status:
Closed
Contract Description:
The Malheur River Wildlife Mitigation Project was purchased in November 2000 to compensate, in part, for the loss of fish and wildlife resources in the Columbia and Snake River Basins.  The 31,781-acre Project is located eleven miles east of Juntura, Oregon and is adjacent to the Malheur River.  The Project includes 6,385 deeded acres owned by the Burns Paiute Tribe, 4,154 acres leased from the Department of State Lands, and 21,242 acres leased from the BLM.  The Project is comprised of meadow, wetland, and shrub-steppe habitats and stretches for seven miles along the Malheur River.

In 2017, this contract will allow the Burns Paiute Tribe in the following management activities: complying with cultural resource and ESA requirements, improving and maintaining multiple vegetation communities through seeding and planting projects, identifying and controlling noxious weeds, re-establishing a riparian corridor, providing access, and education/coordination with tribal, government and general public parties.
Account Type(s):
Expense
Contract Start Date:
01/01/2017
Contract End Date:
12/31/2017
Current Contract Value:
$371,480
Expenditures:
$371,480

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Cultural Resource clearance complete A: 165. Complete Environmental Compliance Requirements & Tribal/Cultural Surveys 12/31/2017 11/15/2017
Complete feasibility assessment and EC for proposed reservoirs B: 175. Complete EC and feasibility for repair/construction of reservoirs on Trail and Hunter Creek parcels 12/31/2017 06/05/2017
Weed Control C: 198. Weed Control 12/31/2017 12/21/2017
Maintain Wet Meadow Irrigation System D: 198. Maintain Wet Meadow Irrigation 10/31/2017 10/16/2017
Haying Operations E: 198. Haying Operations 10/15/2017 09/15/2017
Graze BLM, State and Meadows. F: 199. Graze State and Meadows 12/31/2017 07/30/2017
Plant willows G: 47. Plant Willows on Riparian 12/31/2017 10/09/2017
Plant Pollinator habitat H: 47. Plant Pollinator habitat 12/31/2017 11/09/2017
Plant seed in alfalfa field I: 47. seed alfalfa field 10/31/2017 06/05/2017
Fence Maintained J: 186. Maintain Fence 12/31/2017 10/20/2017
complete excavation of wetland ponds / culvert installation of OWEB grant project K: 181. oversee OWEB grant wetland enhancement project 12/31/2017
Conservation Reserve Enhancement Program Maintenance L: 198. Conservation Reserve Enhancement Program Maintenance 12/31/2017 04/30/2017
Data Collected and entered M: 157. Conduct Project Surveys 12/31/2017 12/21/2017
Juniper removed N: 199. juniper eradication - NRCS SGI contract 12/31/2017 11/15/2017
Sage Grouse study O: 158. Sage Grouse Study 12/31/2017 12/21/2017
Improved roads P: 38. Improve roads on mitigation site 12/31/2017 07/28/2017
Update roof on barn Q: 186. Update roof on barn 12/31/2017
Update fuel tanks with spill basins R: 186. Update fuel tanks with spill basins 12/31/2017 07/30/2017
Inspect Bridge for structural integrity / weight limits. S: 186. Initiate inspection of bridge across Malheur River for structural integrity 12/31/2017 08/17/2017
EC complete for update/renovating bunkhouse T: 186. EC for update/renovating bunkhouse 12/31/2017
Access controlled U: 188. Control Access 12/31/2017 12/21/2017
Community education and information V: 99. Public Education and Information 12/31/2017 12/21/2017
Tribal education complete W: 99. Tribal Community Education 12/31/2017 12/21/2017
Staff education and communication X: 99. Seminars/Training for staff 12/31/2017 12/21/2017
Project administration Y: 119. Project Administration & Assist Fisheries department 12/31/2017 12/29/2017
Completed Annual Report Z: 132. Submit Progress Report for the period 1/1/2016 to 12/31/2016 04/15/2017 03/14/2017
New well and water lines to Manager's house and bunkhouse AC: 186. New well and water lines to bunkhouse and Manager's house 12/31/2017
Cost Share: Rebuild Greenhouse AD: 186. Cost share: Rebuild greenhouse 10/31/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 4 instances of WE 198 Maintain Vegetation
  • 2 instances of WE 199 Remove Vegetation
  • 7 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 3 instances of WE 47 Plant Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete Environmental Compliance Requirements & Tribal/Cultural Surveys 01/01/2017
B 175 Complete EC and feasibility for repair/construction of reservoirs on Trail and Hunter Creek parcels
C 198 Weed Control 01/01/2017
D 198 Maintain Wet Meadow Irrigation 01/01/2017
E 198 Haying Operations 01/01/2017
F 199 Graze State and Meadows 01/01/2017
G 47 Plant Willows on Riparian 01/01/2017
H 47 Plant Pollinator habitat 10/06/2017
I 47 seed alfalfa field 01/01/2017
J 186 Maintain Fence 01/01/2017
K 181 oversee OWEB grant wetland enhancement project 01/01/2017
L 198 Conservation Reserve Enhancement Program Maintenance 01/01/2017
M 157 Conduct Project Surveys 01/01/2017
N 199 juniper eradication - NRCS SGI contract 01/01/2017
O 158 Sage Grouse Study 01/01/2017
P 38 Improve roads on mitigation site 06/05/2017
Q 186 Update roof on barn 09/27/2017
R 186 Update fuel tanks with spill basins 06/05/2017
S 186 Initiate inspection of bridge across Malheur River for structural integrity 01/01/2017
T 186 EC for update/renovating bunkhouse
U 188 Control Access 01/01/2017
V 99 Public Education and Information 01/01/2017
W 99 Tribal Community Education 01/01/2017
X 99 Seminars/Training for staff 01/01/2017
Y 119 Project Administration & Assist Fisheries department 01/01/2017
Z 132 Submit Progress Report for the period 1/1/2016 to 12/31/2016 01/01/2017
AA 132 Prepare data for draft annual report for period 1/2017 to 12/2017 01/01/2017
AB 185 Periodic Status Reports for BPA 01/01/2017
AC 186 New well and water lines to bunkhouse and Manager's house 11/06/2017
AD 186 Cost share: Rebuild greenhouse 10/06/2017