Effective implementation management and timely contract administration |
A: 119. Project Management and Administration |
|
06/30/2023 |
06/26/2023 |
Environmental documentation for all activities requiring such review |
B: 165. Environmental compliance documentation |
|
06/30/2023 |
06/26/2023 |
Produce accessible, error-checked datasets |
C: 157. Sampling and assays for South Fork WCT project |
|
06/30/2023 |
03/31/2023 |
Deliverable: An accessible, error-checked data set with metadata |
D: 162. Data analyses for South Fork WCT project |
|
06/30/2023 |
03/31/2023 |
Upload data |
E: 66. Local source WCT collections for Sekokini Springs rearing facility. |
|
09/30/2022 |
09/30/2022 |
Produce accessible, error-checked datasets |
F: 157. Genomics of Oncorhynchus hybridization to inform WCT conservation |
|
06/30/2023 |
06/26/2023 |
Deliverable: An accessible, error-checked data set with metadata |
G: 162. SNP genotyping to assess diversity, connectivity and restoration success in bull trout |
|
06/30/2023 |
06/26/2023 |
Produce accessible, error-checked datasets |
H: 157. Geochemical otolith analyses to reconstruct focal fish species life history |
|
06/30/2023 |
03/30/2023 |
Produce accessible, error-checked datasets |
I: 157. Investigations of WCT and RBT hybridization in the Flathead River system: data collection |
|
06/30/2023 |
06/23/2023 |
Deliverable: An accessible, error-checked data set with metadata |
J: 162. Investigations of WCT and RBT hybridization in the Flathead River system: data analyses |
|
06/30/2023 |
06/23/2023 |
Remove and relocate hybrid and rainbow trout from tributaries in the Flathead River drainage. |
K: 190. Remove and relocate hybrids and RBT from tributaries in the interconnected Flathead drainage |
|
06/30/2023 |
06/23/2023 |
Produce accessible, error-checked datasets |
L: 157. Bull Trout spawning habitat monitoring: data collection |
|
06/30/2023 |
06/30/2023 |
Deliverable: An accessible, error-checked data set with metadata |
M: 162. Bull Trout spawning habitat monitoring: data analyses |
|
06/30/2023 |
06/30/2023 |
Produce accessible, error-checked datasets |
N: 157. Focal species population monitoring in the Mainstem Flathead River system |
|
06/30/2023 |
06/30/2023 |
Law enforcement activities |
O: 192. Expanded Bull Trout patrols/related enforcement actions |
|
06/30/2023 |
06/26/2023 |
Protect riparian plantings |
P: 198. Maintain riparian plantings at multiple sites |
|
06/30/2023 |
06/26/2023 |
Maintain public access |
Q: 188. Continuing maintenance and upkeep of Foys Bend fisheries conservation area |
|
06/30/2023 |
06/26/2023 |
Weed control at Osprey View |
R: 198. Weed control at Osprey View FCA |
|
06/30/2023 |
06/26/2023 |
Weed control at North Shore |
S: 198. Weed control at North Shore WMA |
|
06/30/2023 |
06/30/2023 |
Weed control at Squeezer Creek |
T: 198. Weed control at Squeezer Creek CE |
|
06/30/2023 |
06/30/2023 |
Weed control at Louden |
U: 198. Weed control at Louden CE |
|
06/30/2023 |
06/26/2023 |
Weed control at Section 31 Perry Creek |
V: 198. Weed control at Section 31 Perry Creek FCA |
|
06/30/2023 |
06/26/2023 |
Weed control at Diamond B |
W: 198. Weed control at Diamond B CE |
|
06/30/2023 |
06/30/2023 |
Weed control at Foys Bend |
X: 198. Weed control at Foys Bend FCA |
|
06/30/2023 |
06/26/2023 |
Weed control at Otter Island |
Y: 198. Weed control at Otter Island FCA |
|
06/30/2023 |
06/26/2023 |
Weed control at Hay Creek |
Z: 198. Weed control at Hay Creek FCA |
|
06/30/2023 |
06/26/2023 |
Establish 6 acres of black cottonwood from seed |
AA: 47. Seed Black Cottonwood at Foys Bend |
|
06/30/2023 |
06/26/2023 |
Seed bed prepared for planting |
AB: 198. Maintain Cottonwood Seeding at Diamond B |
|
06/30/2023 |
06/26/2023 |
Final Design for Logan Creek AOP |
AC: 175. Logan Creek Culvert Design and Bid Assistance |
|
06/30/2023 |
|
Open bottom arch culvert installed on McInernie Creek |
AD: 184. Install Fish Passage Structure at McInernie |
|
06/30/2023 |
|
Partial design prepared for Moose Cr. fish passage barrier |
AE: 175. Partial design of a fish passage barrier in Moose Creek |
|
06/30/2023 |
|
Lake inventory and assessments |
AF: 115. Flathead Valley watershed lake water quality monitoring |
|
06/30/2023 |
06/26/2023 |
Completed Annual Report |
AG: 132. Submit Annual Report for period 1/1/21 to 12/31/21 |
|
04/29/2023 |
03/31/2023 |