Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 76916 REL 21: 1991-019-03 EXP HUNGRY HORSE MITIGATION/HABIT
Project Number:
Title:
Hungry Horse Mitigation Habitat Restoration and Research, Monitoring and Evaluation (RM&E)
Stage:
Implementation
Area:
Province Subbasin %
Mountain Columbia Flathead 100.00%
Contract Number:
76916 REL 21
Contract Title:
1991-019-03 EXP HUNGRY HORSE MITIGATION/HABIT
Contract Continuation:
Previous: Next:
76916 REL 15: 1991-019-03 EXP HUNGRY HORSE MITIGATION/HABIT
  • 76916 REL 22: 1991-019-03 EXP HUNGRY HORSE MITIGATION/HABIT
Contract Status:
Closed
Contract Description:
NOTE TO CONTRACT OFFICER:  Please send contract documents to Jannice Richardson, Administrative Contact and Matt Boyer, Contract Manager.

Subbasin:  Flathead.  This project conducts mitigation actions in the Flathead River headwaters downstream to Flathead Lake, including lakes within the subbasin boundary.

Project Background:
In 1991, Montana Fish Wildlife & Parks (MFWP) and the Confederated Salish and Kootenai Tribes (CSKT) published the Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam (MFWP and CSKT 1991).  This Mitigation Plan presented fisheries losses, mitigation options, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat impacted by the construction and operation of Hungry Horse Dam.  The Northwest Power and Conservation Council (Council; formerly the Northwest Power Planning Council) approved the loss statement: including annual losses of 250,000 juvenile bull trout (Salvelinus confluentus) and 65,000 juvenile westslope cutthroat trout (Oncorhynchus clarkii lewisi), plus 124 km of critical, low gradient spawning and rearing habitat that was inundated and lost subsequent to the filling of Hungry Horse Reservoir.  The Council then directed MFWP and CSKT to immediately develop an Implementation Plan, which was adopted for Hungry Horse Dam (MFWP and CSKT 1993).  On-the-ground mitigation activities began in 1992.  This project is one of a few federally funded, Columbia River mitigation projects carrying out a plan to offset a Council-adopted loss statement.  Fisheries losses were to be offset by modifying dam operations, restoring or reconnecting habitat, reducing negative non-native species interactions, and implementing hatchery (native fish conservation) technology and offsite mitigation.  

The Council adopted the Flathead Subbasin Plan in 2004 (CSKT and MFWP 2004).  The federal action agency's 4-H plan is designed to recover Columbia River fish species listed as threatened or endangered under the Endangered Species Act (Federal Caucus 2000).  Our mitigation program is directed by a similar scientific framework to offset fisheries losses at various spatial scales, descending from basin-wide mitigation requirements to site-specific actions.  Mitigation projects are selected and prioritized based on decision pathways described in the Flathead Subbasin Plan (2004), and specific objectives and tasks are described in detail in the contract and statement of work.  This project will focus on improving conditions for native fish survival and recovery in the upper Flathead River and Lake system.  From July 2021 through June 2022 our work will focus on assessing population level effects of dam operations on native fishes (bull trout, westslope cutthroat trout, and mountain whitefish), implementing habitat improvement and fish passage projects, and quantifying and mitigating deleterious effects of non-native aquatic species on native fishes.  Specific actions are detailed in the current Statement of Work and include genetic and demographic trend assessments of focal fish species, improvements and maintenance of culvert passage projects, land stewardship at Fisheries Conservation Areas and conservation easement properties, fish barrier site surveys to inform future isolation management strategies for westslope cutthroat trout, and suppression and eradication of threats posed by introduced rainbow trout..


Account Type(s):
Expense
Contract Start Date:
07/01/2021
Contract End Date:
06/30/2022
Current Contract Value:
$1,317,785
Expenditures:
$1,317,785

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Project Management and Administration 06/30/2022 06/02/2022
Environmental documentation for all activities requiring such review B: 165. Environmental compliance documentation 06/30/2022 06/02/2022
Data from South Fork Flathead WCT project C: 157. Sampling and assays for South Fork WCT project 06/30/2022 03/22/2022
Written assessments of data from work element C: Sampling and assays for South Fork WCT project D: 162. Data analyses for South Fork WCT project 06/30/2022 03/31/2022
Local source WCT collections E: 66. Local source WCT collections for Sekokini Springs rearing facility. 09/30/2021 09/13/2021
Genomic data set from westslope cutthroat, rainbow trout, and their hybrids F: 157. Genomics of Oncorhynchus hybridization to inform WCT conservation 06/30/2022 06/02/2022
Bull trout SNP genotyping G: 162. SNP genotyping to assess diversity, connectivity and restoration success in bull trout 06/30/2022 06/02/2022
Otolith geochemical analyses of focal fish species H: 157. Geochemical otolith analyses to reconstruct focal fish species life history 06/30/2022 03/31/2022
Data from WCT and RBT hybridization monitoring I: 157. Investigations of WCT and RBT hybridization in the Flathead River system: data collection 06/30/2022 06/28/2022
Report assessments of data collected in associated work element J: 162. Investigations of WCT and RBT hybridization in the Flathead River system: data analyses 06/30/2022 03/15/2022
Remove and relocate hybrid and rainbow trout from tributaries in the Flathead River drainage K: 190. Remove and relocate hybrids and RBT from tributaries in the interconnected Flathead drainage 06/30/2022 06/28/2022
Bull trout spawning habitat data for the Transboundary Flathead River L: 157. Bull Trout spawning habitat monitoring: data collection 06/30/2022 06/28/2022
Substrate coring data analyses for the Transboundary Flathead M: 162. Bull Trout spawning habitat monitoring: data analyses 06/30/2022 06/28/2022
Population monitoring data for focal species in the Mainstem Flathead River N: 157. Focal species population monitoring in the Mainstem Flathead River system 06/30/2022 06/28/2022
Law enforcement activities O: 192. Expanded Bull Trout patrols/related enforcement actions 06/30/2022 06/02/2022
Protect riparian plantings P: 198. Maintain riparian plantings at multiple sites 06/30/2022 06/02/2022
Maintenance and upkeep of fisheries conservation areas Q: 188. Continuing maintenance and upkeep of fisheries conservation areas 06/30/2022 06/02/2022
Weed control at Osprey View FCA R: 198. Weed control at Osprey View FCA 06/30/2022 06/02/2022
Weed control at North Shore WMA S: 198. Weed control at North Shore WMA 06/30/2022 06/02/2022
Weed control at Squeezer Creek CE T: 198. Weed control at Squeezer Creek CE 06/30/2022 06/02/2022
Weed control at Louden CE U: 198. Weed control at Louden CE 06/30/2022 06/02/2022
Weed control at Section 31 Perry Creek FCA V: 198. Weed control at Section 31 Perry Creek FCA 06/30/2022 06/02/2022
Weed control at Diamond B CE W: 198. Weed control at Diamond B CE 06/30/2022 06/02/2022
Weed control at Foy's Bend FCA X: 198. Weed control at Foy's Bend FCA 06/30/2022 06/28/2022
Weed control at Otter Island FCA Y: 198. Weed control at Otter Island FCA 06/30/2022 06/02/2022
Weed control at Hay Creek FCA Z: 198. Weed control at Hay Creek FCA 06/30/2022 06/02/2022
Establish 6-acres of black cottonwood from seed AA: 47. Seed Black Cottonwood at Foys Bend 06/30/2022 06/28/2022
Seedbed prepared for planting AB: 47. Prepare Cottonwood Seeding Areas at Diamond B CE 06/30/2022 06/28/2022
Final design packet AC: 175. Logan Creek Culvert Design and Bid Assistance 06/30/2022
Final design packet AD: 175. McInernie Creek Culvert Replacement Design and Bid Package 06/30/2022 06/28/2022
Lake inventory and assessments AE: 115. Flathead Valley watershed lake water quality monitoring 06/30/2022 06/02/2022
Completed Annual Report AF: 132. Submit Annual Report for period 1/1/21 to 12/31/21 04/29/2022 03/31/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 10 instances of WE 198 Maintain Vegetation
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 162 Analyze/Interpret Data
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 192 Law Enforcement
  • 10 instances of WE 198 Maintain Vegetation
  • 2 instances of WE 47 Plant Vegetation
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 162 Analyze/Interpret Data
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Whitefish, Mountain (Prosopium williamsoni)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Wildlife
  • 1 instance of WE 47 Plant Vegetation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project Management and Administration
B 165 Environmental compliance documentation
C 157 Sampling and assays for South Fork WCT project 07/01/2021
D 162 Data analyses for South Fork WCT project
E 66 Local source WCT collections for Sekokini Springs rearing facility. 07/01/2021
F 157 Genomics of Oncorhynchus hybridization to inform WCT conservation 07/01/2021
G 162 SNP genotyping to assess diversity, connectivity and restoration success in bull trout
H 157 Geochemical otolith analyses to reconstruct focal fish species life history 07/01/2021
I 157 Investigations of WCT and RBT hybridization in the Flathead River system: data collection 07/01/2021
J 162 Investigations of WCT and RBT hybridization in the Flathead River system: data analyses
K 190 Remove and relocate hybrids and RBT from tributaries in the interconnected Flathead drainage 07/01/2021
L 157 Bull Trout spawning habitat monitoring: data collection
M 162 Bull Trout spawning habitat monitoring: data analyses
N 157 Focal species population monitoring in the Mainstem Flathead River system 07/01/2021
O 192 Expanded Bull Trout patrols/related enforcement actions
P 198 Maintain riparian plantings at multiple sites 07/01/2021
Q 188 Continuing maintenance and upkeep of fisheries conservation areas 07/01/2021
R 198 Weed control at Osprey View FCA 07/01/2021
S 198 Weed control at North Shore WMA 07/01/2021
T 198 Weed control at Squeezer Creek CE 07/01/2021
U 198 Weed control at Louden CE 07/01/2021
V 198 Weed control at Section 31 Perry Creek FCA 07/01/2021
W 198 Weed control at Diamond B CE 07/01/2021
X 198 Weed control at Foy's Bend FCA 12/31/2021
Y 198 Weed control at Otter Island FCA 07/01/2021
Z 198 Weed control at Hay Creek FCA 07/01/2021
AA 47 Seed Black Cottonwood at Foys Bend 12/31/2021
AB 47 Prepare Cottonwood Seeding Areas at Diamond B CE 12/31/2021
AC 175 Logan Creek Culvert Design and Bid Assistance
AD 175 McInernie Creek Culvert Replacement Design and Bid Package 06/28/2022
AE 115 Flathead Valley watershed lake water quality monitoring 07/01/2021
AF 132 Submit Annual Report for period 1/1/21 to 12/31/21
AG 185 Periodic Status Reports for BPA