Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 77111 REL 6: 2008-903-00 EXP ESA HABITAT RESTORATION
Project Number:
Title:
ESA Habitat Restoration
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
77111 REL 6
Contract Title:
2008-903-00 EXP ESA HABITAT RESTORATION
Contract Continuation:
Previous: Next:
75103: 2008-903-00 EXP ESA HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
The ESA – HR program will be focusing the majority of this year’s funds towards identifying distressed habitats within the Panther Creek and East Fork Salmon River drainages, and developing a uniform plan of action that can be applied to both areas. Both of these areas have been affected by past management activities such as timber harvest, mining, grazing, livestock grazing, water diversions, and wildfire suppression. A substantial proportion of the habitat that is critical to rearing and spawning salmonids has been affected. The main channel on both Panther Creek and East Fork have low habitat diversity in areas critical to the survival of rearing juvenile steelhead trout and Chinook salmon following the emergence from the gravel during the spring. Other influences include high summer stream temperatures, lack of quality habitat and complexity, and reduced riparian vegetation abundance and extent. The conditions present in each of these drainages render them as population sinks for threatened anadromous fish and a priority for habitat restoration by the Tribes.

ESA HR personnel will continue to assist the Yankee Fork Rehabilitation Program (YFRP) with data acquisition in order to meet the requirements under the Bonneville Power Administration's (BPA) Action Effectiveness Monitoring program (AEM). These data will include information pertaining to fish abundance, fish habitat utilization, and invertebrate composition from 25 sites, and will supplement the concurrent collection of habitat information gathered through the Columbia Habitat and Monitoring (CHaMP) protocol by Watershed Solutions, Inc. (WSI) personnel. ESA HR will also be partnering with US Forest Service in the decommissioning of Valley Creek Road (NFS RD# 70304). This will aid in the reduction of silt and fine sediments entering Valley Creek which may be leading to increased mortality of emergent fry, and a reduction in quality spawning habitat. Lastly, the Tribes have developed a Memorandum of Agreement between the Tribes and the IDFG North Fork Restoration Project that will help streamline cost-sharing in support of this important endeavor to restore a self-sustaining salmon population to the North Fork Salmon River.

Account Type(s):
Expense
Contract Start Date:
03/01/2018
Contract End Date:
02/28/2019
Current Contract Value:
$481,746
Expenditures:
$481,746

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Ensure that environmental compliance is complete for all work elements B: 165. Provide support for environmental compliance 07/15/2018 07/15/2018
Effective implementation management and timely contract administration C: 119. Administer & Manage ESA Habitat Contract 02/28/2019 02/28/2019
Yankee Fork CHaMP/AEM data collection D: 157. Yankee Fork CHaMP/AEM data collection 12/30/2018 12/30/2018
Yankee Fork CHaMP/AEM disseminate data E: 161. Yankee Fork CHaMP/AEM disseminate data 12/30/2018 12/30/2018
Produce designs for Panther Creek Drainage enhancement F: 175. Produce design plan for Panther Creek Drainage enhancement 12/21/2018 12/31/2018
Produce designs for East Fork Salmon River Habitat Enhancement Project G: 175. Produce design plan for East Fork Salmon River Habitat Enhancement Project 12/21/2018 12/21/2018
Valley Creek Road (NFS RD# 70304) Decommissioning H: 33. Decommissioning of Valley Creek Road 10/15/2018 10/15/2018
North Fork Habitat Improvement project: Arbon/Barton site I: 29. North Fork Habitat Improvement Project: Arbon/Barton 11/30/2018 11/30/2018
Install a total of a total of 0.64 miles of fencing at North Fork and Hughes Creek sites J: 40. Install fencing at North Fork and Hughes Creek sites 10/31/2018 10/31/2018
Completed Annual Report K: 132. Submit Progress Report for the period 1/1/2017 to 12/31/2017 02/28/2019 02/28/2019
Completed Annual Report L: 132. Submit Final Progress Report for the period (1/1/2016) to (12/31/2016) 02/28/2019 02/28/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 1 instance of WE 175 Produce Design
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 33 Decommission Road/Relocate Road
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 01/01/2018
B 165 Provide support for environmental compliance 01/01/2018
C 119 Administer & Manage ESA Habitat Contract 01/01/2018
D 157 Yankee Fork CHaMP/AEM data collection 03/01/2018
E 161 Yankee Fork CHaMP/AEM disseminate data 01/01/2018
F 175 Produce design plan for Panther Creek Drainage enhancement
G 175 Produce design plan for East Fork Salmon River Habitat Enhancement Project
H 33 Decommissioning of Valley Creek Road 09/12/2018
I 29 North Fork Habitat Improvement Project: Arbon/Barton 06/25/2018
J 40 Install fencing at North Fork and Hughes Creek sites 03/01/2018
K 132 Submit Progress Report for the period 1/1/2017 to 12/31/2017 01/01/2018
L 132 Submit Final Progress Report for the period (1/1/2016) to (12/31/2016) 03/01/2018