Ensure environmental compliance requirements are complete |
A: 165. Deschutes, Fifteenmile, Hood - Complete Environmental Compliance Requirements |
|
09/30/2018 |
09/25/2018 |
DR: Collect water temperature data |
B: 157. Deschutes River (DR): 2017-2018 Record tributary water temperatures for lamprey life-history |
|
09/30/2018 |
09/25/2018 |
Manage and summarize water temperature data (2016-2017) to characterize lamprey habitats |
C: 162. DR: Manage and summarize water temperature data (2017-2018) to characterize lamprey habitats |
|
09/30/2018 |
09/25/2018 |
Tag adult lamprey at Sherars Falls |
D: 158. DR: 2018 Tag lamprey to estimate abundance at Sherars Falls |
|
09/30/2018 |
09/25/2018 |
Collect lamprey abundance and harvest data to estimate escapement at Sherars Falls 2017 |
E: 157. DR: Collect lamprey abundance and harvest data to estimate escapement at Sherars Falls 2018 |
|
09/30/2018 |
03/15/2018 |
Estimate adult lamprey escapement for 2017 |
F: 162. DR: 2017 Estimate Pacific lamprey escapement upstream of Sherars Falls |
|
09/30/2018 |
03/15/2018 |
Operate PIT arrays in Warm Springs River and Shitike Creek |
G: 157. DR: Collect data from dual reader PIT sites on CTWSRO reservation |
|
09/30/2018 |
09/25/2018 |
Study feasibility for a mark-recapture estimate of lamprey in Warm Springs River |
H: 156. DR: Study feasibility for a mark-recapture estimate of lamprey in Warm Springs River |
|
09/30/2018 |
09/25/2018 |
Effective population size (Ne) and age at migration of larval lamprey in Warm Springs River |
I: 156. DR: Study feasibility of Ne and age of migration of larval lamprey in Warm Springs River |
|
09/30/2018 |
09/26/2018 |
Record, store, summarize water temperature data collected in 2017-18 for limiting factors anal |
J: 162. Fifteenmile (FM): Manage and summarize water temperature data (2017-2018) |
|
09/30/2018 |
09/25/2018 |
Conduct mark-recapture and creel surveys to estimate escapement upstream of Cushing Falls |
K: 157. FM: 2018 Field activities to estimate Pacific lamprey escapement estimate upstream of Cushing Falls |
|
09/30/2018 |
09/25/2018 |
Tag lamprey |
M: 158. FM: Tag lamprey at Cushing Falls for escapement estimates |
|
09/30/2018 |
06/28/2018 |
Tag lamprey at Bonneville Dam |
N: 158. Bonneville Dam: PIT tag lamprey for escapement estimates in Fifteenmile Creek |
|
09/30/2018 |
08/16/2018 |
Effective population size (Ne) and age at migration of larval lamprey in Fifteenmile Creek |
O: 156. FM: Study feasibility of Ne and age of migration of larval lamprey in Fifteenmile Creek |
|
09/30/2018 |
09/25/2018 |
Analysis of tissue samples from larval and adult lamprey in Fifteenmile Creek |
P: 162. FM: Analysis of tissue samples from larval and adult lamprey |
|
09/30/2018 |
09/26/2018 |
Operation of HDX PIT Tag Arrays In Fifteenmile Creek Subbasin |
Q: 157. FM: Record PIT tagged lamprey in Fifteenmile Creek |
|
09/30/2018 |
09/25/2018 |
Install, operate, maintain and collect data from HDX arrays in the Hood River Subbasin |
R: 157. Hood River (HR): Collect data from half-duplex site in Hood River |
|
09/30/2018 |
09/25/2018 |
Determine current end of distribution for Pacific lamprey within the Hood River Subbasin |
S: 157. HR: Document presence/absence and end of distribution of lamprey in Hood River Subbasin |
|
09/30/2018 |
09/25/2018 |
Analyze distribution & density data in the Deschutes, Fifteenmile, and Hood subbasins |
T: 162. DR, FM, & HR: Analyze 2017 larval lamprey surveys (end of distribution and densities) |
|
09/30/2018 |
03/15/2018 |
Enter HDX Tag information into CTWSRO database |
U: 159. DR, FM, & HR: Enter HDX PIT tag information into CTWSRO database |
|
09/30/2018 |
09/25/2018 |
Lamprey migration timing and movement patterns in Deschutes, Fifteenmile and Hood subbasins |
V: 162. DR, FM & HR: Summarize data collected from PIT tag Arrays |
|
09/30/2018 |
09/25/2018 |
Participate in regional lamprey research and recovery forums |
W: 189. DR, FM, & HR: Participate in regional planning and recovery actions for Pacific lamprey |
|
09/30/2018 |
09/25/2018 |
All administrative tasks fulfilled with timely quality products |
X: 119. Manage Project |
|
09/30/2018 |
09/25/2018 |
Complete CY2017 Annual Report |
Y: 132. Submit Progress Report for the period 1/1/2017 to 12/31/2017 |
|
04/30/2018 |
03/19/2018 |