Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 77341: 2002-013-01 EXP WATER ENTITY - CBWTP
Project Number:
Title:
Water Entity - CBWTP
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
77341
Contract Title:
2002-013-01 EXP WATER ENTITY - CBWTP
Contract Continuation:
Previous: Next:
73531: 2002-013-01 EXP WATER ENTITY - CBWTP
  • 80638: 2002-013-01 EXP NFWF WATER ENTITY - CBWTP
Contract Status:
Closed
Contract Description:
The primary focus of the CBWTP is to fund water transactions that restore streamflow on ecologically-significant Columbia Basin tributaries.  The CBWTP is administered through a cooperative agreement between BPA and the National Fish and Wildlife Foundation (NFWF).  
Subbasin plans and other habitat assessments throughout the Columbia Basin cite inadequate streamflows as a key factor limiting the productivity of both anadromous and resident fish species.  Water transactions provide an effective and appropriate response to this key limiting factor.  Restored streamflow benefit multiple fish species, particularly Chinook and Steelhead.  
The CBWTP works through ten qualified local entities (QLEs).  The QLEs now include four state water agencies and six nonprofit organizations.  These QLEs receive funds to implement and monitor water transactions in multiple priority watersheds throughout the Columbia Basin.  
Since 2002, the QLEs have completed over 450 water right transactions that have restored over 1.29 million acre-feet of flow to key tributary streams in the Columbia Basin.  These transactions have included a number of innovative methods, including split-season leases, source switches, permanent purchases and water produced through significant capital investments in irrigation efficiency projects.  The term of these deals has varied from short-term to permanent.  The CBWTP anticipates that transactions funded during the upcoming year will include long-term and permanent deals providing instream benefits beyond the year of funding.
Account Type(s):
Expense
Contract Start Date:
10/01/2017
Contract End Date:
09/30/2018
Current Contract Value:
$4,304,405
Expenditures:
$4,304,405

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Outreach completed A: 99. NFWF - Public Presentations 09/30/2018 09/30/2018
Work with contractors complete B: 119. NFWF - Subcontract Development, Management, and Procedure Modification 09/30/2018 09/30/2018
Annual and monthly records kept C: 119. NFWF - Task Invoicing and Record Keeping 09/30/2018 09/30/2018
Transactions proposed, reviewed and recommended D: 119. NFWF - Transaction Proposals, Solicitation, and Recommendation 09/30/2018 09/30/2018
Completed annual report E: 132. NFWF - Annual Report For FY17 09/30/2018 09/30/2018
Report completed F: 132. NFWF - RM&E Report for the period for CY2016 09/30/2018 09/30/2018
Reports Completed G: 141. Other Reports for BPA 09/30/2018 09/30/2018
Data collected, captured, created and/or validated H: 157. NFWF - Collect / Generate / Validate field Data for Water Transactions 09/30/2018 09/30/2018
Maintenance complete I: 160. NFWF - Website and Database Maintenance 09/30/2018 09/30/2018
Environmental Compliance J: 165. NFWF- Environmental Compliance for CBWTP 09/30/2018 09/30/2018
Monitoring Plan Developed K: 174. NFWF - Develop monitoring and compliance procedures 09/30/2018 09/30/2018
Coordination Completed M: 189. NFWF - Coordination with State Water Resources Agencies & other Partners 09/30/2018 09/30/2018
Coordination Completed N: 189. NFWF - Qualified Local Entity Coordination and Support 09/30/2018 09/30/2018
Coordination Completed O: 189. NFWF- Qualified Local Entity Meetings and Information exchange 09/30/2018 09/30/2018
Presentations and outreach completed P: 99. QLEs - Provide outreach and education - event/conference speaking 09/30/2018 09/30/2018
Administrative tasks completed Q: 119. QLEs - Manage and Administer Project as part of CBWTP 09/30/2018 09/30/2018
Gauges installed R: 148. QLEs - Install flow measuring device at certain Project Streams 09/30/2018 09/30/2018
Data collected, captured, created and generated S: 157. QLEs - Collect / Generate / Validate Field Data for Water Transactions 09/30/2018 09/30/2018
Plans Produced T: 174. QLEs - Strategic Planning 09/30/2018 09/30/2018
Meetings held U: 189. QLEs - - Regional Coordination 09/30/2018 09/30/2018
Local Coordination V: 191. QLEs - Local watershed Coordination 09/30/2018 09/30/2018
Identify and Select Water Transactions for Development W: 114. CFC - Identify and Select Water Transactions for Development 09/30/2018 09/30/2018
Water Transactions Proposed and/or Completed X: 154. CFC - Develop water transactions for implementation 09/30/2018 09/30/2018
Water transactions identified and selected Y: 114. DRC - Identify and Select Water Transactions for FY17 Development 09/30/2018 09/30/2018
Water Transactions researched Z: 154. DRC - Develop and Negotiate Water Right Transactions 09/30/2018 09/30/2018
FY '18 transactions initiated and/or complete AA: 114. IDWR - Identify and Select Water Transactions for FY17 Development 09/30/2018 09/30/2018
FY '18 work for water transactions completed AB: 154. IDWR - Develop and Negotiate water transactions 09/30/2018 09/30/2018
FY 18 transactions initiated and/or complete AC: 114. TFT - Identify and Select Water Transactions for FY17 Development 09/30/2018 09/30/2018
Water Transactions Proposed and/or Completed AD: 154. TFT - Develop and Negotiate Water Right Transactions 09/30/2018 09/30/2018
Water transactions identified and selected AE: 114. TU-MWP - Identify and Select Water Transactions for FY 17 Development 09/30/2018 09/30/2018
Transactions Developed AF: 154. TU-MWP - Develop water transaction for implementation 09/30/2018 09/30/2018
Water transactions identified and selected AG: 114. TU-WWP - Identify and Select Water Transactions for Development 09/30/2018 09/30/2018
Water transaction checklist and associate documentation for proposed transactions AH: 154. TU-WWP - Develop water transaction for implementation 09/30/2018 09/30/2018
projects identified AI: 114. WWT - Identify and Select Water Transactions for FY 17 Development 09/30/2018 09/30/2018
Water Transactions Developed AJ: 154. WWT - Develop and Negotiate Water Right Transactions 09/30/2018 09/30/2018
Transaction Complete AK: 164. NFWF- Water Transactions TBD 09/30/2018 09/30/2018
transaction complete AL: 164. 35c-12 WWT (Teanaway No. 4 - 2012) 09/30/2018 09/30/2018
transaction complete AM: 164. 263d-12 TFT (Roberts Creek Wilderness Water Coop 10 YR) 09/30/2018 09/30/2018
transaction complete AN: 164. 428b-15 TFT (JD_ReynoldsCrk_MH_2015) 09/30/2018 09/30/2018
transaction complete AO: 164. 407b-14 TFT (HD_Fifteenmile_WF_2014a) 09/30/2018 09/30/2018
Transaction Complete AP: 164. 447b-16 TFT (GR_LostineCW_Pivot_WW_2016) 09/30/2018 09/30/2018
Transaction Complete AQ: 164. 452-16 WWT (2016 Teanaway Purchase Program_A) 09/30/2018 09/30/2018
Transaction Complete AR: 164. 115d-17 TFT (UJD_StandardCrk_PV_2017) 09/30/2018 09/30/2018
Transaction Complete AS: 164. 386d-15 TUMT (Sauerkraut_20 Yr Lease_2018_2037) 09/30/2018 09/30/2018
Transaction Complete AT: 164. 13g-17 WWT - Teanaway River No. 2 Acquisition 09/30/2018 09/30/2018
Transaction Complete AU: 164. 374b-18 (TetonBasin_SpringCreek_MS_2018_FTR 09/30/2018 09/30/2018
Transaction Complete AV: 164. 418d-16 (HD_FifteenmileCrk_FAST_2017 09/30/2018 09/30/2018
Transaction Complete AW: 164. 459-16 (Goat and Meadow Creek Acquisition 2017) 09/30/2018 09/30/2018
Transaction Complete AX: 164. 234b-16 (WWT-First Creek #1-2016 Acquisition) 09/30/2018 09/30/2018
Transaction Complete AY: 164. 114b-17 (CFC_Ninemile_HMM_2017 lease) 09/30/2018 09/30/2018
Transaction Complete AZ: 164. 437e-18 (UJD_Rock Crk_AR_2018) 09/30/2018 09/30/2018
Transaction Complete BA: 164. 426c18 (UJD_ReynoldsCrk_DG_2018) 09/30/2018 09/30/2018
Transaction Complete BB: 164. 07b-18 (CFC_Blackfoot_Poorman Acquisition) 09/30/2018 09/30/2018
Transaction Complete BC: 164. 445c-17 (UJD_BeechCrk_BPT_2018-2027) 09/30/2018 09/30/2018
Transaction Complete BD: 164. 447d-17 (WA_Lostine_WW_2018-2019) 09/30/2018 09/30/2018
Transaction Complete BE: 164. 438d-18 (HD_FifteenmilesLeasing_2018) 09/30/2018 09/30/2018
Transaction Complete BF: 164. 29h-18 (Big Hat Lease 2018-2022) 09/30/2018 09/30/2018
Transaction Complete BG: 164. 127g-17 (Morgan Creek 2018) 09/30/2018 09/30/2018
Transaction Complete BH: 164. 71o-17 (AWLP 2018) 09/30/2018 09/30/2018
Transaction Complete BI: 164. 474-18 (UJD_FoxCrk_RH_2018) 09/30/2018 09/30/2018
Transaction Complete BJ: 164. 475-18 (UJD_FoxCrk_MC_2018) 09/30/2018 09/30/2018
Transaction Complete BK: 164. 92h-18 (WA_Lostine_MFA_2018-2019) 09/30/2018 09/30/2018
Transaction Complete BL: 164. 440b-17 (Upper Yakima River Tributary Instream Flow Phase 2 09/30/2018 09/30/2018
Transaction Complete BM: 164. 376b-18 TetonBasin_SpringCreek_EB_2018_FTR 09/30/2018 09/30/2018
Transaction Complete BN: 164. 375b-18 TetonBasin_SpringCreek_LB_2018_FTR 09/30/2018 09/30/2018
Transaction Complete BO: 164. 373b-18 (TetonBasin_SpringCreek_Tetonia_2018_FTR 09/30/2018 09/30/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Deschutes River Summer/Fall ESU
  • 2 instances of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 174 Produce Plan
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 2 instances of WE 114 Identify and Select Projects
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 8 instances of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 1 instance of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 4 instances of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 2 instances of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 174 Produce Plan
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened)
  • 1 instance of WE 174 Produce Plan
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 4 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 2 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 3 instances of WE 114 Identify and Select Projects
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 14 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 7 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 174 Produce Plan
Steelhead (O. mykiss) - Upper Willamette River DPS (Threatened)
  • 1 instance of WE 174 Produce Plan
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 164 Acquire Water Instream
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 3 instances of WE 164 Acquire Water Instream
Cutthroat Trout, Yellowstone (O. c. bouvieri)
  • 4 instances of WE 164 Acquire Water Instream
Trout, Brook (Salvelinus fontinalis)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 2 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 2 instances of WE 164 Acquire Water Instream
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 99 NFWF - Public Presentations 10/01/2017
B 119 NFWF - Subcontract Development, Management, and Procedure Modification 10/01/2017
C 119 NFWF - Task Invoicing and Record Keeping 10/01/2017
D 119 NFWF - Transaction Proposals, Solicitation, and Recommendation 10/01/2017
E 132 NFWF - Annual Report For FY17 10/01/2017
F 132 NFWF - RM&E Report for the period for CY2016 10/01/2017
G 141 Other Reports for BPA 10/01/2017
H 157 NFWF - Collect / Generate / Validate field Data for Water Transactions 08/30/2017
I 160 NFWF - Website and Database Maintenance 10/01/2017
J 165 NFWF- Environmental Compliance for CBWTP 10/01/2017
K 174 NFWF - Develop monitoring and compliance procedures 08/30/2017
L 185 Periodic Status Reports for BPA 10/01/2017
M 189 NFWF - Coordination with State Water Resources Agencies & other Partners 10/01/2017
N 189 NFWF - Qualified Local Entity Coordination and Support 10/01/2017
O 189 NFWF- Qualified Local Entity Meetings and Information exchange 10/01/2017
P 99 QLEs - Provide outreach and education - event/conference speaking 10/01/2017
Q 119 QLEs - Manage and Administer Project as part of CBWTP 10/01/2017
R 148 QLEs - Install flow measuring device at certain Project Streams 10/01/2017
S 157 QLEs - Collect / Generate / Validate Field Data for Water Transactions 08/30/2017
T 174 QLEs - Strategic Planning 10/01/2017
U 189 QLEs - - Regional Coordination 10/01/2017
V 191 QLEs - Local watershed Coordination 10/01/2017
W 114 CFC - Identify and Select Water Transactions for Development 10/01/2017
X 154 CFC - Develop water transactions for implementation 10/01/2017
Y 114 DRC - Identify and Select Water Transactions for FY17 Development 10/01/2017
Z 154 DRC - Develop and Negotiate Water Right Transactions 10/01/2017
AA 114 IDWR - Identify and Select Water Transactions for FY17 Development 10/01/2017
AB 154 IDWR - Develop and Negotiate water transactions 10/01/2017
AC 114 TFT - Identify and Select Water Transactions for FY17 Development 10/01/2017
AD 154 TFT - Develop and Negotiate Water Right Transactions 10/01/2017
AE 114 TU-MWP - Identify and Select Water Transactions for FY 17 Development 10/01/2017
AF 154 TU-MWP - Develop water transaction for implementation 10/01/2017
AG 114 TU-WWP - Identify and Select Water Transactions for Development 10/01/2017
AH 154 TU-WWP - Develop water transaction for implementation 10/01/2017
AI 114 WWT - Identify and Select Water Transactions for FY 17 Development 10/01/2017
AJ 154 WWT - Develop and Negotiate Water Right Transactions 10/01/2017
AK 164 NFWF- Water Transactions TBD 08/30/2017
AL 164 35c-12 WWT (Teanaway No. 4 - 2012) 08/31/2017
AM 164 263d-12 TFT (Roberts Creek Wilderness Water Coop 10 YR) 08/31/2017
AN 164 428b-15 TFT (JD_ReynoldsCrk_MH_2015) 08/31/2017
AO 164 407b-14 TFT (HD_Fifteenmile_WF_2014a) 10/01/2017
AP 164 447b-16 TFT (GR_LostineCW_Pivot_WW_2016) 08/31/2017
AQ 164 452-16 WWT (2016 Teanaway Purchase Program_A) 08/31/2017
AR 164 115d-17 TFT (UJD_StandardCrk_PV_2017) 08/31/2017
AS 164 386d-15 TUMT (Sauerkraut_20 Yr Lease_2018_2037) 08/31/2017
AT 164 13g-17 WWT - Teanaway River No. 2 Acquisition 08/31/2017
AU 164 374b-18 (TetonBasin_SpringCreek_MS_2018_FTR
AV 164 418d-16 (HD_FifteenmileCrk_FAST_2017
AW 164 459-16 (Goat and Meadow Creek Acquisition 2017)
AX 164 234b-16 (WWT-First Creek #1-2016 Acquisition)
AY 164 114b-17 (CFC_Ninemile_HMM_2017 lease)
AZ 164 437e-18 (UJD_Rock Crk_AR_2018)
BA 164 426c18 (UJD_ReynoldsCrk_DG_2018)
BB 164 07b-18 (CFC_Blackfoot_Poorman Acquisition)
BC 164 445c-17 (UJD_BeechCrk_BPT_2018-2027)
BD 164 447d-17 (WA_Lostine_WW_2018-2019)
BE 164 438d-18 (HD_FifteenmilesLeasing_2018)
BF 164 29h-18 (Big Hat Lease 2018-2022)
BG 164 127g-17 (Morgan Creek 2018)
BH 164 71o-17 (AWLP 2018)
BI 164 474-18 (UJD_FoxCrk_RH_2018)
BJ 164 475-18 (UJD_FoxCrk_MC_2018)
BK 164 92h-18 (WA_Lostine_MFA_2018-2019)
BL 164 440b-17 (Upper Yakima River Tributary Instream Flow Phase 2
BM 164 376b-18 TetonBasin_SpringCreek_EB_2018_FTR
BN 164 375b-18 TetonBasin_SpringCreek_LB_2018_FTR
BO 164 373b-18 (TetonBasin_SpringCreek_Tetonia_2018_FTR