Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 78044: 2010-001-00 EXP BARKLEY BEAR IMPLEMENTATION
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
78044
Contract Title:
2010-001-00 EXP BARKLEY BEAR IMPLEMENTATION
Contract Continuation:
Previous: Next:
74958: 2010-001-00 EXP BARKLEY BEAR PRE-IMPLEMENTATION
  • 79769: 2010-001-00 EXP BARKLEY BEAR IMPLEMENTATION
Contract Status:
Closed
Contract Description:
Methow Salmon Recovery Foundation (MSRF) and its partners, including BPA, Bureau of Reclamation (Reclamation), and UCSRB plan to implement a reach-scale salmon habitat enhancement project in the Middle Methow (M2) River in FY 2019. The Barkley Bear Pre-Implementation Project will conduct project development and environmental compliance activities in advance of the implementation contract for the M2 Barkley Bear Habitat Project funded through the BPA targeted solicitation process.

The goal of this Barkley Bear pre-implementation contract would be to work with BPA, UCSRB, the Bureau of Reclamation, and USGS to develop and design a preferred alternative (selected in the previous contract) for implementation at the site and to complete state, local, and BPA's federal EC requirements as early in the process as feasible in order to ensure completion of these requirements within the respective timelines, to allow construction to proceed in summer 2019.

Project development activities for this project include on-site vegetation surveys, topographic surveys, hydrologic monitoring and data collection, wetland delineation, fish surveys (presence/absence/use), photo points, alternative development, landowner/stakeholder outreach and coordination, and related project coordination activities.  MSRF will also coordinate with BPA to implement the HIP III design/review process for the larger implementation project.

Environmental compliance for this pre-implementation effort includes Section 106 cultural consultation, limited federal Section 7 ESA consultation with BPA via the HIP3 process & other pertinent regulatory agencies (USFWS and NOAA) as needed for pre-implementation activities such as surveying, geotechnical investigations, or installation of test wells.  The state-required SEPA process was completed previously for the reach-based M2 project prior to work at Whitefish Island (2012) and WDFW Floodplain (2013).  Other permitting processes completed through APPS for  the WDFW Hydraulic Project Authorization and the JARPA process for Corps of Engineers Nationwide permits, county shorelines and floodplain development, and water quality permits may also be initiated and/or completed in this contract if sufficient design information is completed during the contract period.  

Lastly, under this contracting action, MSRF will establish contracts for purchase and delivery of large woody debris (LWD) for use instream in the Middle Methow River (M2) for habitat enhancement actions. The Barkley Bear Habitat project is planning for LWD needs for implementation over the next year (2019).  Logs procured will be stored at the Barkley Bear site.    

MSRF will not submit an annual report under this contract.  MSRF will provide the Upper Columbia Salmon Recovery Board (UCSRB) sufficient information so they, UCSRB, can assemble a comprehensive annual report for all contracts under project #2010-001-00 including this contract. Report will then be submitted by the Upper Columbia Salmon Recovery Board (UCSRB) to BPA under contract 77842 and/or the follow-on to that contract in this project 2010-001-00 to fulfill deliverable. UCSRB will submit and upload report under project 2010-001-00, Upper Columbia Programmatic Habitat in FFY18.
Account Type(s):
Expense
Contract Start Date:
02/15/2018
Contract End Date:
08/31/2018
Current Contract Value:
$49,469
Expenditures:
$49,469

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Roy Beaty Bonneville Power Administration Yes F&W Approver rebeaty@bpa.gov (503) 230-5213
Joseph Connor Bonneville Power Administration Yes COR jwconnor@bpa.gov (503) 230-3172
Brian Fisher Methow Salmon Recovery Foundation Yes Technical Contact brian@methowsalmon.org (509) 387-1716
Jessica Goldberg Methow Salmon Recovery Foundation Yes Contract Manager jessica@methowsalmon.org (360) 624-3592
Chris Johnson Methow Salmon Recovery Foundation Yes Supervisor chrisj@methowsalmon.org (509) 996-2787
Joy Juelson Upper Columbia Salmon Recovery Board No Interested Party joy.juelson@ucsrb.org (509) 433-2999
Rachel Kulak Bonneville Power Administration Yes Contracting Officer rakulak@bpa.gov (503) 230-5091
Peter Lofy Bonneville Power Administration No Supervisor ptlofy@bpa.gov (503) 230-4193
Deb Nickell Methow Salmon Recovery Foundation Yes Administrative Contact deb@methowsalmon.org (509) 996-2787
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Katy Williams Methow Salmon Recovery Foundation Yes Administrative Contact katy@methowsalmon.org (509) 996-2787
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete Environmental Compliance permitting processes A: 165. Obtain Required Permits, Authorizations, and Documentation for the Barkley Bear project 08/31/2018
Complete Requested Section 106 Compliance Activities B: 165. Ongoing Section 106 Compliance Activities - Active Methow Watershed Projects 08/31/2018 08/30/2018
Effective implementation management and timely contract administration C: 119. Manage BPA Contracting Requirements 08/31/2018 08/31/2018
Obtain data to support final designs D: 115. Obtain Data to Inform Final Project Design 08/31/2018 08/31/2018
Final Project Designs and Specifications E: 174. Develop Final Project Designs 08/31/2018
Watershed-wide coordination with stakeholders, interested public, and cooperating entities F: 191. Watershed Stakeholder Coordination and Outreach 08/31/2018 08/31/2018
Maintain native riparian plantings G: 198. Establish Native Riparian Plantings outside of future construction zones 08/31/2018 08/31/2018
Construction Management Complete H: 100. Pre-Implementation Construction Management Activities 08/31/2018
Contract for LWD purchase and delivery I: 29. LWD Procurement - Barkley Bear Habitat Project 08/31/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Required Permits, Authorizations, and Documentation for the Barkley Bear project 02/15/2018
B 165 Ongoing Section 106 Compliance Activities - Active Methow Watershed Projects 02/15/2018
C 119 Manage BPA Contracting Requirements 02/15/2018
D 115 Obtain Data to Inform Final Project Design 03/01/2018
E 174 Develop Final Project Designs 02/15/2018
F 191 Watershed Stakeholder Coordination and Outreach 02/15/2018
G 198 Establish Native Riparian Plantings outside of future construction zones 03/01/2018
H 100 Pre-Implementation Construction Management Activities 02/15/2018
I 29 LWD Procurement - Barkley Bear Habitat Project 03/21/2018
J 185 Periodic Status Reports for BPA 02/15/2018
K 132 Provide Information to UCSRB for Programmatic Annual Report 02/15/2018