Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 78279: 2010-001-00 CAP BARKLEY IRRIGATION - MVID
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
78279
Contract Title:
2010-001-00 CAP BARKLEY IRRIGATION - MVID
Contract Continuation:
Previous: Next:
70143: 2010-001-00 CAP BARKLEY IRRIGATION - MVID
Contract Status:
Closed
Contract Description:
Cultural Resources:

Cultural Resource surveys for this project were conducted under FY15 contract number 70143 and a current FY17 contract number 76789.  Additionally, mitigation for Cultural Resources for this project was already completed by BPA.  The final addendum report will be submitted to BPA in mid-December.

ESA consultation:

The HIP3 project notification form has been submitted to the regulatory agencies.  The consultation is complete.
______________________________________________________________________________________________________________________________________________________________________________________


Trout Unlimited will be working with BPA and our partners on an extensive upgrade to the Barkley Irrigation Company (BIC) Infrastructure.  BIC has been purveying water to users on the Barkley shareholders in the same way for the past 110 years. The ditch currently delivers water through a gravity system to users irrigating over  600 acres.  The proposed project would eliminate the present diversion and move it 4 miles downstream to the already existing MVID east-side diversion and convert the open ditch to an in gravity pressure and pumped pressurized pipe system. The existing ditch is estimated to be about 26,000 feet in length. Design and construction will include pipe type and sizes, route selection, road crossing details, turnouts, metering requirements, etc.

In the past construction of a wing-dam and cleaning of the intake channel to divert water into the Barkley Ditch has impacted important habitat for adult spring Chinook pre-spawning holding and rearing habitat for juvenile salmon and steelhead. These impacts have occurred at the diversion wing-dam, in over 1,000 feet of Methow River side channel and within 2,500 feet of the Barkley canal, upstream of the fish screen, where the Barkley cleans and clears the ditch for water delivery, prior to the fish screen approximately 2500 feet downstream.  In addition to preventing the historic diversion activities the project will improve instream flow in this critical reach of the Methow river and create a state of the art system, which will efficiently deliver water to the BIC share holders.

Specfic Metrics
2.3: Injury and Mortality: Mechanical Injury – 1 mile habitat access
1.1 Habitat Quality: Anthropogenic Barriers – 0.2 mile habitat accessed Bear Creek
9.2:  Decreased Water Quantity: Water Quantity – 8 miles alternate source and efficiency

In addition there is a direct link between the Barkley Project and MVID, because since 1921 they have shared a long portion of ditch.  Trout Unlimited has already worked with MVID to pipe over 5 miles of their infrastructure on the east side . However the upper four miles remain unimproved and earthen.  The lower ~2  miles of MVID are currently commingled with the end of the Barkley Ditch and in the future over 4 miles of the alignment will be shared.  As a result of this project, Barkley will  share the MVID diversion structure and divert their water from the MVID east-side headworks.  By marring the Barkley and MVID we are completely eliminating the need to provide Barkley with a new Methow River diversion.  In addition to them sharing a diversion long into the future there are numerous reasons we need to pipe both systems to make the project work and create efficiency.
Account Type(s):
Capital
Contract Start Date:
03/15/2018
Contract End Date:
06/19/2019
Current Contract Value:
$1,099,178
Expenditures:
$1,099,178

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Jamie Cleveland Bonneville Power Administration Yes COR jacleveland@bpa.gov (503) 230-3160
Joseph Connor Bonneville Power Administration Yes Technical Contact jwconnor@bpa.gov (503) 230-3172
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Lisa Pelly Trout Unlimited (TU) Yes Supervisor lpelly@tu.org (509) 888-0970
Aaron Penvose Trout Unlimited (TU) Yes Contract Manager apenvose@tu.org (509) 888-0970
Sarah Walker Upper Columbia Salmon Recovery Board No Interested Party sarah.walker@ucsrb.org (509) 630-8226
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Elham Zolmajd-Haghighi Bonneville Power Administration Yes CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete Environmental Compliance Permitting Processes A: 165. Obtain Required Permits, Authorizations, and Documentation for the Project 03/14/2019 12/14/2018
Effective implementation management and timely contract administration B: 119. Manage BPA Contracting Requirements 06/19/2019 06/18/2019
Pipeline Installed C: 203. Purchase Pipe for Barkley 06/19/2019 06/10/2019
Ordered and installed functioning pipeline for MVID water conveyance. D: 203. Purchase Pipe for MVID 06/19/2019 06/10/2019
Eliminate Use of Historic Barkley Diversion E: 84. Remove Historic Barkley Irrigation Diversion 06/19/2019
Checklist Developed & Attached in Pisces F: 154. Develop Checklist 07/31/2018 06/15/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 203 Install Water Conservation Measure
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 203 Install Water Conservation Measure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Required Permits, Authorizations, and Documentation for the Project 02/01/2018
B 119 Manage BPA Contracting Requirements 02/01/2018
C 203 Purchase Pipe for Barkley 12/26/2018
D 203 Purchase Pipe for MVID 12/14/2018
E 84 Remove Historic Barkley Irrigation Diversion 12/14/2018
F 154 Develop Checklist 02/01/2018
G 185 Periodic Status Reports for BPA 02/01/2018
H 132 Provide Information to UCSRB for Programmatic Annual Report 02/01/2018