Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 78366: 2011-006-00 EXP QCI CHAMP GEAR COORDINATOR
Project Number:
Title:
Columbia Habitat and Monitoring Program - (CHAMP)
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
78366
Contract Title:
2011-006-00 EXP QCI CHAMP GEAR COORDINATOR
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
The Columbia Habitat Monitoring Program (CHaMP; BPA Project number 2011-006-00) was initiated in 2011. As of 2017, the standardized CHaMP protocol was employed in 16 watersheds; 15 in the interior Columbia River Basin, and 1 in California. Programmatic funding for CHaMP survey efforts has been discontinued for calendar year 2018, although sampling will continue for a limited subset of watersheds funded through the Columbia Basin Fish Accord or other sources; including: 1) the Yankee Fork of the Salmon River (Shoshone-Bannock Tribe); 2) the South and Middle Fork of the John Day River (Oregon Department of Fish and Wildlife); 3) and the upper Grande Ronde River (Oregon Department of Fish and Wildlife and Columbia River Inter-Tribal Fish Commission).
Similar to CHaMP, a related project, the Integrated Status and Effectiveness Monitoring Project (ISEMP; BPA Project Number 2003-017-00) has undergone a reduction in scope for calendar year 2018. Specifically, field survey efforts in the upper-Columbia and John Day watersheds have been largely discontinued.

This contract funds Quantitative Consultants, Inc. (QCI) to collect, inventory, repair or dispose of, and distribute or store CHaMP and ISEMP sampling equipment from those groups that will not prosecute survey efforts in calendar year 2018.

Both programs (ISEMP and CHaMP) maintain an extensive inventory of sampling equipment. Following the collection of equipment, QCI will prepare an inventory report, comparing equipment received against standing project inventories; specifically identifying lost or destroyed equipment. Accompanying that inventory will be an assessment of equipment disposition, noting items that are irreparable and those in need of repair. At BPA’s direction, a final inventory will be prepared and equipment will be repaired, disposed of, or stored in current condition. Similarly, at BPA’s discretion, inventory will be distributed to those groups that will prosecute sampling efforts in 2018. Per direction from BPA equipment distribution will be either permanent (transferred to the inventory of those groups) or issued with the intent that it will be returned at the termination of survey efforts.
Account Type(s):
Expense
Contract Start Date:
02/15/2018
Contract End Date:
01/31/2019
Current Contract Value:
$7,276
Expenditures:
$7,276

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Time and Materials
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mike Ackerman Biomark, LLC. Yes Contract Manager mike.ackerman@merck.com (208) 469-0896
Chris Beasley Biomark, LLC. Yes Supervisor chris.beasley@merck.com (360) 620-2883
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Kristen Jule Bonneville Power Administration Yes F&W Approver krjule@bpa.gov (503) 230-3588
Jody Lando Bonneville Power Administration Yes COR jblando@bpa.gov (503) 267-9006
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Manage contract 01/31/2019 01/31/2019
Collection, maintenance, and storage of ISEMP/CHaMP equipment. C: 189. ISEMP/CHaMP Equipment Collection, maintenance, and storage 07/31/2018 07/31/2018
CHaMP Inventory Report D: 141. CHaMP Inventory Report 01/31/2019 01/31/2019
ISEMP Inventory Report E: 141. ISEMP Inventory Report 08/15/2018 08/15/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/15/2018
B 119 Manage contract 02/15/2018
C 189 ISEMP/CHaMP Equipment Collection, maintenance, and storage 02/15/2018
D 141 CHaMP Inventory Report 02/15/2018
E 141 ISEMP Inventory Report 02/15/2018
F 132 No annual progress report needed 02/15/2018