Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 78880: 2000-015-00 EXP JOHN DAY PLANT NURSERY
Project Number:
Title:
Upper John Day Conservation Lands Program
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
78880
Contract Title:
2000-015-00 EXP JOHN DAY PLANT NURSERY
Contract Continuation:
Previous: Next:
75472: 2001-041-01 EXP NURSERY MANAGEMENT AT FORREST
Contract Status:
Closed
Contract Description:
The John Day Native Plants Nursery Program started in 2004 under the John Day Watershed Restoration Project (1998-018-00; aka 2007-397-00). In 2011, the nursery program was moved under the Forrest Conservation Area Project (2001-041-01) because of county land zoning and the project's ability to generate revenue.  This contract is now (as of 4.1.18) under the merged project -Upper John Day Conservation Lands Program.  This contract will fund work to propagate, grow, and out-plant roughly 15,000 plants for the Tribes' BPA-funded projects including the Forrest Conservation Area, the Oxbow Conservation Area, and the John Day Watershed Restoration Project. The nursery will also assist with growing plants for partners including federal and state agencies where project goals seek to enhance anadromous fish habitat. Plants produced under this contract may be planted at conservation project sites throughout the John Day River Basin that aim to protect, manage, and enhance habitat that support culturally significant fish populations.

This Contract funds two full-time staff and partially funds other staff as needed. This contract will fund operations and maintenance of the nursery program including utilities, supplies, office support, and travel/transportation. This contract shares some materials and support from the main Forrest Conservation Area operations and maintenance contract.

Projected propagation for 2018:
seedlings: 20,000-25,000
rooted cuttings: 5,000

Nursery Program Core Components:
Greenhouse: one 30'x72' structure with gravel floors, polycarbonate siding and ceiling, automated overhead boom irrigation, electricity, and propane heat. Greenhouse propagation capacity is between 20,000 and 30,000 depending on plant container size.

Coldframes: two 20'x48' structures for overwintering plants.

Outdoor Nursery (stoolbeds): 1.79 acres containing roughly 600 native plants. Current irrigation systems are drip and overhead sprinkler run on gas pumps. Anticipated 2018 vegetative-cutting harvest from the nursery stoolbeds is roughly 5,000 depending on project orders.

Outdoor Shade Areas: approximately 2000 square feet of outdoor shaded growing area.

Seed Lab: indoor laboratory space for cleaning, drying, and treating seed.

Walk-in Cooler: 6'x6' cooler for storing and stratifying seed.
Account Type(s):
Expense
Contract Start Date:
04/01/2018
Contract End Date:
03/31/2019
Current Contract Value:
$184,765
Expenditures:
$184,765

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Nursery Contract Management 03/31/2019 03/29/2019
Complete Management of Environmental Compliance B: 165. Environmental Compliance Management 03/31/2019 03/29/2019
Plant Production and Facilities Annual Report C: 186. Nursery Management 03/31/2019 03/29/2019
Maintain Stooling Beds D: 198. Maintain Nursery Stoolbed Plantings 03/31/2019 03/29/2019
Control Weeds E: 199. Invasive/Non-native Plant Control 03/31/2019 03/29/2019
Promote Native Plants and Nursery Activities in the John Day Basin F: 99. Program Outreach & Education Activities 03/31/2019 03/29/2019
Completed Annual Report H: 132. Submit Progress Report for the Period (April 2017) to (March 2018) 01/31/2019 01/31/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Nursery Contract Management 04/01/2018
B 165 Environmental Compliance Management 04/01/2018
C 186 Nursery Management 01/12/2018
D 198 Maintain Nursery Stoolbed Plantings 01/12/2018
E 199 Invasive/Non-native Plant Control 01/12/2018
F 99 Program Outreach & Education Activities 04/01/2018
G 185 Periodic Status Reports for BPA 04/01/2018
H 132 Submit Progress Report for the Period (April 2017) to (March 2018) 04/01/2018