Contract 79758: 2010-001-00 EXP TWISP RIVER FLOODPLAIN PHASE II - IMPLEMENTATION
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
79758
Contract Title:
2010-001-00 EXP TWISP RIVER FLOODPLAIN PHASE II - IMPLEMENTATION
Contract Continuation:
Previous: Next:
76637: 2010-001-00 EXP TWISP RIVER FLOODPLAIN PHASE II - PRE-IMPLEMENT
Contract Status:
Closed
Contract Description:
Methow Salmon Recovery Foundation (MSRF) and its partners, including Bureau of Reclamation (Reclamation), Bonneville Power Administration (BPA), Upper Columbia Salmon Recovery Board (UCSRB), and Methow Conservancy plan to implement a reach-scale salmon habitat enhancement project in the Lower Twisp River between 2015 and 2019. This contract will fund final project development and implementation activities in support of the Twisp River Floodplain Phase II Project funded through the UCSRB targeted solicitation process.  The project is an expansion of the previously funded Phase I project implemented in 2015-16; contract #s: 69930,66397, and 62758.

Ongoing project development activities for this project include on-site vegetation surveys, topographic surveys, hydrologic monitoring and data collection, wetland delineation, fish surveys (presence/absence/use), photo points, concept development, landowner/stakeholder outreach and coordination, and related project coordination activities.  MSRF will also coordinate with BPA to complete the HIP III design/review process for the project and will complete all necessary local, state, and federal permitting processes prior to project implementation.

In addition to HIP III review, environmental compliance for this project includes Section 106 cultural consultation, limited federal Section 7 ESA consultation (USFWS and NOAA) as needed for pre-implementation activities such as large wood staging, and the state-required SEPA process.   EC has already been completed under previous contracts for pre-implementation activities such as surveying and installation of test wells.  Other permitting processes completed through the JARPA, including the WDFW Hydraulic Project Authorization, Corps of Engineers Nationwide permits, county shorelines and floodplain development, and water quality permits may also be initiated and/or completed in this contract if sufficient design information is completed during the contract period.

Lastly, under this contracting action, MSRF will establish contracts for project construction and revegetation/site restoration to be completed under this contract. MSRF will contract for purchase and delivery of large woody debris (LWD) for use instream in the Twisp River Floodplain Phase II project for habitat enhancement actions.

The goal of this  contract would be to work with BPA, Reclamation, and UCSRB to finalize design for a preferred alternative for implementation at the site; to complete state, local, and BPA's federal EC requirements as early in the process as feasible in order to ensure completion of these requirements within the respective timelines; to procure construction materials; and to complete construction contracting and to proceed with project implementation the in summer 2019 work window.

The contractor (MSRF), its designated agents, sub-consultants and project stakeholders will be available, responsive and will collaboratively address contract related issues during the term of the contract. Contract issues include but are not limited to technical, policy, regulatory, project management and associated elements related to the project. Successful execution of this contract is contingent on alignment of the preceding contract issues with the BPI and BPA contracting processes, project management plans, design review protocols (including but not limited to BPA RRT design review, and integration of input and comments from BPA).

MSRF Contract Manager and their design consultant will all cooperate, coordinate, collaborate, and maintain effective communication with BPA PM/COR, EC Lead, RRT Lead, and Hydraulic Engineer during the entire length of this design contract. MSRF and its subcontractors will address BPA comments and concerns, and the two entities will arrive at a mutual beneficial consensus. MSRF contract manager will upload all the subcontracts executed under this contract cbfish.org.

MSRF will not submit an annual report under this contract. MSRF will provide the Upper Columbia Salmon Recovery Board (UCSRB) sufficient information so they, UCSRB, can assemble a comprehensive annual report for all contracts under project #2010-001-00 including this contract. Report will then be submitted by the Upper Columbia Salmon Recovery Board (UCSRB) to BPA under contract 77842 and/or the follow-on to that contract in this project 2010-001-00 to fulfill deliverable. UCSRB will submit and upload report under project 2010-001-00, Upper Columbia Programmatic Habitat in FFY18.  
Account Type(s):
Expense
Contract Start Date:
09/15/2018
Contract End Date:
09/30/2019
Current Contract Value:
$285,189
Expenditures:
$285,189

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete Environmental Compliance Permitting Processes A: 165. Obtain Required Permits, Authorizations, and Documentation for the TRF PH II Project 09/30/2019 09/30/2019
Complete Requested Section 106 Compliance Activities B: 165. Ongoing Section 106 Compliance Activities 09/30/2019 09/30/2019
Effective implementation management and timely contract administration C: 119. Manage BPA Contracting Requirements 09/30/2019 09/30/2019
Construction Management Complete D: 100. Construction Management Activities 08/30/2019 09/30/2019
Complete specified complexity elements E: 29. Instream and Floodplain Complexity Elements 09/30/2019 09/30/2019
Completed channel construction F: 30. Improve Side Channel Connections 09/30/2019 09/30/2019
Final project designs and specifications G: 122. Project Design Development and Coordination 09/30/2019 09/30/2019
Remove levee H: 180. Remove riprap along the Twisp River 08/23/2019 07/23/2019
Establish native riparian vegetation (includes assessment and care the season of planting) I: 47. Plant Native Riparian Vegetation 09/30/2019 09/30/2019
Maintain native riparian plantings J: 198. Maintain Native Riparian Plantings 09/30/2019 09/30/2019
Legal Review K: 172. Legal Review for Flowage Easements 09/30/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Required Permits, Authorizations, and Documentation for the TRF PH II Project 09/15/2018
B 165 Ongoing Section 106 Compliance Activities 09/15/2018
C 119 Manage BPA Contracting Requirements 09/15/2018
D 100 Construction Management Activities 09/15/2018
E 29 Instream and Floodplain Complexity Elements 07/10/2019
F 30 Improve Side Channel Connections 05/02/2019
G 122 Project Design Development and Coordination 09/15/2018
H 180 Remove riprap along the Twisp River 05/02/2019
I 47 Plant Native Riparian Vegetation 05/07/2019
J 198 Maintain Native Riparian Plantings 09/15/2018
K 172 Legal Review for Flowage Easements 09/15/2018
L 185 Periodic Status Reports for BPA 09/15/2018
M 132 (no report is required per COTR) 09/15/2018