Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 80499: 2008-604-00 EXP LATAH SWCD POTLATCH BASIN RESTORATION
Project Number:
Title:
Lower Clearwater and Potlatch Watersheds Habitat Improvements
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
80499
Contract Title:
2008-604-00 EXP LATAH SWCD POTLATCH BASIN RESTORATION
Contract Continuation:
Previous: Next:
76953: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED
  • 82582: 2008-604-00 EXP LATAH SWCD POTLATCH BASIN RESTORATION
Contract Status:
Closed
Contract Description:
This project seeks to restore A-run Snake River Steelhead to a robust, self-sustaining population within the Potlatch River through:

1. Coordinated development of habitat and land management improvement practices on private/public agricultural, forest and range lands,

2. Coordination of interagency watershed planning efforts, continuation of watershed monitoring and

3. Development of outreach programs to landowners, agricultural producers, and the general public.  

The primary objectives of this contract include:

• Identify, plan, design, fund and implement best management practices to improve steelhead habitat within the Potlatch River watershed. Wild Snake River Steelhead are present throughout the various watershed within the Potlatch River drainage.  Best management practices have been designed to enhance conditions within the drainage to address various limiting factors to wild steelhead production and productivity.  Meadow restoration projects within the Big Bear, Little Bear and Corral Creek watersheds have been designed to enhance late spring and summer base flows and minimize some of the extremes in the Potlatch River hydrograph.  Riparian restoration projects are designed to minimize sedimentation and maintain cooler water temperatures as well as enhance stream complexity in the future.  Installation of large woody debris is designed to increase summer and winter rearing habitat. Passage barrier removals are designed to increase access to high quality spawning areas and summer and winter rearing habitat.      

• Coordinate Potlatch River steelhead habitat restoration practices with the following management and restoration plans:
                   *  Clearwater Subbasin Management Plan - Northwest Power and Conservation Council
                   *  Proposed ESA Recovery Plan for Snake River Idaho Spring/Summer Chinook Salmon and Steelhead Populations - NOAA Fisheries
                   *  Potlatch River Subbasin Assessment and TMDLs - Idaho Department of Environmental Quality
                   *  Potlatch River Subbasin Total Maximum Daily Load Implementation Plan for Agriculture - Idaho Department of Environmental Quality, Idaho Soil and Water Conservation Commission and Latah Soil and Water Conservation District
                   *  Potlatch River Watershed Management Plan - Latah Soil and Water Conservation District
• Maintain temperature, flow, and project effectiveness monitoring programs within the Potlatch River system.
• Revise Potlatch River Watershed Management Plan, as needed.

This proposal is consistent with the NWPCC Fish and Wildlife Program’s goal to develop habitat-based programs designed to rebuild healthy, naturally producing fish and wildlife populations by protecting, mitigating, and restoring habitats. This project is consistent with the objectives and strategies of the Clearwater Subbasin Management Plan. In addition, this project supports the recommendations contained within NOAA's ESA Recovery Plan for Snake River Idaho Spring/Summer Chinook Salmon and Steelhead Populations.

The 377,776-acre Potlatch River watershed is located in north-central Idaho and is the largest tributary in the lower Clearwater River.  The Potlatch River is critical to A-run Snake River steelhead.    

In an effort to lower stream temperatures, increase summer flows, decrease surface and channel erosion (and associated nutrient loading), and increase riparian habitat complexities, this project will focus on erosion control, nutrient reduction, and riparian restoration on private/public agricultural, forest and range lands through the implementation of erosion/sediment control structures, livestock exclusion fencing, off-site water developments, native plantings of riparian areas, protection of functional riparian and wetland areas, and enhanced agricultural practices to reduce erosion and nutrient runoff.  Priority tributaries for restoration work, as determined by the Potlatch River Watershed Management Plan, include:  Big Bear Creek, Little Bear Creek, Pine Creek, Cedar Creek, Corral Creek, Little Boulder Creek, Leopold Creek, Potlatch River, Ruby Creek, Moose Creek, Boulder Creek, Pivash Creek, East Fork Potlatch River, Feather Creek, Purdue Creek, Cougar Creek, and Bob's Creek.

Project 2008-604-00 is coordinated with contracts associated with Latah SWCD's Project 2002-061-00.
Account Type(s):
Expense
Contract Start Date:
09/30/2018
Contract End Date:
08/31/2019
Current Contract Value:
$800,691
Expenditures:
$800,691

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Bill Dansart Latah Soil and Water Conservation District (SWCD) Yes Technical Contact bdansart@latahsoil.org (208) 874-3895
Brenda Erhardt Latah Soil and Water Conservation District (SWCD) Yes Technical Contact berhardt@latahswcd.org (208) 874-3821
Trish Heekin Latah Soil and Water Conservation District (SWCD) Yes Technical Contact theekin@latahsoil.org (208) 874-7880
Amy Hines Idaho Governor's Office of Species Conservation Yes Administrative Contact amy.hines@osc.idaho.gov (208) 332-1557
Dave Huggins Latah Soil and Water Conservation District (SWCD) No Supervisor lswcd@latahsoil.org (509) 338-2549
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Jason Marchinek Latah Soil and Water Conservation District (SWCD) Yes Technical Contact jmarchinek@latahswcd.org (208) 874-3788
Claire McClory Bonneville Power Administration Yes Env. Compliance Lead cdmcclory@bpa.gov (503) 230-5922
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Ken Stinson Latah Soil and Water Conservation District (SWCD) Yes Contract Manager kstinson@latahswcd.org (509) 338-2549
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Manage and Administer BPA Contracts 08/31/2019 08/31/2019
Environmental Compliance & Consultation Review B: 165. Verify all Environmental Compliance has been completed (ESA, NEPA, NHPA Section 106, etc.) 06/30/2019 06/30/2019
Project Site Reviews, Conservation Planning/Design, and Proposal Development C: 114. Project Site Reviews, Conservation Planning/Design, and Proposal Development 06/30/2019 06/30/2019
Riparian/Meadow Restoration Design and Cost Estimate to BPA D: 175. Riparian/Meadow Restoration - Upper Tee Meadow Restoration - Finalize Planning and Design 08/31/2019 04/24/2019
Produce final designs for East Fork Potlatch River Phase II E: 175. Planning and design for East Fork Potlatch River Phase II 08/31/2019 08/31/2019
Completed channel construction F: 30. Riparian/Meadow Restoration - Big Bear/Mason - Continuation of Implementation 06/30/2019 06/30/2019
Completed channel construction G: 30. Riparian/Meadow Restoration - Little Bear Creek/Nora Creek - Continue Implementation 06/30/2019 06/30/2019
Initial Phase I Channel Construction Completed H: 30. Riparian/Meadow Restoration - East Fork Potlatch River/USFS - Continuation of Implementation for Phase I 08/31/2019 08/31/2019
Riparian/Meadow Restoration Continued - Upper Corral Creek I: 30. Riparian/Meadow Restoration - Upper Corral Creek/USFS - Continuation of Implementation 06/30/2019 06/30/2019
Evaluate plantings, replant, and perform light vegetation maintenance on sites not explicitly delineated as independent WEs and maintain field operations infrastructure. J: 198. Replant and Maintain Riparian Plantings within Project Areas Previously Constructed 06/30/2019 06/30/2019
Develop and Implement Beaver Relocation Program K: 190. Beaver Relocation Program 06/30/2019 06/30/2019
Completed Annual Report L: 132. Submit Progress Report for the period September 2017 to August 2018 06/30/2019 06/27/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 4 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and Administer BPA Contracts 09/30/2018
B 165 Verify all Environmental Compliance has been completed (ESA, NEPA, NHPA Section 106, etc.) 09/30/2018
C 114 Project Site Reviews, Conservation Planning/Design, and Proposal Development 09/30/2018
D 175 Riparian/Meadow Restoration - Upper Tee Meadow Restoration - Finalize Planning and Design 09/30/2018
E 175 Planning and design for East Fork Potlatch River Phase II 09/26/2018
F 30 Riparian/Meadow Restoration - Big Bear/Mason - Continuation of Implementation 05/21/2019
G 30 Riparian/Meadow Restoration - Little Bear Creek/Nora Creek - Continue Implementation 05/30/2019
H 30 Riparian/Meadow Restoration - East Fork Potlatch River/USFS - Continuation of Implementation for Phase I 09/30/2018
I 30 Riparian/Meadow Restoration - Upper Corral Creek/USFS - Continuation of Implementation 05/21/2019
J 198 Replant and Maintain Riparian Plantings within Project Areas Previously Constructed 05/30/2019
K 190 Beaver Relocation Program 09/30/2018
L 132 Submit Progress Report for the period September 2017 to August 2018 09/30/2018
M 185 Periodic Status Reports for BPA 09/30/2018