Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 81780: 1992-009-00 EXP YAKIMA PH II O&M - BOR
Project Number:
Title:
Yakima Phase II Fish Screens Operations and Maintenance (O&M) with Washington Department of Fish and Wildlife (WDFW)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
81780
Contract Title:
1992-009-00 EXP YAKIMA PH II O&M - BOR
Contract Continuation:
Previous: Next:
78528: 1992-009-00 EXP YAKIMA PH II O&M- BOR
  • 88796: 1992-009-00 EXP YAKIMA PH II O&M/ROZA - BOR
Contract Status:
Closed
Contract Description:
CCR Number:  45359
Add Funds: $4,581
Contract Title:  1992-009-00 -- Yakima Phase II O&M - BOR
Contract Performance Period:  4/1/19 through 9/30/21
New Work - WE S - O&M at Roza Trap Facility
Work will be preformed from 5/1/21 - 9/30/21

O&M at Roza Trap Facility - Yakima Field Office (YFO) Fish Passage and Screening crew will:

1) remove and replace oils in mechanical components requiring such i.e. air compressors, pumps, etc..  All other lubricated moving points shall be inspected and lubricated to insure proper operation.

2) inspect all mechanical components and structural components of the hopper hoist assembly for wear and operational ability.  Perform repairs and/or part replacement where needed.  Perform safety inspection.

3) inspect all mechanical components and structural components of the barrier hoist assembly for wear and operational ability.  Perform repairs and/or part replacement where needed.  Perform safety inspection.

4) inspect all mechanical components and structural components (other than hoists) for wear and operational ability.  Perform repairs and/or part replacement where needed.

5) secure facility from theft and vandalism and allow operators to work in a safe environment.  

6) YFO Power operations and maintenance crew will inspect the power distribution infrastructure that provides power to the Roza Adult Collection Facility once a year.

7) YFO locksmith will complete an annual maintenance on all locking mechanisms within the facility.  This shall consist of lubrication and checking for proper operation.  Should improper operation be found the lock shall be repaired or replaced.

8) Provide monthly operation inspections of the emergency lighting within the facility.  This ensures compliance with state and OSHA regulations.

9) Conduct any emergency related O&M as necessary to maintain the proper operations of the facility.

BPA Project Title: Yakima Phase II Fish Screens Operations and Maintenance (O&M)
BPA Project Number:  1992-009-00
Contract Number:  81780
CCR Number:  44781
Contract Title:  1992-009-00 -- Yakima Phase II O&M - BOR
Contract Performance Period:  4/1/19 through 9/30/21
This contract performance period is being extend for an additional year, October 1, 2020 - September 30, 2021.  The new work is captured in work elements L - R.

Technical Contact Name: Patrick Monk
Technical Contact Title: Yakima Field Office, Fish Biologist
Company/Agency Name:  Bureau of Reclamation
1917 Marsh Rd
Yakima, WA 98901
509-573-8105
pamonk@usbr.gov

Contracting Contact Name:  Becky Neuman
Contracting Contact Title:  Grants/Contracts Specialists
Company/Agency Name:  Bureau of Reclamation
1917 Marsh Rd
Yakima, WA  98901
509-573-8011
bneuman@usbr.gov

Financial Contact Name:  Eric Guzowski
Financial Contact Title:  Budget Officer
Company/Agency Name:  Bureau of Reclamation
1917 Marsh Rd
Yakima, WA  98901
509-573-8103
eguzowski@usbr.gov

In accordance with the Pacific Northwest Electric Power Planning and Conservation Act, Bonneville is funding the operation and maintenance of fish protection, mitigation and enhancement facilities in the Yakima River Basin.  Reclamation operates and maintain BPA funded facilities at BPA's expense.  

As of May 1, 2012 Yakima Fish Screen Phase II O&M, project # 199503300 continues under Project 1992-009-00.  In 1994, a Memorandum of Agreement (MOA) between Bonneville, Reclamation, and Washington State Department of Fish and Wildlife (WDFW) was drafted and agreed upon (BOR# 1425-4-MA-10-00840, WDFW# 241-950010).  This MOA, through the use of an Annual Work Plan (AWP), assigns specific duties to Reclamation for O&M of Phase II facilities and is funded by Bonneville through successive annual IGAs.

Proper operation and maintenance of Yakima phase II fish screening facilities was documented in a Pacific Northwest National Laboratory report by J.A. Vucelick, G.A. McMichael, and M.A. Chamness in 2003 entitled "Washington Phase II Fish Diversion Screen Evaluations in the Yakima River Basin, Annual Report 2003."

Reclamation responsible for all O&M duties :
1     Bachelor/Hatton                       Drum
2     Johncox                                   Drum
3     WIP Lower                               Drum
4     WIP Upper                               Drum
5     Toppenish Pump                      Drum


Reclamation responsible for electrical maintenance, record keeping, and assistance as needed:
6      Bull                                            Headgate
7      Bull/Wilson                                Drum    
8      Clark                                          Drum-PW
9      Congdon                                    Drum
10    Ellensburg Mill                           Fixed Panel
11    Fogarty                                      Drum-PW
12    Fruitvale                                    Fixed Panel
13    Gleed                                         Belt
14    Kelly-Lowry                                Drum
15    Lindsey                                      Drum
16    Naches-Cowiche                      Drum
17    Naches-Selah                           Fixed Panel
18    New Cascade                           Drum    
19    Old Union                                 Fixed Panel
20    Packwood                                 Fixed Panel
21    Powell/LaFortune                     Drum
22    Selah Moxee                            Plate
23    Snipes-Allen                            Drum
24    Taylor                                       Drum
25    Union Gap                               Fixed Panel
26    Younger                                   Fixed Panel-PW
    
Reclamation responsible for record keeping and assistance as needed:
27    Anderson                                 Portable Drum
28    Chapman Nelson                    Portable Drum
29    Emerick                                   Portable Drum
30    Lewis                                       Portable Drum
31    Mason-Hays                            Drum-PW
32    Stevens                                   Drum-PW
Account Type(s):
Expense
Contract Start Date:
04/01/2019
Contract End Date:
09/30/2021
Current Contract Value:
$299,826
Expenditures:
$299,826

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Iaa
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mark Briggs US Bureau of Reclamation (BOR) No Supervisor mbriggs@usbr.gov (509) 573-8160
Jamie Cleveland Bonneville Power Administration Yes COR jacleveland@bpa.gov (503) 230-3160
Daniel Didricksen Washington Department of Fish and Wildlife (WDFW) No Interested Party daniel.didricksen@dfw.wa.gov (509) 571-5559
Carol Fisher US Bureau of Reclamation (BOR) No Administrative Contact cfisher@usbr.gov (509) 573-8012
Enedina Galvez US Bureau of Reclamation (BOR) No Administrative Contact egalvez@usbr.gov (509) 575-5848x8032
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Eric Guzowski US Bureau of Reclamation (BOR) No Administrative Contact eguzowski@usbr.gov (509) 573-8103
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jennifer McKenna Bonneville Power Administration No CO Assistant jmmckenna@bpa.gov (503) 314-8915
Patrick Monk US Bureau of Reclamation (BOR) Yes Contract Manager pamonk@usbr.gov (509) 573-8105
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Chad Stuart US Bureau of Reclamation (BOR) No Supervisor cstuart@usbr.gov (509) 573-8101


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Clearance A: 165. Environmental Compliance Documents 09/30/2020 09/30/2020
Properly Functioning Fish Screens B: 186. Annual O&M 03/31/2020 03/31/2020
Properly Functioning Fish Screens C: 186. Routine O&M 03/31/2020 03/31/2020
R,O&M Written Report D: 122. R,O & M Examinations 03/31/2020 10/31/2019
Facilitate the Annual Work Plan Meeting and Prepare Minutes of the Meeting E: 122. Annual Work Plan Meeting 05/15/2020 04/29/2020
2018 - 2019 Annual Written Report G: 132. Annual Report 4/1/2018 through 3/31/2019 04/28/2020 04/28/2020
SOW/Budget/Funding Increase Information Supplied to BPA H: 119. Budget Management and Contractor Reimbursements 09/30/2020 09/30/2020
Properly Functioning Fish Screens I: 186. Annual O&M 09/30/2020 09/30/2020
Properly Functioning Fish Screens J: 186. Routine O&M 09/30/2020 09/30/2020
R,O&M Written Report K: 122. R,O & M Examinations 09/30/2020 09/30/2020
Environmental Clearance L: 165. Environmental Compliance Documents 03/31/2021 12/18/2020
Properly Functioning Fish Screens M: 186. Annual O&M 03/31/2021 03/31/2021
Properly Functioning Fish Screens N: 186. Routine O&M 09/30/2021 09/30/2021
R,O&M Written Report O: 122. R,O & M Examinations 09/30/2021 09/30/2021
Facilitate the Annual Work Plan Meeting and Prepare Minutes of the Meeting P: 122. Annual Work Plan Meeting 07/30/2021 02/24/2021
2019 - 2020 Annual Written Report Q: 132. Annual Report 4/1/19 through 9/30/20 07/30/2021 08/20/2021
SOW/Budget/Funding Increase Information Supplied to BPA R: 119. Budget Management and Contractor Reimbursements 09/30/2021 09/30/2021
O&M at Roza Trap Facility S: 186. O&M at Roza Trap Facility 09/30/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 7 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
Coho (O. kisutch) - Unspecified Population
  • 6 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
Sockeye (Oncorhynchus nerka) - All Populations
  • 6 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 6 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
Trout, Bull (S. confluentus) (Threatened)
  • 6 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
Trout, Rainbow (Oncorhynchus mykiss)
  • 6 instances of WE 186 Operate and Maintain Habitat/Passage/Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance Documents 04/01/2019
B 186 Annual O&M 01/21/2020
C 186 Routine O&M 01/21/2020
D 122 R,O & M Examinations 04/01/2019
E 122 Annual Work Plan Meeting 04/01/2019
F 185 Periodic Status Reports for BPA 04/01/2019
G 132 Annual Report 4/1/2018 through 3/31/2019 04/01/2019
H 119 Budget Management and Contractor Reimbursements 04/01/2019
I 186 Annual O&M 01/21/2020
J 186 Routine O&M 01/21/2020
K 122 R,O & M Examinations
L 165 Environmental Compliance Documents
M 186 Annual O&M 01/21/2020
N 186 Routine O&M 01/21/2020
O 122 R,O & M Examinations
P 122 Annual Work Plan Meeting
Q 132 Annual Report 4/1/19 through 9/30/20
R 119 Budget Management and Contractor Reimbursements
S 186 O&M at Roza Trap Facility 03/29/2021