Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 83222: 2010-001-00 CAP COIC ICICLE CREEK FLOW RESTORATION PROJECT
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
83222
Contract Title:
2010-001-00 CAP COIC ICICLE CREEK FLOW RESTORATION PROJECT
Contract Continuation:
Previous: Next:
76808: 2010-001-00 EXP COIC ICICLE CREEK FLOW RESTORATION PROJECT
Contract Status:
Closed
Contract Description:
Through this contract, the contractor, Washington Water Trust (WWT) will resume to ensure construction activities will occur in FFY20.  With the authorization from EWB, capital funding was rescheduled to FFY19 to implement this project.

Construction activities were delayed due to unexpected cultural resources findings on the preferred pump station site.  The results of the Section 106/ cultural resources survey demonstrated culturally significant/ sensitive areas in the primary pump station site  on the Wenatchee River immediately upstream from the Icicle Creek confluence and required analysis of a previously identified alternative pump station site near RM .75 on Icicle Creek.  This has required a new easement negotiation.  WWT has initiated contracting with outside funding of a yellow book appraisal for the purpose of negotiating an easement and final landowner agreement with both the irrigation company and the owner of the proposed pump station site.  The associated milestones will be rescheduled under contract CR - 335804.

WWT has continued to maintain contact with the Cascade Orchards Irrigation Company Technical Advisory Group and the BPA - pm/ COR on project development.

Permitting is ongoing, and will also be included as a deliverable under CR-335804. Anchor QEA is awaiting final survey data to finish the  60%, 90% designs and bid packages for each of the pump station, mainline, and lateral construction sub-components, and expects the new completion date to be October 2019 for the 60% design and  December 2019 for the 90% design and bid packages. These milestone schedules will be included in contract CR-335804.

The contractor Washington Water Trust (WWT), its designated agents, sub-consultants and project stakeholders will be available, responsive and collaboratively address contract related issues during the term of the contract. Contract issues include but are not limited to technical, policy, regulatory, project management and associated elements related to the project. Successful execution of this contract is contingent on alignment of the preceding contract issues with the BPI and BPA contracting processes, project management plans, design review protocols (including but not limited to BPA RRT design review, Technical and Design Team guidance, review, input, comments, integration, stakeholder congruence with proposed actions and decisions rendered by 1) the project executive team (BPA, UCSRB, WWT). Arbitration and dispute resolution will occur relative to the following two tier escalation ladder: 1) conference with the project Executive Team and 2) Direct consultation between program managers.
Account Type(s):
Capital
Contract Start Date:
09/21/2019
Contract End Date:
09/20/2020
Current Contract Value:
$4,150
Expenditures:
$4,150

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Susan Adams Washington Water Trust Yes Supervisor susan@washingtonwatertrust.org (206) 675-1585x101
Joseph Connor Bonneville Power Administration Yes COR jwconnor@bpa.gov (503) 230-3172
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Gregory McLaughlin Washington Water Trust Yes Contract Manager greg@washingtonwatertrust.org (509) 844-4146
Elham Zolmajd-Haghighi Bonneville Power Administration Yes Contracting Officer ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Coordinate with BPA on the Environmental Compliance Permitting Processes A: 165. Environmental Compliance Coordination w/BPA 09/20/2020 09/20/2020
MOA and Site Development Plan incorporating all mitigation actions. B: 165. Section 106 Consultation/ Cultural Resources - Environmental Compliance Coordination with BPA 09/20/2020 09/20/2020
Proficiently Manage Contract & Project C: 119. Project Management 09/20/2020 09/20/2020
Coordinate with local and regional stakeholders D: 191. Coordinate with Stakeholders in the Icicle Watershed and BPA 09/20/2020 09/20/2020
Project Design Compliance w/HIP3 E: 175. Coordinate w/BPA to Comply w/HIP3 09/20/2020
Checklist Developed G: 154. Update CBWTP Checklist 12/12/2019 02/29/2020
Track Progress Toward Water Protection H: 164. Track Progress for Water Protection 09/20/2020
Pipeline and Pump Station Design Compliance w/HIP3 I: 203. Perform Pre-implementation Tasks 09/20/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 203 Install Water Conservation Measure
  • 1 instance of WE 69 Install Fish Screen
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 1 instance of WE 164 Acquire Water Instream

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance Coordination w/BPA
B 165 Section 106 Consultation/ Cultural Resources - Environmental Compliance Coordination with BPA
C 119 Project Management
D 191 Coordinate with Stakeholders in the Icicle Watershed and BPA
E 175 Coordinate w/BPA to Comply w/HIP3
F 69 NMFS-Compliant Self Cleaning Fish Screen (submerged cone, air blast, or equivalent)
G 154 Update CBWTP Checklist
H 164 Track Progress for Water Protection
I 203 Perform Pre-implementation Tasks
J 203 Purchase Pipe
K 185 Periodic Status Reports for BPA
L 132 (no report is required per COR)