Province | Subbasin | % |
---|---|---|
Columbia Cascade | Entiat | 5.00% |
Methow | 35.00% | |
Okanogan | 25.00% | |
Wenatchee | 35.00% |
Previous: | Next: |
---|---|
84042 REL 9: 2010-034-00 EXP UPPER COLUMBIA SPRING CHINOOK |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All EC documents submitted for this contract | B: 165. Provide EC documentation to BPA | 06/30/2024 | 06/30/2024 | |
Effective implementation management and timely contract administration | C: 119. Manage and administer project | 06/30/2024 | 06/30/2024 | |
Produce accessible, error-checked datasets | D: 157. Upper Columbia spring Chinook Salmon stock assesment | 06/30/2024 | 06/30/2024 | |
Number of spring Chinook PIT tagged or recaptured determined | E: 158. PIT tag adult spring Chinook Salmon at Priest Rapids Dam | 06/30/2024 | 06/30/2024 | |
Produce accessible, error-checked datasets | F: 157. Operate and maintain PIT tag arrays in the Wenatchee River Basin | 06/30/2024 | 06/30/2024 | |
Produce accessible, error-checked datasets | G: 157. Operate and maintain PIT tag arrays in the Methow River Basin | 06/30/2024 | 06/30/2024 | |
Ensure continued operation of PIT arrays | H: 157. Design, Build, Install and Repair PIT tag arrays | 06/30/2024 | 06/30/2024 | |
PIT tag mark and recapture data | I: 159. Upload PIT tag data to PTAGIS database | 06/30/2024 | 06/30/2024 | |
Spring Chinook abundance estimates | J: 162. Estimate spring Chinook Salmon run escapement and prespawn mortality | 06/30/2024 | 06/30/2024 | |
Submission of smolt trap data and metadata | K: 157. Operate smolt trap to capture juvenile salmonids in the Entiat River | 06/30/2024 | 06/30/2024 | |
PIT tagged juvenile salmonids - data entered in PTAGIS | L: 158. PIT tagging juvenile Chinook Salmon at the Entiat Rotary Screw Trap | 06/30/2024 | 06/30/2024 | |
PIT tagged juvenile salmonids - data entered into PTAGIS | M: 158. PIT tagging juvenile steelhead at the Entiat Rotary Screw Trap | 06/30/2024 | 06/30/2024 | |
Produce accessible, error-checked datasets | N: 157. Collect tissue samples from juvenile Chinook captured at the Entiat River smolt trap | 06/30/2024 | 06/30/2024 | |
Analysis of monitoring data | O: 162. Analysis of rotary screw trap data | 06/30/2024 | 06/30/2024 | |
Completed annual technical report | P: 132. Submit Progress Report for CY 2023 | 03/31/2024 | 03/31/2024 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 165 | Provide EC documentation to BPA | |||||||
C | 119 | Manage and administer project | |||||||
D | 157 | Upper Columbia spring Chinook Salmon stock assesment | 07/01/2023 | ||||||
E | 158 | PIT tag adult spring Chinook Salmon at Priest Rapids Dam | 07/01/2023 | ||||||
F | 157 | Operate and maintain PIT tag arrays in the Wenatchee River Basin | 07/01/2023 | ||||||
G | 157 | Operate and maintain PIT tag arrays in the Methow River Basin | 07/01/2023 | ||||||
H | 157 | Design, Build, Install and Repair PIT tag arrays | 07/01/2023 | ||||||
I | 159 | Upload PIT tag data to PTAGIS database | |||||||
J | 162 | Estimate spring Chinook Salmon run escapement and prespawn mortality | |||||||
K | 157 | Operate smolt trap to capture juvenile salmonids in the Entiat River | 07/01/2023 | ||||||
L | 158 | PIT tagging juvenile Chinook Salmon at the Entiat Rotary Screw Trap | 07/01/2023 | ||||||
M | 158 | PIT tagging juvenile steelhead at the Entiat Rotary Screw Trap | 07/01/2023 | ||||||
N | 157 | Collect tissue samples from juvenile Chinook captured at the Entiat River smolt trap | 07/01/2023 | ||||||
O | 162 | Analysis of rotary screw trap data | |||||||
P | 132 | Submit Progress Report for CY 2023 |