Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84042 REL 43: 2010-034-00 EXP WDFW UC SP CHINOOK STEELHEAD M&E
Project Number:
Title:
Upper Columbia Spring Chinook and Steelhead Juvenile and Adult Abundance, Productivity and Spatial Structure Monitoring
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 5.00%
Methow 35.00%
Okanogan 25.00%
Wenatchee 35.00%
Contract Number:
84042 REL 43
Contract Title:
2010-034-00 EXP WDFW UC SP CHINOOK STEELHEAD M&E
Contract Continuation:
Previous: Next:
84042 REL 9: 2010-034-00 EXP UPPER COLUMBIA SPRING CHINOOK
  • 84042 REL 81: 2010-034-00 EXP WDFW UC SP CHINOOK STEELHEAD M&E
  • 84042 REL 74: 2018-002-00 EXP WDFW INTEGRATED IN-STREAM PIT DETECTION O&M
Contract Status:
Issued
Contract Description:
This project, managed by the Washington Department of Fish and Wildlife (WDFW), seeks to develop and implement a process that augments data from existing monitoring and evaluation (M&E) programs to identify factors limiting desired performance (e.g., productivity, abundance) and inform recovery actions directed at salmon and steelhead populations in the Upper Columbia River basin (UCR).

From 2010 – 2020, project work focused on estimating escapement for steelhead populations in the UCR. In 2020 and beyond, steelhead abundance estimation will be managed by Chelan, Douglas, and Grant County Public Utility Districts (PUDs). As the lead project proponent, WDFW has requested to focus on populations of spring Chinook Salmon within the UCR Evolutionary Significant Unit, listed as endangered under the Endangered Species Act. A significant knowledge gap exists regarding adult spring Chinook Salmon run escapement into major spawning areas (MaSA), and their subsequent survival during the summer holding period. There is also a critical gap in quantifying run escapement into the Wenatchee, Entiat, Methow, and Okanogan sub-basins.

Due to the imperiled status of spring Chinook Salmon in the UCR and the importance of this life stage for recovery (i.e., potential spawners), WDFW will collect spring Chinook Salmon data with the overarching goal of quantifying run escapement at multiple spatial scales in the UCR. Specific objectives include (1) accurately and precisely quantify run escapement and composition at the ESU, population, and MaSA scales, (2) develop estimates of pre-spawn mortality and survival for spring Chinook Salmon at population and MaSA spatial scales, (3) evaluate patterns of movement, distribution, and habitat utilization that may be associated with patterns in survival and mortality, and (4) develop a predictive model for pre-spawn mortality that can be used for conservation and incorporated into habitat restoration design and prioritization.

This contract covers WDFW’s management and oversight of the following field activities:
1.    PIT tagging and scale collection of adult spring Chinook Salmon at Priest Rapids Dam.
2.    Operation and maintenance of PIT tag arrays in the Wenatchee and Methow River basins (Colville Confederated Tribes maintains PIT
       arrays in the Okanogan under CR-363464, Biomark maintains PIT arrays installed under the past ISEMP contract, currently under 2018-
       002-00).
3.    Estimate escapement and prespawn mortality for spring Chinook Salmon.
4.    Operation of a juvenile smolt trap within the Entiat River to estimate spring Chinook and steelhead outmigrant abundance, PIT tag
       captured juveniles in support of ongoing survival studies (Comparative Survival Study), estimate Entiat River spring Chinook productivity
       and smolt-to-adult return rates.

The contract also provides for project management, administration, coordination, data analysis, and status and final reporting. The final report deliverable for 2010-034-00 is provided under this contract.
Account Type(s):
Expense
Contract Start Date:
07/01/2023
Contract End Date:
06/30/2024
Current Contract Value:
$850,114
Expenditures:
$850,114

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All EC documents submitted for this contract B: 165. Provide EC documentation to BPA 06/30/2024 06/30/2024
Effective implementation management and timely contract administration C: 119. Manage and administer project 06/30/2024 06/30/2024
Produce accessible, error-checked datasets D: 157. Upper Columbia spring Chinook Salmon stock assesment 06/30/2024 06/30/2024
Number of spring Chinook PIT tagged or recaptured determined E: 158. PIT tag adult spring Chinook Salmon at Priest Rapids Dam 06/30/2024 06/30/2024
Produce accessible, error-checked datasets F: 157. Operate and maintain PIT tag arrays in the Wenatchee River Basin 06/30/2024 06/30/2024
Produce accessible, error-checked datasets G: 157. Operate and maintain PIT tag arrays in the Methow River Basin 06/30/2024 06/30/2024
Ensure continued operation of PIT arrays H: 157. Design, Build, Install and Repair PIT tag arrays 06/30/2024 06/30/2024
PIT tag mark and recapture data I: 159. Upload PIT tag data to PTAGIS database 06/30/2024 06/30/2024
Spring Chinook abundance estimates J: 162. Estimate spring Chinook Salmon run escapement and prespawn mortality 06/30/2024 06/30/2024
Submission of smolt trap data and metadata K: 157. Operate smolt trap to capture juvenile salmonids in the Entiat River 06/30/2024 06/30/2024
PIT tagged juvenile salmonids - data entered in PTAGIS L: 158. PIT tagging juvenile Chinook Salmon at the Entiat Rotary Screw Trap 06/30/2024 06/30/2024
PIT tagged juvenile salmonids - data entered into PTAGIS M: 158. PIT tagging juvenile steelhead at the Entiat Rotary Screw Trap 06/30/2024 06/30/2024
Produce accessible, error-checked datasets N: 157. Collect tissue samples from juvenile Chinook captured at the Entiat River smolt trap 06/30/2024 06/30/2024
Analysis of monitoring data O: 162. Analysis of rotary screw trap data 06/30/2024 06/30/2024
Completed annual technical report P: 132. Submit Progress Report for CY 2023 03/31/2024 03/31/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 2 instances of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Provide EC documentation to BPA
C 119 Manage and administer project
D 157 Upper Columbia spring Chinook Salmon stock assesment 07/01/2023
E 158 PIT tag adult spring Chinook Salmon at Priest Rapids Dam 07/01/2023
F 157 Operate and maintain PIT tag arrays in the Wenatchee River Basin 07/01/2023
G 157 Operate and maintain PIT tag arrays in the Methow River Basin 07/01/2023
H 157 Design, Build, Install and Repair PIT tag arrays 07/01/2023
I 159 Upload PIT tag data to PTAGIS database
J 162 Estimate spring Chinook Salmon run escapement and prespawn mortality
K 157 Operate smolt trap to capture juvenile salmonids in the Entiat River 07/01/2023
L 158 PIT tagging juvenile Chinook Salmon at the Entiat Rotary Screw Trap 07/01/2023
M 158 PIT tagging juvenile steelhead at the Entiat Rotary Screw Trap 07/01/2023
N 157 Collect tissue samples from juvenile Chinook captured at the Entiat River smolt trap 07/01/2023
O 162 Analysis of rotary screw trap data
P 132 Submit Progress Report for CY 2023