Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84042 REL 58: 1997-004-00 EXP WDFW UPPER COLUMBIA RESIDENT FISH STOCK STATUS
Project Number:
Title:
Resident Fish above Chief Joseph and Grand Coulee Dams
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Columbia Upper 100.00%
Contract Number:
84042 REL 58
Contract Title:
1997-004-00 EXP WDFW UPPER COLUMBIA RESIDENT FISH STOCK STATUS
Contract Continuation:
Previous: Next:
84042 REL 27: 1997-004-00 EXP WDFW UPPER COLUMBIA RESIDENT FISH STOCK STATUS
  • CR-373551: 1997-004-02 EXP WDFW-RES FISH ABOVE CHIEF JOE & GRAND COULEE
Contract Status:
Issued
Contract Description:
Stock assessment of Redband Trout in Big Sheep and Onion Creeks in the upper Columbia River and an index area of the upper Spokane River. Stock assessment in upper Columbia River tributaries includes abundance and density estimates of Redband Trout from the confluence of the Columbia River to the barrier falls. Abundance estimates are conducted through mark recapture experiments. Recruitment and escapement is evaluated through spawner surveys and stationary PIT tag arrays. Biological data is collected to evaluate age and growth characteristics of the Redband Trout populations.

Redband Trout stock assessment in the upper Spokane River includes abundance estimates  and descriptive statistics to evaluate age and growth characteristics of the Redband population. Estimates will provide a baseline population abundance prior to Smallmouth Bass removal efforts. Abundance will be evaluated annually for four years throughout removal efforts to evaluate Redband Trout population response to predator removal.
Account Type(s):
Expense
Contract Start Date:
03/01/2024
Contract End Date:
02/28/2025
Current Contract Value:
$235,858
Expenditures:
$108,410

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jason Connor Kalispel Tribe Yes Interested Party jconnor@knrd.org (509) 447-7285
Brodie Cox Washington Department of Fish and Wildlife (WDFW) Yes Technical Contact coxpbc@dfw.wa.gov (360) 902-2776
Chris Donley Washington Department of Fish and Wildlife (WDFW) No Supervisor christopher.donley@dfw.wa.gov (509) 892-1001x307
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Michael Garrity Washington Department of Fish and Wildlife (WDFW) No Interested Party michael.garrity@dfw.wa.gov (360) 810-0877
Bonnie Greeninger Bonneville Power Administration Yes Contracting Officer begreeninger@bpa.gov (360) 601-5500
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Janice Jackson Washington Department of Fish and Wildlife (WDFW) Yes Administrative Contact janice.jackson@dfw.wa.gov (360) 902-2444
Charles Lee Washington Department of Fish and Wildlife (WDFW) Yes Contract Manager charles.lee@dfw.wa.gov (509) 892-1001
Gil Lensegrav Washington Department of Fish and Wildlife (WDFW) Yes Technical Contact lensegll@dfw.wa.gov (360) 902-2240
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Joe Maroney Kalispel Tribe No Interested Party jmaroney@knrd.org (509) 447-7272
Carlos Matthew Bonneville Power Administration Yes COR cjmatthew@bpa.gov (503) 230-3418
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Obtain Scientific Collector's Permit A: 165. Scientific Collectors Permit 03/01/2024 03/01/2024
Produce accessible, error-checked datasets B: 157. Conduct abundance estimate of Redband Trout in the Spokane River. 02/28/2025
Deliverable: An accessible, error-checked data set with metadata C: 162. Calculate abundance of Redband Trout in the Spokane River 02/28/2025
Produce accessible, error-checked datasets D: 157. Conduct fishery surveys at Onion Creek 02/28/2025
Deliverable: An accessible, error-checked data set with metadata E: 162. Analysis of fish surveys at Onion Creek 02/28/2025
Produce accessible, error-checked datasets F: 157. Conduct Redband Trout abundance surveys at Big Sheep Creek 02/28/2025
Deliverable: An accessible, error-checked data set with metadata G: 162. Analysis of Redband Trout abundance surveys at Big Sheep Creek 02/28/2025
Error Checked PIT tag data set H: 158. PIT tag Redband Trout (upper Columbia River tributaries). 02/28/2025
Error checked PIT dataset I: 158. PIT tag Redband Trout in the upper Spokane River 02/28/2025
Updated WDFW JSAP Data uploaded to publicly accessible GEDMS database. J: 159. Transfer certified data currently stored in MS Access database to the Geospatial Enabled Database. 02/28/2025
Updated MS Access database for WDFW JSAP data. K: 160. Update and maintain an MS Access-based database system for WDFW JSAP data. 02/28/2025
Coordination with Project co-sponsors L: 189. Project Coordination and annual meeting. 02/28/2025
Updated Study Plan and Methods - Published M: 156. Review and Revise Monitoring Resources Protocols 02/28/2025
Effective implementation management and timely contract administration N: 119. Manage and administer WDFW portion of project implementation. 02/28/2025
Completed Annual Report O: 132. Submit Progress Report for the period (Mar 2023) to (Feb 2024) 02/28/2025 07/12/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Interior Redband (O. mykiss gairdnerii)
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 3 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Scientific Collectors Permit
B 157 Conduct abundance estimate of Redband Trout in the Spokane River. 03/01/2024
C 162 Calculate abundance of Redband Trout in the Spokane River
D 157 Conduct fishery surveys at Onion Creek 03/01/2024
E 162 Analysis of fish surveys at Onion Creek
F 157 Conduct Redband Trout abundance surveys at Big Sheep Creek 03/01/2024
G 162 Analysis of Redband Trout abundance surveys at Big Sheep Creek
H 158 PIT tag Redband Trout (upper Columbia River tributaries). 03/01/2024
I 158 PIT tag Redband Trout in the upper Spokane River 03/01/2024
J 159 Transfer certified data currently stored in MS Access database to the Geospatial Enabled Database.
K 160 Update and maintain an MS Access-based database system for WDFW JSAP data.
L 189 Project Coordination and annual meeting.
M 156 Review and Revise Monitoring Resources Protocols 03/01/2024
N 119 Manage and administer WDFW portion of project implementation.
O 132 Submit Progress Report for the period (Mar 2023) to (Feb 2024)
P 185 Periodic Status Reports for BPA