Complete EC. |
A: 165. Produce Environmental Compliance Documentation |
|
02/28/2025 |
|
Produce accessible, error-checked datasets |
B: 157. Assist with Fall Walleye Index Netting on Lake Roosevelt |
|
02/28/2025 |
|
2023 FWIN data set prepared for analysis |
C: 159. Acquire 2023 Fall Walleye Indexing Netting (FWIN) data from Co-managers and format |
|
05/31/2024 |
05/31/2024 |
Produce accessible, error-checked datasets |
D: 157. Age Lake Roosevelt Burbot |
|
03/31/2024 |
03/29/2024 |
Deliverable: An accessible, error-checked data set with metadata |
E: 162. Analyze 2023 FWIN Burbot data |
|
02/28/2025 |
|
Produce accessible, error-checked datasets |
F: 157. Identify Burbot reservoir spawning locations |
|
02/28/2025 |
|
Produce accessible, error-checked datasets |
G: 157. Pelagic Burbot larvae sampling |
|
02/28/2025 |
|
Produce accessible, error-checked datasets |
H: 157. Conduct hydrographic survey in Lake Roosevelt to map benthic habitat |
|
02/28/2025 |
|
Deliverable: An accessible, error-checked data set with metadata |
I: 162. Analyze hydrographic survey data to develop sediment facies map of Lake Roosevelt |
|
02/28/2025 |
|
Produce accessible, error-checked datasets |
J: 157. Evaluate gears for capturing juvenile Burbot |
|
11/30/2024 |
|
Deliverable: An accessible, error-checked data set with metadata |
K: 162. Analysis - evaluate gears for capturing juvenile Burbot |
|
02/28/2025 |
|
Produce accessible, error-checked datasets |
L: 157. Process archived vertical plankton nets tow samples from 2023 |
|
05/31/2024 |
05/31/2024 |
Produce accessible, error-checked datasets |
M: 157. Evaluate Burbot spawning activity in the Sanpoil River |
|
02/28/2025 |
|
Effective implementation management and timely contract administration |
N: 119. Manage & Administer the Lake Roosevelt Burbot Population Assessment Project |
|
02/28/2025 |
|
Completed Annual Report |
O: 132. Submit Progress Report for the period (Jan 2022) to (Dec 2022) |
|
07/31/2024 |
07/31/2024 |
Completed Annual Report |
P: 132. Draft and Submit Progress Report for the period (Jan 2023) to (Dec 2023) |
|
02/28/2025 |
|
Completed Annual Report |
Q: 132. Draft Progress Report for the period (Jan 2024) to (Dec 2024) |
|
02/28/2025 |
|