Province | Subbasin | % |
---|---|---|
Intermountain | Columbia Upper | 100.00% |
Previous: | Next: |
---|---|
73548 REL 137: 2008-115-00 EXP LAKE ROOSEVELT BURBOT POPULATION ASSESSMENT |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Charlee Capaul | Colville Confederated Tribes | Yes | Technical Contact | charlee.capaul@colvilletribes.com | (509) 634-6206 |
Jay Chong | Bonneville Power Administration | Yes | Contracting Officer | jxchong@bpa.gov | (503) 230-4007 |
Edward Gresh | Bonneville Power Administration | Yes | Env. Compliance Lead | esgresh@bpa.gov | (503) 230-5756 |
Billy Gunn | Colville Confederated Tribes | Yes | Administrative Contact | billy.gunn@colvilletribes.com | (509) 422-7740 |
Heidi Haak | Bonneville Power Administration | No | Interested Party | hlhaak@bpa.gov | (541) 922-6856 |
Peter Lofy | Bonneville Power Administration | Yes | F&W Approver | ptlofy@bpa.gov | (503) 230-4193 |
Carlos Matthew | Bonneville Power Administration | Yes | COR | cjmatthew@bpa.gov | (503) 230-3418 |
Jason McLellan | Colville Confederated Tribes | Yes | Contract Manager | jason.mclellan@colvilletribes.com | (509) 209-2418 |
Bret Nine | Colville Confederated Tribes | No | Supervisor | bret.nine@colvilletribes.com | (509) 209-2419 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance completed | A: 165. Produce Environmental Compliance Documentation | 02/28/2024 | 02/29/2024 | |
Produce accessible, error-checked datasets | B: 157. Assist with Fall Walleye Index Netting on Lake Roosevelt | 02/28/2024 | 02/29/2024 | |
2022 FWIN data set formatted for analysis | C: 159. Acquire 2022 Fall Walleye Indexing Netting (FWIN) data from Co-managers and format | 05/31/2023 | 05/31/2023 | |
Produce accessible, error-checked datasets | D: 157. Age Lake Roosevelt Burbot | 03/31/2023 | 05/31/2023 | |
Deliverable: An accessible, error-checked data set with metadata | E: 162. Analyze 2022 FWIN Burbot data | 02/28/2024 | 02/29/2024 | |
Produce accessible, error-checked datasets | F: 157. Identify Burbot reservoir spawning locations | 02/28/2024 | 02/29/2024 | |
Produce accessible, error-checked datasets | G: 157. Pelagic Burbot larvae sampling | 02/28/2024 | 02/29/2024 | |
Produce accessible, error-checked datasets | H: 157. Conduct hydrographic survey in Lake Roosevelt to map benthic habitat | 02/28/2024 | 02/29/2024 | |
Deliverable: An accessible, error-checked data set with metadata | I: 162. Analyze hydrographic survey data to develop sediment facies map of Lake Roosevelt | 02/28/2024 | 02/29/2024 | |
Burbot ovary samples for fecundity estimation | J: 157. Capture reproductive female Burbot to estimate fecundity | 02/28/2024 | 02/29/2024 | |
Juvenile Burbot catch and biological data | K: 157. Evaluate gears for capturing juvenile Burbot | 11/30/2023 | 11/30/2023 | |
Deliverable: An accessible, error-checked data set with metadata | L: 162. Analysis - evaluate gears for capturing juvenile Burbot | 02/28/2024 | 02/29/2024 | |
Effective implementation management and timely contract administration | M: 119. Manage & Administer the Lake Roosevelt Burbot Population Assessment Project | 02/28/2024 | 02/29/2024 | |
Completed Annual Report | N: 132. Submit Progress Report for the period (Jan 2022) to (Dec 2022) | 02/29/2024 | ||
Produce accessible, error-checked datasets | Q: 157. Process archived vertical plankton nets tow samples | 02/29/2024 | 02/29/2024 |
Primary Focal Species | Work Statement Elements |
---|---|
Burbot (Lota lota) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Produce Environmental Compliance Documentation | |||||||
B | 157 | Assist with Fall Walleye Index Netting on Lake Roosevelt | 12/20/2022 | ||||||
C | 159 | Acquire 2022 Fall Walleye Indexing Netting (FWIN) data from Co-managers and format | |||||||
D | 157 | Age Lake Roosevelt Burbot | 12/20/2022 | ||||||
E | 162 | Analyze 2022 FWIN Burbot data | |||||||
F | 157 | Identify Burbot reservoir spawning locations | 12/20/2022 | ||||||
G | 157 | Pelagic Burbot larvae sampling | 12/20/2022 | ||||||
H | 157 | Conduct hydrographic survey in Lake Roosevelt to map benthic habitat | 12/20/2022 | ||||||
I | 162 | Analyze hydrographic survey data to develop sediment facies map of Lake Roosevelt | |||||||
J | 157 | Capture reproductive female Burbot to estimate fecundity | 12/20/2022 | ||||||
K | 157 | Evaluate gears for capturing juvenile Burbot | 12/20/2022 | ||||||
L | 162 | Analysis - evaluate gears for capturing juvenile Burbot | |||||||
M | 119 | Manage & Administer the Lake Roosevelt Burbot Population Assessment Project | |||||||
N | 132 | Submit Progress Report for the period (Jan 2022) to (Dec 2022) | |||||||
O | 132 | Draft Progress Report for the period (Jan 2023) to (Dec 2023) | |||||||
P | 185 | Periodic Status Reports for BPA | |||||||
Q | 157 | Process archived vertical plankton nets tow samples | 09/11/2023 |