Province | Subbasin | % |
---|---|---|
Intermountain | Sanpoil | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Jeannette Finley | Colville Confederated Tribes | No | Interested Party | Jeannette.finley@Colvilletribes.com | (509) 634-2124 |
Edward Gresh | Bonneville Power Administration | Yes | Env. Compliance Lead | esgresh@bpa.gov | (503) 230-5756 |
Bryan Jones | Colville Confederated Tribes | Yes | Contract Manager | bryan.jones@colvilletribes.com | (509) 422-4771 |
William Kozsey Jr | Bonneville Power Administration | Yes | Contracting Officer | WPKozsey@bpa.gov | (503) 230-3280 |
Peter Lofy | Bonneville Power Administration | Yes | F&W Approver | ptlofy@bpa.gov | (503) 230-4193 |
Carlos Matthew | Bonneville Power Administration | Yes | COR | cjmatthew@bpa.gov | (503) 230-3418 |
Dennis Moore | Colville Confederated Tribes | Yes | Technical Contact | dennis.moore.fnw@colvilletribes.com | (509) 634-2137 |
Bret Nine | Colville Confederated Tribes | Yes | Supervisor | bret.nine@colvilletribes.com | (509) 209-2419 |
Jessica Power | Bonneville Power Administration | No | CO Assistant | jdpower@bpa.gov | (503) 230-4023 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance | A: 165. Complete Environmental Compliance | 01/31/2025 | ||
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish | B: 114. Identify and Select Projects for the Upper Columbia and Sanpoil Habitat Restoration Plan (WE-B in FY23) | 01/31/2025 | ||
Provide Technical Review and Recommendations | C: 122. Interdisciplinary Project Planning Participation - Technical Review (WE-C in FY23) | 01/31/2025 | ||
Maintain Riparian Fencing | D: 186. Maintain Existing Riparian Fence (WE-D in FY23) | 01/31/2025 | ||
Riparian Protection Exclosures Monitored | E: 26. Monitor Exclosures (WE-E in FY23) | 01/31/2025 | ||
Design Plan Set for Sanpoil River (Sanpoil 4B) Large Wood Addition | F: 175. Design Specifications & Engineering: Middle Sanpoil River (Sanpoil-4B)- Large Wood Placement (WE-H in FY23) | 01/31/2025 | ||
Design Plan Set for Sanpoil River (Sanpoil 4A) Large Wood Addition | G: 175. Design Specifications & Engineering: Middle Sanpoil River (Sanpoil-4A)- Large Wood Placement (WE-J in FY22) | 01/31/2025 | ||
Cultural surveys to BPA | H: 165. Cultural Resource Surveys | 01/31/2025 | ||
Design Specifications and Site Plan | I: 175. Moses Creek Site #2 BDA Design - WE-K in FY23 | 01/31/2025 | ||
Improved Habitat Function, Complexity and Structure: Installed BDAs Functioning as Designed in Moses Creek #2 Site | J: 29. Moses Creek Site #2 BDA Installation - WE-L in FY23 | 01/31/2025 | ||
Completed Designs for Fish Passage on Gold Creek | K: 175. Replacement of Forest Road Crossing over Lower Gold Creek - WE-O in FY23 | 01/31/2025 | ||
Completed Designs for Fish Passage on Lost Creek | L: 175. Replacement of Forest Road Crossing over Lost Creek - WE-P in FY23 | 01/31/2025 | ||
LiDAR Data Collection | M: 115. Topobathymetric LiDAR Acquisition – Sanpoil River | 01/31/2025 | ||
Produce accessible, error-checked datasets | N: 157. Monitor stream discharge in Sanpoil River | 01/31/2025 | ||
Completed Annual Report | P: 132. Submit Progress Report for the Period (Jan 2023) to (Dec 2023) | 01/10/2025 | ||
Effective implementation management and timely contract administration | Q: 119. Manage & Administer the Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project | 01/31/2025 |
Primary Focal Species | Work Statement Elements |
---|---|
Trout, Interior Redband (O. mykiss gairdnerii) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Complete Environmental Compliance | |||||||
B | 114 | Identify and Select Projects for the Upper Columbia and Sanpoil Habitat Restoration Plan (WE-B in FY23) | |||||||
C | 122 | Interdisciplinary Project Planning Participation - Technical Review (WE-C in FY23) | |||||||
D | 186 | Maintain Existing Riparian Fence (WE-D in FY23) | |||||||
E | 26 | Monitor Exclosures (WE-E in FY23) | |||||||
F | 175 | Design Specifications & Engineering: Middle Sanpoil River (Sanpoil-4B)- Large Wood Placement (WE-H in FY23) | |||||||
G | 175 | Design Specifications & Engineering: Middle Sanpoil River (Sanpoil-4A)- Large Wood Placement (WE-J in FY22) | |||||||
H | 165 | Cultural Resource Surveys | |||||||
I | 175 | Moses Creek Site #2 BDA Design - WE-K in FY23 | |||||||
J | 29 | Moses Creek Site #2 BDA Installation - WE-L in FY23 | |||||||
K | 175 | Replacement of Forest Road Crossing over Lower Gold Creek - WE-O in FY23 | |||||||
L | 175 | Replacement of Forest Road Crossing over Lost Creek - WE-P in FY23 | |||||||
M | 115 | Topobathymetric LiDAR Acquisition – Sanpoil River | |||||||
N | 157 | Monitor stream discharge in Sanpoil River | |||||||
O | 185 | Periodic Status Reports for BPA | |||||||
P | 132 | Submit Progress Report for the Period (Jan 2023) to (Dec 2023) | |||||||
Q | 119 | Manage & Administer the Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project |