Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 91814: 1990-018-00 EXP RAINBOW TROUT HABITAT/PASSAGE IMPROVEMENT
Project Number:
Title:
Lake Roosevelt Rainbow Trout Habitat and Passage Improvement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Sanpoil 100.00%
Contract Number:
91814
Contract Title:
1990-018-00 EXP RAINBOW TROUT HABITAT/PASSAGE IMPROVEMENT
Contract Continuation:
Previous: Next:
73548 REL 134: 1990-018-00 EXP RAINBOW TROUT HABITAT/PASSAGE IMPROVEMENT
  • 84051 REL 12: 1990-018-00 EXP RAINBOW TROUT HABITAT/PASSAGE IMPROVEMENT
Contract Status:
Closed
Contract Description:
The Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project is a resident fish substitution project intended to mitigate for anadromous fish losses caused by the construction and operations of Chief Joseph and Grand Coulee Dams.  The goal is to restore healthy and harvestable salmonid populations through rehabilitation of stream habitat and restoration of ecological function in the riparian corridors of streams within the boundaries of the Colville Confederated Tribes Reservation and Traditional Territories.

The Project proposes to enhance natural production and survival of resident fish for recreation and Tribal subsistence with the implementation of several management actions designed to address habitat related limiting factors and restore the natural hydrologic function of the systems.  In 2011, the project adopted an updated habitat improvement and protection strategy that focused on process-based restoration of natural stream function and a clearly-defined, hierarchical prioritization and implementation strategy to guide improvement actions.

The results of EDT modelling and restoration plan development identified 25 priority reaches to focus our efforts in and concluded that the most common restoration measures suggested for these priority reaches were: additions of large wood to the channel, riparian restoration, livestock exclusion, floodplain reconnections, remeandering straightened channels, wetland restoration, barrier removal, and protection.

The habitat restoration actions will improve the quality and quantity of stream habitat for native fishes.  These actions are designed to increase the abundance of native fish, primarily Redband Trout, to support ecosystem health and harvest opportunities.

We will begin working toward implementation of actions identified in the plan, as well as complete and maintain restoration identified in previous years.  

Work under this contract cycle will include:
•    Maintenance of approximately 16.19 miles of existing riparian fence
•    Monitor exclosures
•    Maintain BDAs at two sites; Lost-Loony creeks and Moses Creek #1
•    Maintain riparian plantings at two sites; Lost-Loony creeks and Moses Creek #1
•    Design and implement BDAs at three sites; Moses Creek #2, Twentythree Mile Creek, and Lost Creek #1
•    Design LWD placement at two sites for implementation in FY24; Sanpoil-4B and Sanpoil-4A
•    Design fish passage structures at two sites for implementation in FY24; Lower Gold Creek and Lost Creek
Account Type(s):
Expense
Contract Start Date:
02/01/2023
Contract End Date:
01/31/2024
Current Contract Value:
$558,627
Expenditures:
$558,627

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance A: 165. Complete Environmental Compliance 01/31/2024 01/31/2024
Develop or Update (out-year) Prioritized Habitat Project List: Upload to CBFish B: 114. Identify and Select Projects for the Upper Columbia and Sanpoil Habitat Restoration Plan (WE-B in FY22) 01/31/2024 01/31/2024
Provide Technical Review and Recommendation C: 122. Interdisciplinary Project Planning Participation - Technical Review (WE-C in FY22) 01/31/2024 01/31/2024
Functioning Riparian Fencing D: 186. Maintain Existing Riparian Fence (WE-D in FY22) 01/31/2024 01/31/2024
Sanpoil and Upper Columbia subbasins Riparian Protection Exclosures Monitored E: 26. Monitor Exclosures (WE-E in FY22) 01/31/2024 01/31/2024
Functioning Instream Structures (BDAs PALS) F: 186. Lost-Loony Creek BDA Maintenance (WE-F in FY22) 01/31/2024 01/31/2024
Functioning Instream Structures (BDAs and PALS) G: 186. Moses Creek BDA Maintenance (WE-H in FY22) 01/31/2024 01/31/2024
Design Plan Set for Sanpoil River (Sanpoil 4B) Large Wood Addition H: 175. Design Specifications & Engineering: Middle Sanpoil River (Sanpoil-4B)- Large Wood Placement (WE-I in FY22) 01/31/2024
Design Plan Set for Sanpoil River (Sanpoil-4A) Large Wood Addition I: 175. Design Specifications & Engineering: Middle Sanpoil River (Sanpoil-4A)- Large Wood Placement (WE-J in FY22) 01/31/2024
Riparian Vegetation Maintained at Moses Creek J: 198. Maintain Riparian Plantings at Moses Creek - (WE-L in FY22) 01/31/2024 01/31/2024
Design Specifications and Site Plan K: 175. Moses Creek Site #2 BDA Design - WE-M in FY22 01/31/2024
Improved Habitat Function, Complexity and Structure: Installed BDAs Functioning as Designed in Moses Creek #2 Site L: 29. Moses Creek Site #2 BDA Installation - WE-N in FY22 01/31/2024
Design Specifications and Site Plan M: 175. Twentythree Mile Creek BDA Design - WE-O in FY22 01/31/2024
Improved Habitat Function, Complexity and Structure: Installed BDAs Functioning as Designed in Twentythree Mile Creek N: 29. Twentythree Mile Creek BDA Installation - WE-P in FY22 01/31/2024
Completed Designs for Fish Passage on Gold Creek O: 175. Replacement of Forest Road Crossing over Lower Gold Creek - WE-Q in FY22 01/31/2024
Completed Designs for Fish Passage on Lost Creek P: 175. Replacement of Forest Road Crossing over Lost Creek - WE-R in FY22 01/31/2024
Design Specifications and Site Plan Q: 175. Lost Creek Site #1 BDA Design - New 01/31/2024
Improved Habitat Function, Complexity and Structure: Installed BDAs/PALS Functioning as Designed in Lost Creek #1. R: 29. Lost Creek #1 BDA Installation - New 01/31/2024
Completed Annual Report T: 132. Submit Progress Report for the Period (Jan 2022) to (Dec 2022) 07/31/2023 07/20/2023
Effective Implementation Management and Timely Contract Administration U: 119. Manage & Administer the Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project 01/31/2024 01/31/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
  • 7 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete Environmental Compliance
B 114 Identify and Select Projects for the Upper Columbia and Sanpoil Habitat Restoration Plan (WE-B in FY22)
C 122 Interdisciplinary Project Planning Participation - Technical Review (WE-C in FY22)
D 186 Maintain Existing Riparian Fence (WE-D in FY22)
E 26 Monitor Exclosures (WE-E in FY22)
F 186 Lost-Loony Creek BDA Maintenance (WE-F in FY22)
G 186 Moses Creek BDA Maintenance (WE-H in FY22)
H 175 Design Specifications & Engineering: Middle Sanpoil River (Sanpoil-4B)- Large Wood Placement (WE-I in FY22)
I 175 Design Specifications & Engineering: Middle Sanpoil River (Sanpoil-4A)- Large Wood Placement (WE-J in FY22)
J 198 Maintain Riparian Plantings at Moses Creek - (WE-L in FY22)
K 175 Moses Creek Site #2 BDA Design - WE-M in FY22
L 29 Moses Creek Site #2 BDA Installation - WE-N in FY22
M 175 Twentythree Mile Creek BDA Design - WE-O in FY22
N 29 Twentythree Mile Creek BDA Installation - WE-P in FY22
O 175 Replacement of Forest Road Crossing over Lower Gold Creek - WE-Q in FY22
P 175 Replacement of Forest Road Crossing over Lost Creek - WE-R in FY22
Q 175 Lost Creek Site #1 BDA Design - New
R 29 Lost Creek #1 BDA Installation - New
S 185 Periodic Status Reports for BPA
T 132 Submit Progress Report for the Period (Jan 2022) to (Dec 2022)
U 119 Manage & Administer the Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project