Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84068 REL 3: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Project Number:
Title:
Yankee Fork Salmon River Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
84068 REL 3
Contract Title:
2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Contract Continuation:
Previous: Next:
77111 REL 45: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
  • 84068 REL 12: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Contract Status:
Closed
Contract Description:
The Yankee Fork River, historically a major Chinook salmon producer, has been severely altered by dredge-mining that occurred between 1938 and 1952, eliminating much of the natural meander pattern of the stream and associated in-stream habitat, riparian vegetation, and function. The restoration and monitoring work contracted under project 2002-059-00 is implemented with the goal of restoring natural river channel characteristics, floodplain function, hydraulic and sediment regimes, and aquatic habitat within the dredged reach of the Yankee Fork Salmon River (YFSR). The Yankee Fork Restoration Project has focused on restoring an approximately six mile section of stream habitat on private land in the Yankee Fork basin by removing or redistributing dredge tailings piles to restore or improve the connectivity of aquatic and floodplain habitat; by the addition of large woody debris, boulders, substrate, and riparian plantings to improve the complexity of aquatic and riparian habitat; and by creating or rehabilitating existing side channels.  Restoration work has been completed with goals of increasing the amount of aquatic habitat available and suitable for fish at all life stages, while at the same time reducing velocities to encourage sediment deposition for the continued improvement and maintenance of channel morphological complexity and floodplain soil conditions.  

The Yankee Fork Restoration Project has been collecting data since 2006, including juvenile abundance and distribution (via snorkel surveys) at restoration sites and unrestored sites in the basin. In 2020 topographic habitat surveys were conducted to monitor changes in habitat at the Bonanza site. These data can be compared to data at a later date to assist in determining any significant changes with large wood mobilization, depth of pools and number of pools, sediment deposition/aggregation, and changes to other habitat features.  Staff will collaborate with other Yankee Fork ID team members (e.g., Trout Unlimited, Bureau of Reclamation) to assess fish presence, habitat use, and movement (e.g., passage success at the Bonanza project site), as well as assessing stream flows and groundwater dynamics through the Bonanza reach.  Data collected for these surveys will include discharge measurements and photo points. The project will also enter data collected from past years into a database and the Yankee Fork ArcGIS platform.

The Bonanza City project is at the upstream end of the dredged area, near Jordan Creek. The final phase of instream habitat construction at this site was completed in 2020. Post-construction monitoring and adaptive management has been necessary each year since completion in order to address low flow conditions and potentially compromised fish passage in the project area. Staff from this project will collaborate with project managers from the Trout Unlimited contract (also contracted under 2002-029-00) to identify adaptive management opportunities at the Bonanza project site.

We will continue to work with the Yankee Fork Interdisciplinary (ID) Team in 2023-24. The team will conduct out-year planning and produce a prioritized list of projects for implementation through at least 2027. Contract staff have been working collaboratively with the Yankee Fork ID team to develop an Atlas planning and prioritization framework that incorporates fish and habitat data in the basin. This effort builds on past geomorphic assessments and basin planning documents (e.g., Yankee Fork Tributary Assessment [2010] and the 5-year strategy plan developed under a previous contract [Yankee Fork Habitat Restoration Plan, Yankee Fork Salmon River, Idaho, December 2019]) to help define the future direction of fish and habitat restoration in the Yankee Fork basin.
Account Type(s):
Expense
Contract Start Date:
03/01/2023
Contract End Date:
02/29/2024
Current Contract Value:
$173,055
Expenditures:
$207,002

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes Yes Supervisor chad.colter@sbtribes.com (208) 239-4553
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Kira Finkler Trout Unlimited (TU) No Interested Party kfinkler@tu.org (208) 345-9800
Jim Gregory Trout Unlimited (TU) Yes Interested Party gregory_jim@yahoo.com (208) 390-5306
David Kaplowe Bonneville Power Administration Yes Supervisor djkaplowe@bpa.gov (503) 230-5365
Elsha Leavitt Shoshone-Bannock Tribes No Interested Party eleavitt@sbtribes.com (208) 478-3795
Eric Leitzinger Bonneville Power Administration Yes F&W Approver ejleitzinger@bpa.gov (503) 230-3534
Verl Miller Bonneville Power Administration Yes Backup COR VCMiller@bpa.gov (503) 230-3468
Hunter Osborne Shoshone-Bannock Tribes Yes Interested Party Hunter.Osborne@sbtribes.com (208) 239-4564
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Ryan Ruggiero Bonneville Power Administration Yes COR RCRuggiero@bpa.gov (503) 230-3789
Joseph Snapp Shoshone-Bannock Tribes Yes Contract Manager joe.snapp@sbtribes.com (208) 241-3715
Daniel Stone Shoshone-Bannock Tribes Yes Technical Contact dstone@sbtribes.com (208) 239-4555
Jacee Weed Shoshone-Bannock Tribes Yes Administrative Contact jacee.weed@sbtribes.com (208) 239-4551
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Caselle Wood Trout Unlimited (TU) Yes Interested Party caselle.wood@tu.org (208) 390-2028


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Routine administration of contract 02/29/2024 02/26/2024
Deliverable: Environmental Compliance Complete C: 165. Participate in the Environmental Compliance process 02/29/2024 02/26/2024
Completed Annual Report D: 132. Submit Progress Report for the period March 2023 to February 2024 to be completed in 2024 02/29/2024 02/26/2024
Watershed Coordination E: 191. Yankee Fork Interdisciplinary team and design meetings 02/29/2024 02/26/2024
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish F: 114. Refine project implementation schedule 02/29/2024 02/26/2024
Documentation G: 99. Attend public outreach events 02/29/2024 02/26/2024
Yankee Fork Data Management H: 159. Consolidate Yankee Fork geomorphic and biological data and upload into centralized database 02/29/2024 02/26/2024
Conduct snorkel surveys to document juvenile fish habitat use and age class I: 157. Juvenile salmonid surveys on the YFSR 02/29/2024 02/26/2024
Deliverable: An accessible, error-checked data set with metadata J: 162. Analyze juvenile salmonid/snorkel data 02/29/2024 02/26/2024
External data sharing K: 161. Disseminate juvenile salmonid survey data 02/29/2024 02/26/2024
Bonanza City Project Site Monitoring L: 186. Bonanza City project site adaptive management 02/29/2024 02/26/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Routine administration of contract
C 165 Participate in the Environmental Compliance process
D 132 Submit Progress Report for the period March 2023 to February 2024 to be completed in 2024
E 191 Yankee Fork Interdisciplinary team and design meetings
F 114 Refine project implementation schedule
G 99 Attend public outreach events
H 159 Consolidate Yankee Fork geomorphic and biological data and upload into centralized database
I 157 Juvenile salmonid surveys on the YFSR 03/01/2023
J 162 Analyze juvenile salmonid/snorkel data
K 161 Disseminate juvenile salmonid survey data
L 186 Bonanza City project site adaptive management 03/01/2023