Province | Subbasin | % |
---|---|---|
Intermountain | Pend Oreille | 100.00% |
Previous: | Next: |
---|---|
84069 REL 30: 2007-246-00 EXP RESTORATION OF BULL TROUT PASS |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance Measures Completed as Needed | B: 165. Obtain necessary permits | 04/30/2025 | ||
Produce accessible, error-checked datasets | C: 157. Electrofishing to collect bull trout below Albeni Falls Dam | 04/30/2025 | ||
Implant PIT tags into Bull Trout | D: 158. Implant PIT tags into bull trout for detection on PIT tag arrays upstream of Albeni Falls Dam | 04/30/2025 | ||
Trap and Haul - Transport bull trout above Albeni Falls Dam | E: 28. Transport bull trout above Albeni Falls Dam | 04/30/2025 | ||
Produce accessible, error-checked datasets | F: 157. Genetic analysis of bull trout biopsy samples | 04/30/2025 | ||
Produce accessible, error-checked datasets | G: 157. Determine the proportion of migratory Westslope Cutthroat Trout produced in the lower Priest River and evaluate biotic and abiotic factors that may influence the production of these fish. | 04/30/2025 | ||
Produce accessible, error-checked datasets | H: 157. Determine genetic structure, hybridization, and natal stream origin of Westslope Cutthroat Trout | 04/30/2025 | ||
Produce accessible, error-checked datasets | I: 157. Compile electronic spreadsheet database of electrofishing data | 04/30/2025 | ||
Deliverable: An accessible, error-checked data set with metadata | J: 162. Data reduction and analysis | 04/30/2025 | ||
Completed Annual Report | K: 132. Submit Annual Report for the period (5/1/2023) to (4/30/2024) | 04/30/2025 | ||
Deliverable: D. Deliverable: C. Coordination - Columbia Basin wide - Project coordination among all stakeholders | L: 189. Project coordination | 04/30/2025 | ||
Effective implementation management and timely contract administration | M: 119. Manage Project | 04/30/2025 |
Primary Focal Species | Work Statement Elements |
---|---|
Cutthroat Trout, Westslope (O. c. lewisi) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 165 | Obtain necessary permits | |||||||
C | 157 | Electrofishing to collect bull trout below Albeni Falls Dam | 06/21/2024 | ||||||
D | 158 | Implant PIT tags into bull trout for detection on PIT tag arrays upstream of Albeni Falls Dam | 06/21/2024 | ||||||
E | 28 | Transport bull trout above Albeni Falls Dam | 06/21/2024 | ||||||
F | 157 | Genetic analysis of bull trout biopsy samples | 06/21/2024 | ||||||
G | 157 | Determine the proportion of migratory Westslope Cutthroat Trout produced in the lower Priest River and evaluate biotic and abiotic factors that may influence the production of these fish. | 06/21/2024 | ||||||
H | 157 | Determine genetic structure, hybridization, and natal stream origin of Westslope Cutthroat Trout | 06/21/2024 | ||||||
I | 157 | Compile electronic spreadsheet database of electrofishing data | 06/21/2024 | ||||||
J | 162 | Data reduction and analysis | |||||||
K | 132 | Submit Annual Report for the period (5/1/2023) to (4/30/2024) | |||||||
L | 189 | Project coordination | |||||||
M | 119 | Manage Project |