Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental compliance requirements complete | A: 165. Obtain Required Permits, Authorizations, and Documentation as necessary for the Lower Methow Habitat Feasibility Project | 08/31/2021 | 08/31/2021 | |
Effective implementation management and timely contract administration | B: 119. Manage BPA Contracting Requirements | 08/31/2021 | 08/31/2021 | |
Lower Methow coordination with stakeholders, interested public, and cooperating entities | C: 191. Watershed Stakeholder Coordination and Outreach | 08/31/2021 | 08/31/2021 | |
Develop list of conceptual designs for up to five prioritized projects: upload to Pisces | D: 114. Identify and Select Projects for Conceptual Design | 08/31/2021 | 08/31/2021 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Obtain Required Permits, Authorizations, and Documentation as necessary for the Lower Methow Habitat Feasibility Project | |||||||
B | 119 | Manage BPA Contracting Requirements | |||||||
C | 191 | Watershed Stakeholder Coordination and Outreach | |||||||
D | 114 | Identify and Select Projects for Conceptual Design | |||||||
E | 185 | Periodic Status Reports for BPA | |||||||
F | 132 | No Report Required Per COR |