Contract 85957: 2010-001-00 EXP LOWER NASON CREEK FLOODPLAIN DESIGN
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
85957
Contract Title:
2010-001-00 EXP LOWER NASON CREEK FLOODPLAIN DESIGN
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Issued
Contract Description:
Under this contract Chelan County Natural Resource Department (CCNRD) will develop 30% conceptual designs for Nason Creek RM 2.5-3.4. We will evaluate the mainstem channel, floodplain and floodplain channels, and other adjacent lands and develop conceptual designs that address process deficiencies to improve in-stream conditions and better connect the floodplain and historical side channels. We propose to complete all work necessary to identify and analyze alternative restoration methods and prepare conceptual designs for the preferred alternative. We will hire a contract engineer and will, among other tasks, compile and assess existing data; collect and assess site data (e.g., land survey, characterize in-stream and wetland habitats, etc.); develop models (e.g., hydraulic, habitat suitability, geomorphic gradeline relative elevation, etc.); identify opportunities and constraints; and prepare conceptual  engineering designs based on these efforts. Lower Nason Creek has been identified as a priority HUC12 Watershed for restoration actions supporting recovery of spring Chinook, steelhead and bull trout. Restoration actions that are likely to be implemented are known to positively influence habitats that support priority life stages of these species including adult holding, spawning/incubation, and summer and winter juvenile rearing.

This project was approved for funding through Bonneville Power Administration (BPA)/Upper Columbia Salmon Recovery Board (UCSRB) FY2020 Targeted Solicitation Notice and was reviewed and ranked by the Regional Technical Team (RTT).  The RTT is a team of technical experts familiar with the priority areas and limiting factors, and identify projects that will best contribute to the recovery of salmonids and other species of concern in the Upper Columbia.

The Upper Columbia Salmon Recovery Board (UCSRB) is co-sponsor to this Upper Columbia Programmatic Habitat Project selected through the BPA Targeted Solicitation in 2020.  As such, UCSRB is a key partner to BPA and within the UC region, a local first point of contact for general Programmatic inquiries and coordination.  It is possible from time to time that the UCSRB may seek general project information and updates from CCNRD to preform and fulfill their necessary role and obligations under the Northwest Power and Conservation Council approved Programmatic with BPA.  CCNRD has agreed to coordinate with UCSRB and accommodate any such requests.  As examples, UCSRB may request the following:

Participation in periodic BPA-UCSRB-Sponsor check-in calls, if/as needed
Information about partner contributions for reporting cost-share
Copies of presentations about the BPA-UCSRB Programmatic project  

The contractor CCNRD, its designated agents, sub-consultants and project stakeholders will be available, responsive and will collaboratively address contract related issues during the term of the contract.  Contract issues include but are not limited to technical, policy, regulatory, project management and associated elements related to the project.  Successful execution of this contract is contingent on alignment of the preceding contract issues with the BFAI or BPI and BPA contracting processes, project management plans, design review protocols (including but not limited to BPA HIP design review).

CCNRD's Contract Manager and any design consultant (a mutually agreed to and selected subcontractor) will all cooperate, coordinate, collaborate, and maintain effective communication with the BPA PM/COR, EC Lead, HIP Review Lead, and Hydraulic Engineer(s) during the entire length of this contract with regards to project design.  CCNRD will address BPA comments and concerns, and the three entities will arrive at a mutually beneficial consensus.  
Account Type(s):
Expense
Contract Start Date:
09/15/2020
Contract End Date:
09/14/2021
Current Contract Value:
$124,541
Expenditures:
$100,234

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Scott Bailey Chelan County Yes Contract Manager scott.bailey@co.chelan.wa.us (509) 679-2131
Victoria Bohlen Bonneville Power Administration Yes COR vlbohlen@bpa.gov (503) 230-3506
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Jamie Cleveland Bonneville Power Administration Yes Interested Party jacleveland@bpa.gov (503) 230-3160
Joseph Connor Bonneville Power Administration Yes F&W Approver jwconnor@bpa.gov (503) 230-3172
Edward Gresh Bonneville Power Administration No Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Mike Kaputa Chelan County No Supervisor mike.kaputa@co.chelan.wa.us (509) 667-6584
Sarah Walker Upper Columbia Salmon Recovery Board No Interested Party sarah.walker@ucsrb.org (509) 630-8226


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
EC NEPA, ESA, and NHPA Deliverable A: 165. Obtain Required Permits, Authorizations, and Documentation for the Lower Nason Creek Floodplain Design Project 09/14/2021
Effective implementation management and timely contract administration D: 119. Manage BPA Contracting Requirements 09/14/2021 09/13/2021
Conceptual (30%) Design E: 175. Develop 30% Conceptual Design 09/14/2021
Lower Nason Data Collection & Report F: 115. Existing Conditions Assessment 09/14/2021 09/09/2021
Stakeholder Coordination Summary Memorandum G: 191. CCNRD will coordinate with stakeholders and BPA 09/14/2021 09/09/2021
Improvement of riparian habitat at the Nason 2.3 Project Site Complete. H: 198. Nason Creek Re-vegetation Subcontract 12/31/2020 10/30/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 198 Maintain Vegetation
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Required Permits, Authorizations, and Documentation for the Lower Nason Creek Floodplain Design Project
B 185 Periodic Status Reports for BPA
C 132 Progress Reporting to UCSRB
D 119 Manage BPA Contracting Requirements
E 175 Develop 30% Conceptual Design
F 115 Existing Conditions Assessment
G 191 CCNRD will coordinate with stakeholders and BPA
H 198 Nason Creek Re-vegetation Subcontract 10/26/2020