Contract 86582: 1998-019-00 EXP WIND RIVER WATERSHED - USFS
Project Number:
Title:
Wind River Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Wind 100.00%
Contract Number:
86582
Contract Title:
1998-019-00 EXP WIND RIVER WATERSHED - USFS
Contract Continuation:
Previous: Next:
83768: 1998-019-00 EXP WIND RIVER WATERSHED - USFS
  • 89145: 1998-019-00 EXP WIND RIVER WATERSHED - USFS
Contract Status:
Closed
Contract Description:
The Wind River Watershed project is a collaborative effort to restore wild steelhead in the Wind River.  The four agencies working in this partnership include the US Forest Service (FS), Washington Department of Fish and Wildlife (WDFW), U.S. Geological Survey Columbia River Research Lab (CRRL), and Underwood Conservation District (UCD).  The partnership was established in the early 1990's and with support from BPA, has continued to conduct important habitat, research, monitoring and coordination activities across the watershed.  The project works at multiple levels to identify and characterize key limiting habitat factors in the Wind River, to restore degraded habitats and watershed processes, to measure, track and document fish populations, life histories, and interactions, and to share information with all interested parties.

This FY2021 contract funds continued habitat restoration in Trout Creek, an important tributary to the Wind River.  Work identified under this contract is intended to complete our treatment of Lower Trout Creek near the Hemlock restoration site where we recently reopened an abandoned side channel.  Under this contract, we will make final adjustments to the outlet of the recently reopened side channel, and will decompact previously disturbed areas used for the project and plant with native trees and shrubs.  In addition, we will conduct surveys of the instream and side channel habitat restoration work just completed in Lower Trout Creek, to ensure that the work is functioning as intended and is not in need of any followup.  Continued maintenance and operation of the Wind River Gage will occur this year to support the research, monitoring and restoration activities of the Wind River Watershed Project.  A bubbler will be installed at the gagesite to better capture flow levels in late summer early fall when flows are at annual lows.  



Account Type(s):
Expense
Contract Start Date:
11/01/2020
Contract End Date:
10/31/2021
Current Contract Value:
$73,956
Expenditures:
$73,956

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Iaa
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Lindsey Arotin Bonneville Power Administration Yes Env. Compliance Lead ldarotin@bpa.gov (503) 230-4039
Joshua Ashline Bonneville Power Administration Yes COR jdashline@bpa.gov (503) 230-3862
Erin Black US Forest Service (USFS) No Supervisor ekblack@fs.fed.us (509) 395-3411
Jessica Clark US Forest Service (USFS) No Administrative Contact Jessica.Clark@usda.gov (360) 891-5168
Bengt Coffin (USFS) US Forest Service (USFS) Yes Contract Manager bcoffin@fs.fed.us (509) 395-3425
Kate Day US Department of Agriculture (USDA) No Interested Party kate.day@usda.gov (509) 675-0075
Jennifer McKenna Bonneville Power Administration No CO Assistant jmmckenna@bpa.gov (503) 314-8915
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Jesse Wilson Bonneville Power Administration Yes F&W Approver jcwilson@bpa.gov (503) 230-4506


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
EC Completed A: 165. Complete all Contract EC 10/31/2021 10/31/2021
Share Project Information B: 191. Share Project Activity and Progress with Partner Agencies 10/31/2021 10/31/2021
Data Collection C: 157. Operate and Maintain Wind River Gage 10/31/2021 10/31/2021
Maintained Large Wood Structures in Lower Trout F: 186. Conduct visual surveys, photo points, and measure physical parameters to assure habitat structure in Lower Trout Creek is functioning as intended 10/31/2021 10/31/2021
Final Plan G: 174. Develop a restoration plan for the Upper Trout Creek Flats 10/31/2021 10/31/2021
Deliverable: Receipt of NPCC Recommendation for Anadromous Fish Habitat and Artificial Production Review H: 141. Other Reports for BPA 08/31/2021 09/30/2021
Annual Progress Report I: 132. Submit Progress Report for the Period (Jan 2019) to (Dec 2020) 10/30/2021
Contract Management Completed K: 119. Manage Wind River Project 10/31/2021 10/31/2021
30% Designs Complete L: 175. New - Produce 30% Design for Trib #2 Fish Passage Structure 10/29/2021
30% Designs Complete M: 175. New - Produce 30% Design for Trib #6 Fish Passage Structure 10/29/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete all Contract EC
B 191 Share Project Activity and Progress with Partner Agencies
C 157 Operate and Maintain Wind River Gage 11/09/2021
D 47 CANCELED - Plant Riparian Vegetation at the Lower Trout Creek Restoration Site 09/14/2020
E 29 CANCELED - Large wood and rock placement in Lower Trout Creek side channel
F 186 Conduct visual surveys, photo points, and measure physical parameters to assure habitat structure in Lower Trout Creek is functioning as intended 11/09/2021
G 174 Develop a restoration plan for the Upper Trout Creek Flats
H 141 Other Reports for BPA
I 132 Submit Progress Report for the Period (Jan 2019) to (Dec 2020)
J 185 Periodic Status Reports for BPA
K 119 Manage Wind River Project
L 175 New - Produce 30% Design for Trib #2 Fish Passage Structure 11/09/2021
M 175 New - Produce 30% Design for Trib #6 Fish Passage Structure 11/09/2021