Annual Progress Report |
B: 132. Annual Progress Report (11-1-20 to 10-31-21) |
|
03/15/2022 |
03/31/2022 |
All administrative tasks fulfilled with timely quality products |
C: 119. Oversight of Project Activities |
|
10/31/2022 |
10/31/2022 |
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces |
D: 114. Identify and select projects for Walla Walla Basin |
|
05/15/2022 |
06/30/2022 |
Evidence Based Prioritization Approach |
E: 191. Walla Walla basin watershed coordination |
|
10/31/2022 |
09/30/2022 |
Environmental Compliance complete |
F: 165. Environmental Compliance Documentation for all Exp actions |
|
10/31/2022 |
10/31/2022 |
Youth and Adult Presentations |
G: 99. Youth and adult presentations |
|
10/31/2022 |
09/30/2022 |
North Fork Walla Walla River RM 4-8 Restoration Design Project |
H: 175. North Fork Walla Walla River RM 4-8 Restoration Design Project |
|
10/31/2022 |
10/31/2022 |
Plant trees in underperforming locations near the most downstream boundary of the project reach. |
I: 47. NFWWR Riparian Planting at River Mile 4 |
|
10/31/2022 |
10/31/2022 |
Install culverts at specified spring seep locations. |
J: 55. NFWWR Base Flow Spring Protection & Culvert Placement-Spring Protection and Culvert Placement |
|
10/31/2022 |
10/26/2022 |
Complete installation of wooden protective fencing structures around vulnerable springs. |
K: 40. NFWWR Base Flow Spring Protection & Culvert Placement - Spring Protection and Culvert Placement |
|
10/31/2022 |
10/26/2022 |
South Fork Walla Walla River Base Flow Assessment Completed |
L: 115. NFWWR Base Flow Spring Protection & Culvert Placement-Base Flow Assessment and (GDE) level 1 Spring Inventory |
|
10/31/2022 |
10/31/2022 |
Install Couse Creek Rm 4 Floodplain and Aquatic Habitat Restoration |
M: 29. Couse Creek RM 4 Floodplain and Aquatic Habitat Restoration |
|
10/31/2022 |
10/31/2022 |
Implement project to restore fish passage. |
N: 85. Couse Creek at Blue Mountain Station |
|
10/31/2022 |
10/26/2022 |
Establish a functioning riparian area throughout the length of the Lampson Side channel |
O: 198. Establish preferred species of self-sustaining riparian vegetation |
|
10/31/2022 |
10/31/2022 |
Surface Water Data collected for fish passage and habitat water monitoring |
P: 157. Collect Surface Water Data for Fish Passage and Flow Restoration |
|
10/31/2022 |
10/31/2022 |
Produce accessible, error-checked datasets |
Q: 157. Collect Water Temperature Data for Fish Passage and Flow Restoration |
|
10/31/2022 |
10/31/2022 |
Updated WWBWC Database |
R: 160. Maintain Surface Water Database for Water Monitoring |
|
10/31/2022 |
10/31/2022 |
Maintain water temperature database |
S: 160. Maintain Water Temperature Database for Fish Habitat Monitoring |
|
10/31/2022 |
10/31/2022 |
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management |
T: 162. Analyze Surface Water Data for Fish Habitat Monitoring |
|
10/31/2022 |
10/31/2022 |
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management |
U: 162. Analyze Water Temperature Data for Fish Habitat Monitoring |
|
10/31/2022 |
10/31/2022 |
Produce accessible, error-checked datasets used to evaluate the effectiveness of North Fork Walla Walla habitat improvements. |
V: 157. North Fork Walla Walla River Effectiveness Monitoring |
|
10/31/2022 |
10/31/2022 |
Update WWBWC Database with North Fork Walla Walla River data. |
W: 160. North Fork Walla Walla River Effectiveness Monitoring |
|
10/31/2022 |
10/31/2022 |
Deliverable: An accessible, error-checked data set with metadata |
X: 162. North Fork Walla Walla River Effectiveness Monitoring |
|
10/31/2022 |
10/31/2022 |