Province | Subbasin | % |
---|---|---|
Lower Columbia | Willamette | 100.00% |
Previous: | Next: |
---|---|
n/a |
|
* Expenditures data includes accruals and are based on data through 31-Mar-2025.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Lorraine Hudson | US Department of Agriculture (USDA) | No | Administrative Contact | SM.FS.PNWRSPartner@usda.gov | (503) 808-2535 |
Khanida Mote | Bonneville Power Administration | Yes | Contracting Officer | kpmote@bpa.gov | (503) 230-4599 |
Dede Olson | US Forest Service (USFS) | No | Supervisor | dede.olson@usda.gov | (541) 750-7373 |
Brooke Penaluna | US Forest Service (USFS) | Yes | Contract Manager | brooke.penaluna@usda.gov | (541) 758-8783 |
Jessica Power | Bonneville Power Administration | Yes | CO Assistant | jdpower@bpa.gov | (503) 230-4023 |
John Skidmore | Bonneville Power Administration | Yes | F&W Approver | jtskidmore@bpa.gov | (503) 230-5494 |
Shawn Skinner | Bonneville Power Administration | Yes | Env. Compliance Lead | srskinner@bpa.gov | (503) 230-3727 |
Nick Tarvin | US Forest Service (USFS) | No | Administrative Contact | jerry.tarvin@usda.gov | (541) 362-6312 |
Allan Whiting | Bonneville Power Administration | Yes | COR | AHWhiting@bpa.gov | (503) 230-3786 |
A | 225073 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $1,000 | 2.00% | 10/01/2022 | 05/31/2023 |
B | 225074 | 119 | Manage and Administer Projects | Manage and Administer the BPA contract | Timely management and administration of the project and contract. | $5,000 | 10.00% | 06/01/2022 | 05/31/2023 |
C | 225075 | 165 | Produce Environmental Compliance Documentation | Environmental compliance and permitting | Prepare data, documents, and supporting information in order to obtain BPA environmental clearance. | $5,000 | 10.00% | 06/01/2022 | 05/31/2023 |
D | 225076 | 157 | Collect/Generate/Validate Field and Lab Data | Field surveys and Data management | We will follow fish and physical habitat surveys of the Willamette River mainstem following protocol from initial decadal sampling from 2011-2013 (Williams et al. 2014). We will stratify field sampling of the mainstem Willamette River into three sections: upper, middle, and lower. Section designation is based on an analysis of river geomorphology. Each 1-km slice of the mainstem river or floodplain slough (within a river slice) represents a single sampling location site. Sites will be chosen randomly within each of the three river sections. We propose to sample 6 repeated 1-km slices (eg sites) in each section of the mainstem Willamette River, for a total of 18 sites (eg 6 sample sites x 3 river sections). We will sample native and non-native fish in the entire mainstem Willamette River and the McKenzie River up to Trailbridge Dam. Sampling will be conducted from June to November 2022. Within each sample location, fish will be captured with a boat and backpack electrofisher by two netters. We will sample shallow microhabitats along the shore in each sampling site to represent the variety of nearshore habitats at each site. Physical habitat characteristic data are collected wherever electrofishing occurs either by boat or backpack. At the end of each sampling effort, fish will be identified to species and measured (length), and habitat characteristics of the sampling sites recorded. Oregon State University staff (the subcontractors) will perform field surveys and data management. | $17,500 | 35.00% | 06/01/2022 | 05/31/2023 |
E | 225077 | 162 | Analyze/Interpret Data | Analyze Data and Implications of Results | All fish sampling data collected in 2022 will be entered and error checked for comparison to previous decadal sampling from 2011-2013. Previous monitoring of the mainstem Willamette River from 2011 to 2013 provided a baseline for our current monitoring of native and non-native fish communities and evaluation of status and trends. Physical habitat data will be collected and but not analyzed under this contract. Our proposed work is designed to make estimates of 1) abundance of native and nonnative fishes 2) richness of fish community 3) proportion of native species 4) proportion of salmonids in the mainstem Willamette River. Oregon State University staff (the subcontractors) will analyze data. | $17,500 | 35.00% | 06/01/2022 | 05/31/2023 |
F | 225078 | 132 | Produce Progress (Annual) Report | Submit Progress Report for the period (June 2022) to (May 2023) | The RME progress report summarizes the project goal, objectives, research hypotheses, completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or any ramping up or ramping down of contract components or of the project as a whole. The report will use the RME reporting template found on CB fish, under EF&W program documents. Sponsor can contact COR to confirm they have the must current reporting template. | $4,000 | 8.00% | 08/01/2022 | 03/15/2023 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Effective implementation management and timely contract administration | B: 119. Manage and Administer the BPA contract | 05/31/2023 | 09/30/2022 | |
Environmental compliance documentation is completed | C: 165. Environmental compliance and permitting | 05/31/2023 | 09/30/2022 | |
Produce accessible, error-checked datasets | D: 157. Field surveys and Data management | 05/31/2023 | 12/31/2022 | |
An accessible, error-checked data set with metadata | E: 162. Analyze Data and Implications of Results | 05/31/2023 | 03/31/2023 | |
Completed Annual Report | F: 132. Submit Progress Report for the period (June 2022) to (May 2023) | 03/15/2023 | 03/31/2023 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened) |
|
Steelhead (O. mykiss) - Upper Willamette River DPS (Threatened) |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Chub, Oregon (Oregonichthys crameri) (Endangered through FY2015) |
|
Cutthroat Trout, Coastal (O. clarkii clarkii)- Resident Populations |
|
Lamprey, Western Brook (L. richardsoni) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Trout, Rainbow (Oncorhynchus mykiss) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 119 | Manage and Administer the BPA contract | |||||||
C | 165 | Environmental compliance and permitting | |||||||
D | 157 | Field surveys and Data management | 03/01/2022 | ||||||
E | 162 | Analyze Data and Implications of Results | |||||||
F | 132 | Submit Progress Report for the period (June 2022) to (May 2023) |