Contract 90574: 1992-026-01 EXP WILLOW CREEK FISH PASSAGE HUBER DAM
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
90574
Contract Title:
1992-026-01 EXP WILLOW CREEK FISH PASSAGE HUBER DAM
Contract Continuation:
Previous: Next:
85908: 1992-026-01 EXP FREE WILLOW/LOWER WILLOW CK FISH PASSAGE
Contract Status:
Closed
Contract Description:
Willow Creek, a tributary of the Grande Ronde River, is located at the downstream and north end of the Grande Ronde valley near Imbler, Oregon. The Huber Irrigation dam is located on RM 2.28 . The construction of the irrigation dam in the 1950’s introduced physical obstructions for salmonid migration.  In combination with instream flow limitations during key times of the year, passage of adult salmonids upstream and juvenile salmonids downstream is potentially completely blocked as surface flow decreases. Although adult steelhead are able to negotiate the dam structure at higher flow, spring/summer Chinook salmon adults moving into Willow Creek in the early summer months are specifically impacted by the decrease of instream flow and installation of stoplogs in the dam structure each year.

Summer steelhead currently inhabit the mainstem and tributaries of Willow Creek. Adults typically enter Willow Creek in March through mid-June each year and some of the highest redd densities in the subbasin have been documented. Juvenile steelhead outmigration timing varies with the age of the fish but most often coincides with increases in stream flow during the spring and fall. Chinook adults currently returning to the downstream reach may begin migrating into the watershed and juvenile outmigrants could leave the system during either the spring peak flows or fall freshets.

Objectives:  Improve and restore passage by constructing bypass channel at the the dam site would increase the availability of habitat for salmonids. Steelhead adults would have a longer opportunity to pass these obstructions and juveniles could move more easily downstream or avoid high water temperatures. 2)  Construct fish passage that maintain access and use of irrigation water for water rights holders and irrigators, and 3) Construct a sustainable, permittable, easily maintained design at a reasonable cost.

All permitting has been completed under the technical assistance project.

Account Type(s):
Expense
Contract Start Date:
07/01/2022
Contract End Date:
06/30/2023
Current Contract Value:
$240,245
Expenditures:
$240,245

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Permitting A: 165. Environmental Compliance 07/01/2022 09/30/2022
Complete installation of 1 fish ladder at Huber Dam B: 184. Installation of the Huber fish ladder 12/30/2022 09/30/2022
Re-seed all disturbed areas C: 47. Post Project seeding 06/30/2023 11/01/2022
Effective implementation management and timely contract administration D: 119. Project/Contract Administration 06/30/2023 11/01/2022
Upload Willow Creek Fish Passage Huber Dam Completion Report E: 132. Willow Creek Fish Passage Huber Dam Completion Report 06/30/2023 12/20/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance
B 184 Installation of the Huber fish ladder 04/11/2022
C 47 Post Project seeding 05/04/2022
D 119 Project/Contract Administration
E 132 Willow Creek Fish Passage Huber Dam Completion Report
F 185 Quarterly Status Reports