Contract 94306: 1997-056-00 EXP YAKAMA SOUTHERN TERRITORIES HABITAT PROJECT
Project Number:
Title:
Yakama Southern Territories Habitat Project (STHP)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Klickitat 100.00%
Contract Number:
94306
Contract Title:
1997-056-00 EXP YAKAMA SOUTHERN TERRITORIES HABITAT PROJECT
Contract Continuation:
Previous: Next:
56662 REL 281: 1997-056-00 EXP YAKAMA SOUTHERN TERRITORIES HABITAT PROJECT
  • CR-373358: 1997-056-00 EXP YAKAMA SOUTHERN TERRITORIES HABITAT PROJECT
Contract Status:
Issued
Contract Description:
SOUTHERN TERRITORIES HABITAT PROJECT

CCR-51096 - Administrative CCR to extend agreement end date to from 12/31 to 3/31 to align with SOW. Budget changes include habitat coordinator position title change and adding funds to account for indirect rate update and increased costs.

The overall goal of the Southern Territories Habitat Project (STHP) is to restore watershed processes to aid the recovery of salmonid stocks in the Mid-Columbia Region.  The Yakama Nation Fisheries Program and Yakima-Klickitat Fisheries Project (YKFP) work throughout the Yakama Reservation, usual-and-accustomed and ceded areas, managing harvest, habitat, and hatcheries, and conducting research, monitoring and evaluation around salmon, steelhead, lamprey, sturgeon, bridgelip suckers and other fish of tribal and ecological importance.  The long-term and landscape-scale view of resource management held by Yakama people—that everything is connected— is reflected in the approach to protecting and restoring healthy and resilient habitats and is succinctly stated as a “watershed” or “ridgetop to ridgetop” approach. The proposed expansion of the geographic scope of this project is a reflection of the YN’s landscape level approach and a recognition that species of concern span administrative and watershed boundaries and thus recovery efforts benefit from a larger spatial scope.

STHP is sub-project within the YKFP.  The YKFP is a joint project of the Yakama Nation (lead entity) and the Washington State Department of Fish and Wildlife and is sponsored in large part by the Bonneville Power Administration with oversight and guidance from the Northwest Power and Conservation Council. The goal of the YKFP is to restore sustainable and harvestable populations of salmon, steelhead and other at-risk species that were historically present within Yakama Territories. In addition, to habitat protection and restoration work, YKFP pursues hatchery supplementation or reintroduction strategies to achieve the project goals.

PROJECT GOALS

To achieve the broad goal of restoring watershed processes to aid salmonid recovery, STHP utilizes a three prong approach:
- Assess watershed, habitat and fish conditions/status to inform the prioritization of restoration activities.
- Protect, restore, and enhance priority watershed and reaches.
- Provide educational opportunities and public outreach related to salmon, habitat, and water quality and watershed health.

Project Prioritization:

In 2021 the Klickitat Lead Entity Technical Committee collaboratively analyzed the most current biological and physical habitat data to prioritize areas and actions for habitat restoration at the watershed level. The Salmon Recovery Strategy Prioritization Framework determined tier A, B, and C priority areas and prioritized potential restoration projects within the Klickitat, White Salmon and Rock Ck basins. The Prioritization Framework and results can be found at: https://klickitatcounty.org/243/Salmon-Habitat-Recovery.

The Tepee Creek LTPBR reach is located within the White Creek Subwatershed which is a high ranking Tier A subwatershed. The
Tepee Creek LTPBR project will address high priority limiting habitat factors as defined by the prioritization framework, to benefit the limiting life stages for steelhead (rearing and spawning) by adding small diameter wood to increase channel roughness and increase pool frequency. Implementation will result in reducing channel downcutting, improved channel complexity, increasing pool frequency, floodplain reconnection, and sediment deposition and sorting.

The Swale Creek LTPBR reach is located within the Swale Creek Subwatershed which is a high ranking Tier B subwatershed. The
Swale Creek LTPBR project will address high priority limiting habitat factors as defined by the prioritization framework, to benefit the limiting life stages for steelhead (rearing and spawning) by adding small diameter wood to increase channel roughness and increase pool frequency. Implementation will result in enhancing floodplain and riparian function.

The White Creek LWD project reach is located within the Swale Creek Subwatershed which is a high ranking Tier B subwatershed. The Rattlesnake Gulch Road x-ing LTPBR project will address high priority limiting habitat factors as defined by the prioritization framework, to benefit the limiting life stages for steelhead (rearing and spawning) by reconnecting ~3 miles of steelhead habitat and restoring natural sediment, water, and drainage patterns, especially at tributary mouths.

Project Design:

Tepee Creek LTPBR  - Anabranch Solutions, 2021, IGC 56662 REL 235

Swale Creek LTPBR  - Anabranch Solutions, 2021, IGC 56662 REL 235

Howard Lake 32 Rd/Upper Klickitat Floodplain Enhancement - Parr Excellence, 2022-2023, IGC 56662 REL 259

White Creek LWD Replenishment Phase 2 - YN, 2022-2023, IGC 56662 REL 259-280

Lower Snyder Creek Restoration - Inter-Fluve, 2022-2024, IGC 56662 REL 259

Brush Creek 175 X-ing - Waterways, 2021, IGC 56662 REL 208

Walaluuks Creek LTPBR, Waterways, 2021, IGC 56662, REL 208

Project Construction:

Middle Tepee Creek LTPBR (year 1 implementation) - design (Anabranch Solutions, 2021) and permitting is in-progress.  Construction will be conducted by YN staff.

Swale Creek LTPBR (year 2 implementation) -  the design (Anabranch Solutions, 2021)  is complete and permitting complete (2023).  Construction will be conducted by YN staff.

Walaluuks Creek LTPBR (year 1 implementation) - the design (Waterways Consulting, 2021) is complete and permitting in-progress.  Construction will be conducted by YN staff and subcontracted stewardship crew.

White Creek LWD Phase 2 (implementation) - the design (YN 2023) is complete and permitting in-progress.  Construction will be conducted by a subcontracted heavy lift helicopter company.
Account Type(s):
Expense
Contract Start Date:
04/01/2024
Contract End Date:
03/31/2025
Current Contract Value:
$1,202,649
Expenditures:
$642,294

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Baumler Bonneville Power Administration Yes COR CEBaumler@bpa.gov (630) 461-5871
Catherine Clark Bonneville Power Administration No Env. Compliance Lead cmclark@bpa.gov (503) 230-4240
Patrick Hayden Yakama Confederated Tribes Yes Technical Contact phayden@ykfp.org (509) 945-2325
David Lindley Yakama Confederated Tribes Yes Contract Manager dlindley@ykfp.org (509) 369-3565
Tiffany Petersen Yakama Confederated Tribes Yes Interested Party tpetersen@ykfp.org (509) 790-8798
Jessica Power Bonneville Power Administration Yes CO Assistant jdpower@bpa.gov (503) 230-4023
Rubi Rodriquez Yakama Confederated Tribes No Administrative Contact rubi_rodriquez@yakama.com (509) 865-5121x6335
Bill Sharp Yakama Confederated Tribes Yes Supervisor Bill_Sharp@yakama.com (509) 865-5121x6355
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Morgan Tynan Yakama Confederated Tribes No Interested Party morgan_tynan@yakama.com (509) 945-6083x6352
Adrienne Wilson Yakama Confederated Tribes No Administrative Contact Adrienne_Wilson@Yakama.com (509) 865-5121x6306
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. BPA and SRFB Project Management and Administration 03/31/2025
Prepare Necessary Documentation for Various Environmental Compliance Needs B: 165. Prepare Necessary Documentation for Various Environmental Compliance Needs 03/31/2025
Coordinate and Complete Sec 106 Clearance for 3 Projects C: 165. Conduct Cultural Resource Surveys and Obtain Cultural Resources Clearance 08/30/2024 08/12/2024
Salmon Education and Habitat Education/Outreach D: 99. Project Outreach 03/31/2025
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish E: 114. Select, Prioritize, and Begin to Develop Projects for Implementation Over the Next 2-3 Years 03/31/2025
Attend Technical Meetings F: 122. Assist Planning Activities - Technical Review 03/31/2025
Develop Preliminary Design for Reach 1, 2 and Klickitat River Side-channel G: 175. Klickitat: Snyder Creek Confluence and Klickitat Side Channel 03/31/2025
Complete Final Design for Howard Lake Road/Upper Klickitat Floodplain Enhancement H: 175. Klickitat: Produce Design - Howard Lake Road/Upper Klickitat Floodplain Enhancement 03/31/2025
Complete Final Design for Upper Tepee Creek LTPBR I: 175. Klickitat: Produce Final Design - Low-Tech Process-Based Restoration (PALs, BDA's) - Upper Tepee Creek 03/31/2025
Geotechnical Report J: 175. Klickitat: Produce Geotechnical Report - Brush Creek Road X-ing 10/31/2024
Implement White Creek LWD Phase 2 Project K: 29. Klickitat: White Creek LWD Phase II Helicopter Placement RM 5-8 - Install LWD 11/29/2024
Implement LTPBR on Middle Tepee Creek L: 29. Klickitat: Middle Tepee Creek/Tepee Creek Extension Low Tech - Install Low Tech Structures 10/31/2024
Completed channel reconnection M: 30. Klickitat: Middle Tepee Creek/Tepee Creek Extension Low Tech - Install Low Tech Structures 12/31/2024
Implement Year 2 of Swale Creek LTPBR Project N: 29. Klickitat: Swale Creek Low Tech Project (Phase 2 continuation) Low Tech (RM1-2) - Install Low Tech Structures 10/31/2024
Construct 14 LTPBR structure complexes O: 29. Rock Creek: Walaluuks Creek Rkm 6-8 Low Tech - Install Low Tech Structures 12/31/2024
Plant 250 Native Plants and Shrubs P: 47. Klickitat: Revegetate Rattlesnake Gulch Ck (Swale Ck Tributary) Fish Passage Project site completed under REL 281 WE L 11/15/2024
Grow 1,000 containerized plants at the Klickitat Field Office Nursery. Q: 47. Klickitat: Manage Native Nursery 03/31/2025
Conduct Vegetation Maintenance at Past Project Sites R: 198. Klickitat Watershed - Past Restoration Project Sites 11/15/2024
Deliverable: An accessible, error-checked data set with metadata S: 162. Klickitat: Summarize/Analyze Habitat Enhancement Monitoring Data 03/31/2025
Produce accessible, error-checked datasets T: 157. Klickitat: Streamflow Monitoring 03/31/2025
Deliverable: An accessible, error-checked data set with metadata U: 162. Klickitat: Summarize/Analyze Streamflow Monitoring Data 03/31/2025
Renew and administer 200 acre lease V: 92. Rock Creek: Lease 200 Acres of Land for Fisheries Conservation and Enhancement 03/31/2025
Research feasibility and secure lease for 480 acres for conservation values W: 92. Rock Creek: Lease 480 acres of Land for Fisheries Conservation and Enhancement (Carried forward from REL 281) 03/31/2025
Conduct weed removal efforts on 2+ acres of land X: 198. Rock Creek: Invasive Weed Control at Eight Riparian Restoration Sites 11/30/2024
Plant 100 native trees and shrubs at Shiike site. Y: 198. Supplemental Planting at Shiike Site RM19 11/15/2024
Plant 300 native trees and shrubs at 3 sites totaling ~3 acres. Z: 47. Rock Creek: Plant Riparian Vegetation at Gasline, Simcoe, and Milk Creek 03/31/2025
PIT tag 200 - 2000 juvenile steelhead during fish population surveys in the 2024 spring and fall seasons AA: 158. Rock Creek: PIT Tag Juvenile Steelhead 03/31/2025
Tag 50 - 800 juvenile coho with a PIT tag during spring and fall population surveys AB: 158. Rock Creek: PIT Tag Juvenile Coho 03/31/2025
Collect 500 genetic samples from juvenile steelhead AC: 115. Rock Creek: Genotyping of Juvenile Steelhead Fin Clips 03/31/2025
Conduct juvenile steelhead population and low flow habitat surveys and collect genetic samples AD: 157. Rock Creek: Conduct Juvenile Steelhead Population Surveys 03/31/2025
Final report of Rock Creek steelhead life histories based from fish PIT tag interrogation AE: 157. Rock Creek: Conduct Adult and Juvenile Steelhead PIT Tag Monitoring 03/31/2025
Spawning Surveys: Rock Creek database with results presented in Annual Report AF: 157. Rock Creek: Spawning Ground Surveys (redd counts) and Scale Collection 03/31/2025
Compilation of error checked data and summary report AG: 162. Rock Creek: Analyze Population Monitoring Information 03/31/2025
Water Monitoring: Rock Creek Data AH: 157. Rock Creek: Water Quality and Temperature 03/31/2025
Provide Technical Support to the USFS in the Wind River Basin AI: 122. Wind River - Dry Creek USFS Technical Support 03/31/2025
Completed Progress (Annual) Report AJ: 132. STHP: Submit Progress Report for the period (1/1/2024 to (12/31/2024) 03/31/2025
Completed Annual Report AK: 132. STHP: Submit Progress Report for the period (1/1/2021 to 12/31/2023) 12/31/2024
Completed Annual Report AL: 132. Rock Creek: Submit Progress Report for the Period (1/1/2024) to (12/31/24) 03/31/2025
Completed Annual Report AM: 132. Rock Creek: Submit Progress Report for the period (1/1/2019) to (12/31/2023) 07/01/2024 06/14/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 162 Analyze/Interpret Data
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 115 Produce Inventory or Assessment
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 3 instances of WE 198 Maintain Vegetation
  • 4 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 47 Plant Vegetation
  • 2 instances of WE 92 Lease Land
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 4 instances of WE 175 Produce Design
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 3 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 BPA and SRFB Project Management and Administration
B 165 Prepare Necessary Documentation for Various Environmental Compliance Needs
C 165 Conduct Cultural Resource Surveys and Obtain Cultural Resources Clearance
D 99 Project Outreach
E 114 Select, Prioritize, and Begin to Develop Projects for Implementation Over the Next 2-3 Years
F 122 Assist Planning Activities - Technical Review
G 175 Klickitat: Snyder Creek Confluence and Klickitat Side Channel 04/01/2024
H 175 Klickitat: Produce Design - Howard Lake Road/Upper Klickitat Floodplain Enhancement 04/01/2024
I 175 Klickitat: Produce Final Design - Low-Tech Process-Based Restoration (PALs, BDA's) - Upper Tepee Creek 04/01/2024
J 175 Klickitat: Produce Geotechnical Report - Brush Creek Road X-ing 04/01/2024
K 29 Klickitat: White Creek LWD Phase II Helicopter Placement RM 5-8 - Install LWD 09/10/2024
L 29 Klickitat: Middle Tepee Creek/Tepee Creek Extension Low Tech - Install Low Tech Structures 09/07/2024
M 30 Klickitat: Middle Tepee Creek/Tepee Creek Extension Low Tech - Install Low Tech Structures 09/07/2024
N 29 Klickitat: Swale Creek Low Tech Project (Phase 2 continuation) Low Tech (RM1-2) - Install Low Tech Structures 03/01/2024
O 29 Rock Creek: Walaluuks Creek Rkm 6-8 Low Tech - Install Low Tech Structures
P 47 Klickitat: Revegetate Rattlesnake Gulch Ck (Swale Ck Tributary) Fish Passage Project site completed under REL 281 WE L 03/01/2024
Q 47 Klickitat: Manage Native Nursery 07/15/2024
R 198 Klickitat Watershed - Past Restoration Project Sites 07/15/2024
S 162 Klickitat: Summarize/Analyze Habitat Enhancement Monitoring Data
T 157 Klickitat: Streamflow Monitoring 07/15/2024
U 162 Klickitat: Summarize/Analyze Streamflow Monitoring Data
V 92 Rock Creek: Lease 200 Acres of Land for Fisheries Conservation and Enhancement 07/17/2023
W 92 Rock Creek: Lease 480 acres of Land for Fisheries Conservation and Enhancement (Carried forward from REL 281) 07/17/2023
X 198 Rock Creek: Invasive Weed Control at Eight Riparian Restoration Sites 07/15/2024
Y 198 Supplemental Planting at Shiike Site RM19 01/19/2024
Z 47 Rock Creek: Plant Riparian Vegetation at Gasline, Simcoe, and Milk Creek 03/01/2024
AA 158 Rock Creek: PIT Tag Juvenile Steelhead 07/15/2024
AB 158 Rock Creek: PIT Tag Juvenile Coho 07/15/2024
AC 115 Rock Creek: Genotyping of Juvenile Steelhead Fin Clips 07/15/2024
AD 157 Rock Creek: Conduct Juvenile Steelhead Population Surveys 07/15/2024
AE 157 Rock Creek: Conduct Adult and Juvenile Steelhead PIT Tag Monitoring 07/15/2024
AF 157 Rock Creek: Spawning Ground Surveys (redd counts) and Scale Collection 07/15/2024
AG 162 Rock Creek: Analyze Population Monitoring Information
AH 157 Rock Creek: Water Quality and Temperature 07/15/2024
AI 122 Wind River - Dry Creek USFS Technical Support
AJ 132 STHP: Submit Progress Report for the period (1/1/2024 to (12/31/2024)
AK 132 STHP: Submit Progress Report for the period (1/1/2021 to 12/31/2023)
AL 132 Rock Creek: Submit Progress Report for the Period (1/1/2024) to (12/31/24)
AM 132 Rock Creek: Submit Progress Report for the period (1/1/2019) to (12/31/2023)
AN 185 Periodic Status Reports for BPA