Province | Subbasin | % |
---|---|---|
Intermountain | Columbia Upper | 100.00% |
Previous: | Next: |
---|---|
94282: 1995-027-00 EXP LAKE ROOSEVELT STURGEON RECOVERY |
* Expenditures data includes accruals and are based on data through 28-Feb-2025.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Daniel Affonso | Bonneville Power Administration | Yes | Contracting Officer | dxaffonso@bpa.gov | (503) 230-5918 |
Edward Gresh | Bonneville Power Administration | Yes | Env. Compliance Lead | esgresh@bpa.gov | (503) 230-5756 |
Peter Lofy | Bonneville Power Administration | Yes | F&W Approver | ptlofy@bpa.gov | (503) 230-4193 |
Carlos Matthew | Bonneville Power Administration | Yes | COR | cjmatthew@bpa.gov | (503) 230-3418 |
Andy Miller | Spokane Tribe | Yes | Contract Manager | amiller@spokanetribe.com | (509) 244-7031 |
Brent Nichols | Spokane Tribe | Yes | Supervisor | bnichols@spokanetribe.com | (509) 244-7031x200 |
Jessica Power | Bonneville Power Administration | No | CO Assistant | jdpower@bpa.gov | (503) 230-4023 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Complete Environmental Compliance | A: 165. Complete BPA Environmental Compliance | 03/31/2026 | ||
Release BY 2024 PIT Tagged and Scute Marked Juvenile Hatchery White Sturgeon | B: 158. PIT Tag and Scute Mark Hatchery White Sturgeon | 02/28/2026 | ||
Release Hatchery White Sturgeon (BY 24) | C: 176. Rear & Release BY 2025 Hatchery Origin White Sturgeon into Lake Roosevelt/Upper Columbia River | 03/31/2026 | ||
Distribute Data and Results amongst Project Participants and the UCWSRI | D: 161. Provide Summary Data to Project Participants and the Upper Columbia White Sturgeon Initiative | 03/31/2026 | ||
Produce accessible, error-checked datasets | E: 157. Conduct Juvenile White Sturgeon Monitoring | 03/31/2026 | ||
Juvenile Sampling Data Analysis | F: 162. Analysis of Juvenile Monitoring Data | 03/31/2026 | ||
Stock Assessment Data Analysis | G: 162. Analysis of Lake Roosevelt White Sturgeon Recovery Project Adult Sturgeon Data | 03/31/2026 | ||
Acoustic Telemetry Monitoring | H: 157. Monitor and Maintain the Lake Roosevelt Acoustic Array | 03/31/2026 | ||
Acoustic Telemetry Analysis | I: 162. Analysis of Lake Roosevelt White Sturgeon Recovery Project Telemetry Data | 03/31/2026 | ||
Produce accessible, error-checked datasets | J: 157. Collect BY25 White Sturgeon Larvae for the Conservation Aquaculture Program | 03/31/2026 | ||
Deliverable: An accessible, error-checked data set with metadata | K: 162. Analysis of 2024 Larval Collection Data | 03/31/2026 | ||
Produce accessible, error-checked datasets | L: 157. Determine Ploidy Rates (8N, 10N, and 12N) of Wild Caught Larvae Produced for the Conservation Aquaculture Program | 03/31/2026 | ||
Deliverable: An accessible, error-checked data set with metadata | M: 162. Analysis of Blood Sample Data to Determine Ploidy Rates | 03/31/2026 | ||
Produce accessible, error-checked datasets | N: 157. Conduct Stock Assessment Survey in the Lower Reservoir (Gifford to Spokane River Mouth) | 03/31/2026 | ||
Deliverable: An accessible, error-checked data set with metadata | O: 162. Analysis of Stock Assessment Data | 03/31/2026 | ||
Produce accessible, error-checked datasets | P: 157. Conduct Diet Analysis on Walleye in the Transboundary Reach | 03/31/2026 | ||
Deliverable: An accessible, error-checked data set with metadata | Q: 162. Analysis of Stomach Contents | 03/31/2026 | ||
Develop, Organize and Participate in Public Outreach Activities | R: 99. Lake Roosevelt White Sturgeon Recovery Project Public Outreach | 03/31/2026 | ||
Upload Plan to CBfish | S: 174. Produce Annual Production Plan | 03/31/2026 | ||
Effective implementation management and timely contract administration | T: 119. Manage and Administer Lake Roosevelt White Sturgeon Recovery Project Contracts | 03/31/2026 | ||
Completed Progress (Annual) Report | U: 132. Submit Progress Report for the Period April 2023 to March 2024 | 06/28/2025 | ||
Completed Progress (Annual) Report | V: 132. Submit 2024 (Annual) Progress Report for the Period (April 2024) to (March 2025) | 03/31/2026 |
Primary Focal Species | Work Statement Elements |
---|---|
Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Complete BPA Environmental Compliance | |||||||
B | 158 | PIT Tag and Scute Mark Hatchery White Sturgeon | 01/21/2025 | ||||||
C | 176 | Rear & Release BY 2025 Hatchery Origin White Sturgeon into Lake Roosevelt/Upper Columbia River | 01/21/2025 | ||||||
D | 161 | Provide Summary Data to Project Participants and the Upper Columbia White Sturgeon Initiative | |||||||
E | 157 | Conduct Juvenile White Sturgeon Monitoring | 01/21/2025 | ||||||
F | 162 | Analysis of Juvenile Monitoring Data | |||||||
G | 162 | Analysis of Lake Roosevelt White Sturgeon Recovery Project Adult Sturgeon Data | |||||||
H | 157 | Monitor and Maintain the Lake Roosevelt Acoustic Array | 01/21/2025 | ||||||
I | 162 | Analysis of Lake Roosevelt White Sturgeon Recovery Project Telemetry Data | |||||||
J | 157 | Collect BY25 White Sturgeon Larvae for the Conservation Aquaculture Program | 01/21/2025 | ||||||
K | 162 | Analysis of 2024 Larval Collection Data | |||||||
L | 157 | Determine Ploidy Rates (8N, 10N, and 12N) of Wild Caught Larvae Produced for the Conservation Aquaculture Program | 01/21/2025 | ||||||
M | 162 | Analysis of Blood Sample Data to Determine Ploidy Rates | |||||||
N | 157 | Conduct Stock Assessment Survey in the Lower Reservoir (Gifford to Spokane River Mouth) | 01/21/2025 | ||||||
O | 162 | Analysis of Stock Assessment Data | |||||||
P | 157 | Conduct Diet Analysis on Walleye in the Transboundary Reach | 01/21/2025 | ||||||
Q | 162 | Analysis of Stomach Contents | |||||||
R | 99 | Lake Roosevelt White Sturgeon Recovery Project Public Outreach | |||||||
S | 174 | Produce Annual Production Plan | 01/21/2025 | ||||||
T | 119 | Manage and Administer Lake Roosevelt White Sturgeon Recovery Project Contracts | |||||||
U | 132 | Submit Progress Report for the Period April 2023 to March 2024 | |||||||
V | 132 | Submit 2024 (Annual) Progress Report for the Period (April 2024) to (March 2025) | |||||||
W | 185 | Periodic Status Reports for BPA |