This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
Work Element Budget (Current Performance Period) | $1,990 | $600 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 10/1/2018 | 12/31/2018 | Concluded | Maura Eagan Moody (Inactive) | 9/4/2018 5:50:51 PM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff. | |||||||
B | PUBPROTOCOL | Review, revise, and publish Protocol and Methods in MonitoringResources.org | 10/1/2018 | 9/30/2019 | Concluded | Maura Eagan Moody (Inactive) | 8/1/2018 3:43:29 PM |
Description: The Protocol (including temporal and spatial design) and Methods for this work element are stored at MonitoringResources.org and need to be finalized (i.e., "Published" through MonitoringResources.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously published Protocols/Methods to ensure that they are consistent with how work will be done in any subsequent contract. | |||||||
C | Obtain and assemble updated flow targets | 10/1/2018 | 9/30/2019 | Concluded | Maura Eagan Moody (Inactive) | 8/1/2018 3:43:29 PM | |
Description: Update flow targets by stream, methodology used, entity that established the target reported by Subbasin (or smaller HUC if available), and incorporate this information into database. Include hydrologic data on priority stream reaches (where available) at key points with amount of flow added by water transactions. | |||||||
D | National Fish and Wildlife staff collect data in field with Qualified Local Entity on Tier 3 streams | 10/1/2018 | 9/30/2019 | Concluded | Maura Eagan Moody (Inactive) | 8/1/2018 3:46:06 PM | |
Description: Work with Qualified Local Entities (QLEs) to collect monitoring data on Tier 3 streams in the field as appropriate. | |||||||
E | Effectiveness monitoring | 10/1/2018 | 9/30/2019 | Concluded | Maura Eagan Moody (Inactive) | 6/12/2018 3:36:05 PM | |
Description: Deploy Water Temperature Translation Tool (W3T) on 3-5 priority Tier 3 stream reaches, collect and analyze data, and review for lessons learned. | |||||||
F | Monitoring program implementation | 10/1/2018 | 9/30/2019 | Concluded | Maura Eagan Moody (Inactive) | 8/1/2018 3:46:06 PM | |
Description: The National Fish and Wildlife Foundation (NFWF) will coordinate with Qualified Local Entities (QLEs), contractors, state agencies, and academic institutions to coordinate, collect, and analyze QLE obtained flow data and continue developing a strategy for Columbia Basin Water Transaction Program (CBWTP) to demonstrate the habitat and biological response in tributary from program transactions as scientifically defensible. NFWF will coordinate, collect, and analyze QLE obtained flow data. | |||||||
G | Obtain compliance monitoring data from Qualified Local Entities | 10/1/2018 | 9/30/2019 | Concluded | Maura Eagan Moody (Inactive) | 6/12/2018 3:36:05 PM | |
Description: Obtain Tier 1 and Tier 2 data from Qualified Local Entities (QLEs). | |||||||
H | Explore creation of a repository for collected data | 10/1/2018 | 9/30/2019 | Concluded | Maura Eagan Moody (Inactive) | 8/1/2018 3:46:06 PM | |
Description: National Fish and Wildlife Foundation (NFWF) will explore existing open source options for storing, organizing, and analyzing collected data so it can be updated, queried, and built into a report as needed. | |||||||
I | DELIV | Monitoring information obtained | 9/30/2019 | Concluded | Maura Eagan Moody (Inactive) | 6/12/2018 3:36:05 PM | |
Description: Validate and compile new data, review reports. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Tributary Habitat | Tributary Habitat | |||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Project Implementation/Compliance Monitoring | Project Implementation/Compliance Monitoring |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
59106 | 48.930463 | -119.420433 | Washington | Okanogan | Columbia Cascade | Okanogan |
68992 | 48.130365324 | -119.677467675 | Washington | Okanogan | Columbia Cascade | Okanogan |
70808 | 48.360201 | -119.582631 | Washington | Okanogan | Columbia Cascade | Okanogan |
85582 | 48.979103 | -119.352936 | Washington | Okanogan | Columbia Cascade | Okanogan |
85589 | 48.751322 | -119.343109 | Washington | Okanogan | Columbia Cascade | Okanogan |
86538 | 48.543864 | -119.582942 | Washington | Okanogan | Columbia Cascade | Okanogan |
86542 | 48.529054 | -119.502325 | Washington | Okanogan | Columbia Cascade | Okanogan |
86544 | 48.651964 | -119.47478 | Washington | Okanogan | Columbia Cascade | Okanogan |
86546 | 48.363225 | -119.584031 | Washington | Okanogan | Columbia Cascade | Okanogan |
89434 | 48.400061 | -119.757113 | Washington | Okanogan | Columbia Cascade | Okanogan |
89443 | 48.398209 | -119.333496 | Washington | Okanogan | Columbia Cascade | Okanogan |
Title | Link |
---|---|
Columbia Basin Water Transactions Program | http://www.cbwtp.org/jsp/cbwtp/index.jsp |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
CBWTP - Flow Restoration Accounting Framework v1.0 | rankin holmes | Finalized | NFWF Collect/Generate/Validate Field and Lab Data - National Fish and Wildlife Foundation v1.0 |
ID | Name | Type | Optional | Customized Based On | Status |
---|---|---|---|---|---|
169 | Determining effectiveness of passage project structures v1.0 | Data Collection | Yes | N/A | Finalized |
174 | Discharge-Field Measurements v1.0 | Data Collection | Yes | N/A | Finalized |
853 | Site Discharge Calculation v1.0 | Data Analysis/Interpretation | Yes | N/A | Finalized |
1451 | Stream Cross-sectional Discharge Measurement (wading) v1.0 | Data Collection | Yes | N/A | Finalized |
847 | Stream Discharge v1.0 | Data Collection | Yes | N/A | Finalized |
Title | Category | Subcategory | Subcategory focus 1 | Subcategory focus 2 |
---|---|---|---|---|
Instream Flow | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Instream Flow - Velocity | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Instream Flow - AF | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Instream Flow - CFS | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Wetted Width and Depth | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Instream Flow - Temperature | Water Quality | Water Temperature (ID: 162) | NA | NA |