Title | Link |
---|---|
Columbia Basin Water Transactions Program | http://www.cbwtp.org/jsp/cbwtp/index.jsp |
This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
1. 83308 (10/01/2019 - 09/30/2020) | $3,950 | $8,737 | ||
Work Element Budget (Current Performance Period) | $3,950 | $8,737 |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | 10/1/2019 | 9/30/2020 | Concluded | Jessica Power | 7/13/2020 8:02:25 AM |
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff. | |||||||
B | PUBPROTOCOL | Review, revise, and publish Protocol and Methods in MonitoringResources.org | 10/1/2019 | 9/30/2020 | Concluded | Jessica Power | 7/13/2020 8:02:25 AM |
Description: The Protocol (including temporal and spatial design) and Methods for this work element are stored at MonitoringResources.org and need to be finalized (i.e., "Published" through MonitoringResources.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously published Protocols/Methods to ensure that they are consistent with how work will be done in any subsequent contract. | |||||||
C | Download and analyze flow data | 10/1/2019 | 9/30/2020 | Concluded | Jessica Power | 7/13/2020 8:02:25 AM | |
Description: Downloaded data, analyze and track | |||||||
D | Maintain existing flow gauges | 10/1/2019 | 9/30/2020 | Concluded | Jessica Power | 7/13/2020 8:02:25 AM | |
Description: Umatilla QLEs - Maintan existing flow gauges | |||||||
E | Collect flow data | 10/1/2019 | 9/30/2020 | Concluded | Jessica Power | 7/13/2020 8:02:25 AM | |
Description: Travel to sites and field time collecting flow measurements | |||||||
F | Coordinate with partners to develop, collect, and analyze physical, biological & chemical data where avaliable | 10/1/2019 | 9/30/2020 | Concluded | Jessica Power | 7/13/2020 8:02:25 AM | |
Description: Coordinate with agencies, organizations, and individuals to develop monitoring plans, collect data, and analyze data in accordance with relevant restoration plans. | |||||||
G | DELIV | Data collected, captured, created and/or validated | 9/30/2020 | Concluded | Jessica Power | 7/13/2020 8:02:25 AM | |
Description: Validate and compile new data and review reports. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Tributary Habitat | Tributary Habitat | |||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Project Implementation/Compliance Monitoring | Project Implementation/Compliance Monitoring |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
30552 | 45.14623 | -118.20761 | Oregon | Union | Blue Mountain | Grande Ronde |
33573 | 45.146 | -118.208 | Oregon | Union | Blue Mountain | Grande Ronde |
33574 | 45.200317 | -117.84956 | Oregon | Union | Blue Mountain | Grande Ronde |
Title | Link |
---|---|
Columbia Basin Water Transactions Program | http://www.cbwtp.org/jsp/cbwtp/index.jsp |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
CBWTP - Flow Restoration Accounting Framework v1.0 | rankin holmes | Finalized | TFT - Collect / Generate / Validate field Data for Water Transactions - National Fish and Wildlife Foundation: Instream Flow Restoration v1.0 |
ID | Name | Type | Optional | Customized Based On | Status |
---|---|---|---|---|---|
169 | Determining effectiveness of passage project structures v1.0 | Data Collection | Yes | N/A | Finalized |
174 | Discharge-Field Measurements v1.0 | Data Collection | Yes | N/A | Finalized |
853 | Site Discharge Calculation v1.0 | Data Analysis/Interpretation | Yes | N/A | Finalized |
1451 | Stream Cross-sectional Discharge Measurement (wading) v1.0 | Data Collection | Yes | N/A | Finalized |
847 | Stream Discharge v1.0 | Data Collection | Yes | N/A | Finalized |
Title | Category | Subcategory | Subcategory focus 1 | Subcategory focus 2 |
---|---|---|---|---|
Instream Flow | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Instream Flow - Velocity | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Instream Flow - AF | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Instream Flow - CFS | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Wetted Width and Depth | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Instream Flow - Temperature | Water Quality | Water Temperature (ID: 162) | NA | NA |