Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
Select a work element:
Contract Number:
Contract Title:
2003-013-01 EXP. WATER ENTITIY - CBWTP
Contract Start Date:
10/1/2019
Contract End Date:
9/30/2020
Title:
AI: 157 - (Umatilla) Umatilla QLE - Collect/Generate/Validate Field Data for Water
Description:
This work element captures work to collect, create, generate, or capture source data. Includes initial entering of data into a computer spreadsheet/database, developing automated data capture programs/routines and related hardware/software (e.g., PDAs, data loggers, thermographs), preparing metadata, and quality assurance/quality control processes. Also includes taking samples for later analysis and any preparations for collecting data if not covered by another work element. It also includes generating secondary/derived data when those data are stored in a database for access and use by other parties for analysis like primary data. Capturing data includes entering data into a computer from historical records, digitizing images, and other methods for converting information to digital format. Information on methodology, protocol, and data storage location, to be used for this work element.
WE Agreement Type:
Contracted
Deliverable Specification:
Validate and compile new data and review reports.
WSE Effective Budget:
$8,737
% of Total WSE Effective Budget:
0.28%
WSE Start:
10/01/2019
WSE End:
09/30/2020
WSE Completion:
09/30/2020
WSE Progress:
Concluded
WSE ID Continued From:
n/a
WSE ID Continued To:
n/a
Finite or Recurring:
Recurring

SOWRevision Planned Updated Contractor Comments (optional) BPA Comments (optional)
1. 83308 (10/01/2019 - 09/30/2020) $3,950 $8,737
Work Element Budget (Current Performance Period) $3,950 $8,737

7 Milestones
Sort Type Title Start End Status Modified By Modified Date
A EC Environmental compliance requirements complete 10/1/2019 9/30/2020 Concluded Jessica Power 7/13/2020 8:02:25 AM
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff.
B PUBPROTOCOL Review, revise, and publish Protocol and Methods in MonitoringResources.org 10/1/2019 9/30/2020 Concluded Jessica Power 7/13/2020 8:02:25 AM
Description: The Protocol (including temporal and spatial design) and Methods for this work element are stored at MonitoringResources.org and need to be finalized (i.e., "Published" through MonitoringResources.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously published Protocols/Methods to ensure that they are consistent with how work will be done in any subsequent contract.
C Download and analyze flow data 10/1/2019 9/30/2020 Concluded Jessica Power 7/13/2020 8:02:25 AM
Description: Downloaded data, analyze and track
D Maintain existing flow gauges 10/1/2019 9/30/2020 Concluded Jessica Power 7/13/2020 8:02:25 AM
Description: Umatilla QLEs - Maintan existing flow gauges
E Collect flow data 10/1/2019 9/30/2020 Concluded Jessica Power 7/13/2020 8:02:25 AM
Description: Travel to sites and field time collecting flow measurements
F Coordinate with partners to develop, collect, and analyze physical, biological & chemical data where avaliable 10/1/2019 9/30/2020 Concluded Jessica Power 7/13/2020 8:02:25 AM
Description: Coordinate with agencies, organizations, and individuals to develop monitoring plans, collect data, and analyze data in accordance with relevant restoration plans.
G DELIV Data collected, captured, created and/or validated 9/30/2020 Concluded Jessica Power 7/13/2020 8:02:25 AM
Description: Validate and compile new data and review reports.

Work Site ID Latitude Longitude State County Province Subbasin
30552 45.14623 -118.20761 Oregon Union Blue Mountain Grande Ronde
33573 45.146 -118.208 Oregon Union Blue Mountain Grande Ronde
33574 45.200317 -117.84956 Oregon Union Blue Mountain Grande Ronde

Primary Focal Species:
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU; Coho (O. kisutch) - Unspecified Population; Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened); Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered); Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened); Steelhead (O. mykiss) - Snake River DPS (Threatened)
Secondary Focal Species:
Lamprey, Pacific (Entosphenus tridentata); Trout, Bull (S. confluentus) (Threatened)

Title Link
Columbia Basin Water Transactions Program http://www.cbwtp.org/jsp/cbwtp/index.jsp
Study Plan Name Study Plan Owner Protocol State Sample Design Name
CBWTP - Flow Restoration Accounting Framework v1.0 rankin holmes Finalized TFT - Collect / Generate / Validate field Data for Water Transactions - National Fish and Wildlife Foundation: Instream Flow Restoration v1.0

ID Name Type Optional Customized Based On Status
169 Determining effectiveness of passage project structures v1.0 Data Collection Yes N/A Finalized
174 Discharge-Field Measurements v1.0 Data Collection Yes N/A Finalized
853 Site Discharge Calculation v1.0 Data Analysis/Interpretation Yes N/A Finalized
1451 Stream Cross-sectional Discharge Measurement (wading) v1.0 Data Collection Yes N/A Finalized
847 Stream Discharge v1.0 Data Collection Yes N/A Finalized

Title Category Subcategory Subcategory focus 1 Subcategory focus 2
Instream Flow Hydrology/Water Quantity Flow (ID: 104) NA NA
Instream Flow - Velocity Hydrology/Water Quantity Flow (ID: 104) NA NA
Instream Flow - AF Hydrology/Water Quantity Flow (ID: 104) NA NA
Instream Flow - CFS Hydrology/Water Quantity Flow (ID: 104) NA NA
Wetted Width and Depth Hydrology/Water Quantity Flow (ID: 104) NA NA
Instream Flow - Temperature Water Quality Water Temperature (ID: 162) NA NA