Title | Link |
---|---|
Columbia Basin Water Transactions Program | http://www.cbwtp.org/jsp/cbwtp/index.jsp |
This page provides details of the selected work element.
SOWRevision | Planned | Updated | Contractor Comments (optional) | BPA Comments (optional) |
---|---|---|---|---|
1. 93260 (10/01/2023 - 09/30/2024) | $297,968 | $260,662 | updated budget includes final invoice | |
2. Amendment 001 (10/01/2023 - 09/30/2024) | $297,968 | $260,662 | updated budget includes final invoice | |
Work Element Budget (Current Performance Period) | $292,968 | $260,662 | updated budget includes final invoice |
Sort | Type | Title | Start | End | Status | Modified By | Modified Date |
---|---|---|---|---|---|---|---|
A | EC | Environmental compliance requirements complete | Concluded | Matthew Schwartz | 11/22/2024 1:23:41 PM | ||
Description: On-the-ground work associated with this work element cannot proceed until this milestone is complete. Milestone is complete when final documentation is received from BPA environmental compliance staff. | |||||||
B | PUBPROTOCOL | Review, revise, and finalize study plan sample design protocol and methods in MonitoringResouces.org | 10/1/2023 | 9/30/2024 | Active | Matthew Schwartz | 11/22/2024 1:23:41 PM |
Description: The Study Plan's Sample Design, Protocol and Methods for this work element are stored at MonitoringResources.org and need to be completed (i.e., "Finalized" through MonitoringResources.org), preferably prior to data collection. Preparations for contract renewals must include reviewing any previously finalized Sample Designs, Protocols & Methods to ensure that they are consistent with how work will be done in any subsequent contract. | |||||||
C | Develop Monitoring Plan | 10/1/2023 | 9/30/2024 | Active | Matthew Schwartz | 11/22/2024 1:23:41 PM | |
Description: Coordinate with agencies, organizations, and individuals to develop monitoring plans, collect data, and analyze data in accordance with relevant restoration plans. QLE compliance and implementation monitoring should be carried out via CBWTP's FRAF and other recommendations made by the monitoring consultant. Current, FRAF as well as the DRAFT monitoring workplan underdevelopment are available in CBFish. | |||||||
D | Maintain Existing Flow Gauges | 10/1/2023 | 9/30/2024 | Active | Matthew Schwartz | 11/22/2024 1:23:41 PM | |
Description: Maintain existing flow gauges. | |||||||
E | Download and Analyze Flow Data | 10/1/2023 | 9/30/2024 | Active | Matthew Schwartz | 11/22/2024 1:23:41 PM | |
Description: Download, track, and analyze flow data. | |||||||
F | Collect Flow Data | 10/1/2023 | 9/30/2024 | Active | Matthew Schwartz | 11/22/2024 1:23:41 PM | |
Description: Travel to sites and field time collecting flow measurements. | |||||||
G | DELIV | Monitoring Plan and Data Collection Complete | 9/30/2024 | Active | Matthew Schwartz | 11/22/2024 1:23:41 PM | |
Description: Data collection and analyses of flow measurements and water quality data for project streams, file annual monitoring report with CBWTP and states as required. |
Metric | Planned | Actual | Contractor Comments | Measures | HLIs |
---|---|---|---|---|---|
1464. Primary R, M, and E Focal Strategy [Population Status, Hydrosystem, Tributary Habitat, Estuary/Ocean, Harvest, Hatchery, Predation, Multiple Strategies] | Tributary Habitat | Tributary Habitat | |||
1472. Primary R, M, and E Type [Status and Trend Monitoring, Action Effectiveness Research, Uncertainties Research, Project Implementation/ Compliance Monitoring] | Project Implementation/Compliance Monitoring | Project Implementation/Compliance Monitoring |
Work Site ID | Latitude | Longitude | State | County | Province | Subbasin |
---|---|---|---|---|---|---|
36289 | 45.2756 | -117.9323 | Oregon | Union | Blue Mountain | Grande Ronde |
86679 | 45.14623 | -118.20761 | Oregon | Union | Blue Mountain | Grande Ronde |
89737 | 45.146 | -118.208 | Oregon | Union | Blue Mountain | Grande Ronde |
89740 | 45.200317 | -117.84956 | Oregon | Union | Blue Mountain | Grande Ronde |
Title | Link |
---|---|
Columbia Basin Water Transactions Program | http://www.cbwtp.org/jsp/cbwtp/index.jsp |
Study Plan Name | Study Plan Owner | Protocol State | Sample Design Name |
---|---|---|---|
CBWTP - Flow Restoration Accounting Framework v1.0 | rankin holmes | Finalized | QLEs - Collect, Generate, and Validate Field Data for Water Transactions - National Fish and Wildlife Foundation 2 v1.0 |
ID | Name | Type | Optional | Customized Based On | Status |
---|---|---|---|---|---|
169 | Determining effectiveness of passage project structures v1.0 | Data Collection | Yes | N/A | Finalized |
174 | Discharge-Field Measurements v1.0 | Data Collection | Yes | N/A | Finalized |
853 | Site Discharge Calculation v1.0 | Data Analysis/Interpretation | Yes | N/A | Finalized |
1451 | Stream Cross-sectional Discharge Measurement (wading) v1.0 | Data Collection | Yes | N/A | Finalized |
847 | Stream Discharge v1.0 | Data Collection | Yes | N/A | Finalized |
Title | Category | Subcategory | Subcategory focus 1 | Subcategory focus 2 |
---|---|---|---|---|
Instream Flow | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Instream Flow - Velocity | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Instream Flow - AF | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Instream Flow - CFS | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Wetted Width and Depth | Hydrology/Water Quantity | Flow (ID: 104) | NA | NA |
Instream Flow - Temperature | Water Quality | Water Temperature (ID: 162) | NA | NA |