Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 20183: PI 200001700 CRITFC RECONDITIONED WILD STEELHEAD KELTS
Project Number:
Title:
Recondition Wild Steelhead Kel
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
20183
Contract Title:
PI 200001700 CRITFC RECONDITIONED WILD STEELHEAD KELTS
Contract Continuation:
Previous: Next:
4185: 2000-017-00 KELT RECONDITIONING RESEARCH IN COLUMBIA BASIN
Contract Status:
History
Contract Description:
Short Description
Continue to test and evaluate methods to recondition steelhead kelts and/or transport them around hydro system, generate science-based management recommendations, and assist in their implementation to rebuild wild steelhead populations throughout the Basin.

This project began in 2001 as a pilot study to investigate the potential and techniques required to recondition post spawn steelhead.  Results have been very promising with reconditioning rates reaching 62.4% in 2003.  

Key areas of research this year include:
• Objective 1: Evaluate effects of directly transporting steelhead kelts around the hydro system on enhancement of iteroparity.
• Objective 2: Evaluate effects of short-term kelt reconditioning and subsequent transportation of kelts around the hydro system on enhancement of iteroparity.
• Objective 3: Evaluate effects of long-term kelt reconditioning and subsequent release for natural spawning on enhancement of iteroparity.
• Objective 4: Evaluate effects of long-term kelt reconditioning and captive spawning on: a) gamete and progeny viability; and b) enhancement of iteroparity.
• Objective 5. Comprehensive project evaluation and management recommendations.

Kelt steelhead will be collected on the Yakima River with data collections made at Prosser Hatchery.  Steelhead will be assigned to no-term, short-term, and long-term experiment groups.  We will have two temporal replicates for the no-term experiment and two replicates for the short-term experiment.  This is the third year of monitoring movement in the lower Columbia River and estuary of steelhead in the "short-term" and "no-term" experiments.  Monitoring is conducted with PIT tags and surgically implanted acoustic tags.  Four acoustic arrays will be deployed in the lower Columbia River and detections at these arrays allow us to calculate survival, migration timing, velocity, and behavior.  Last year steelhead movement behavior seemed to generally fit into two patterns.  One pattern was directly moving through the estuary and into the ocean very quickly.  The second pattern consisted on fish that moved downstream and upstream in a pattern seemly acclimating to the estuary.  This year we are collecting data on blood plasma ion concentration and gill ATPase on fish prior to release.  We hope that these data will correlate with observed movement patterns and eventually lead to the development of predictor of movement.

Success indicators for the long-term reconditioning experiment include survival and rematuration.  Rematuration is determined using sonograms prior to release.  

Gamete and progeny viability analysis will be performed at the University of  Idaho on hatchery fish returning to Dworshak Hatchery.  These fish will then be held for reconditioning at Sweet Water Springs.  Following rematuration these fish will be spawned and gamete and progeny viability analysis performed in order to determine potential effects from artificial reconditioning.  This second spawning and analysis will be completed in the spring of 2007.

This is the first year in which we will have enough data to begin evaluating the relative effectiveness and efficiency of the different reconditioning strategies.  This analysis should provide managers with expected benefits and costs of various scenarios using kelt steelhead for restoration purposes.
Account Type(s):
Expense
Contract Start Date:
01/01/2005
Contract End Date:
12/31/2006
Current Contract Value:
$795,651
Expenditures:
$795,651

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Grant
Pricing Method:
Firm Fixed Price
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Documentation & assistance to support BPA's Environmental Compliance Group A: 165. Secure Permits 03/01/2006 03/01/2006
Collection of kelt steelhead B: 66. Collect kelt steelhead at CJMFF for Kelt Experiments 06/16/2006 06/30/2006
Collect biological data on collected kelt steelhead C: 157. Collect biological data on kelt steelhead 06/30/2006 06/30/2006
PIT tag collected kelt steelhead D: 158. PIT tag kelt steelhead admitted to Prosser Hatchery 06/30/2006 06/30/2006
Accoustic tag no-term and short-term experiment groups E: 158. Implant acoustic tags in kelt steelhead 06/23/2006 06/30/2006
Kelt Steelhead Transported and Released F: 66. Truck and release no-term and short-term kelt steelhead 06/30/2006 06/27/2006
Lower River Migration Data Collection G: 157. Collect migration data on no-term and short-term kelt steelhead 12/29/2006 12/21/2006
Interpret migration data H: 162. Interpret migration data on no-term and short-term kelt steelhead 12/31/2006 12/21/2006
Recondition kelt steelhead I: 63. Recondition kelt steelhead at Prosser for long- and short-term experiments 12/29/2006 12/21/2006
Biological Data Collection on long-term kelts prior to release J: 157. Collect survival, condition, and rematuration data on long-term reconditioned kelt steelhead 12/28/2006 12/21/2006
Data analysis K: 162. Interpret survival, condition, and rematuration data on long-term reconditioned kelt steelhead 12/29/2006 12/21/2006
Progeny and Gamete viability experimental design L: 156. Develop experimental design to investigate gamete viability in kelt steelhead 03/31/2006 08/31/2006
Gamete and Progeny viability study M: 157. Collect gamete and progeny viability data from kelt steelhead 11/15/2006 12/21/2006
Interpret Gamete and Progeny Viability Data N: 162. Interpret gamete and progeny viability data from kelt steelhead 11/15/2006 12/21/2006
Interpret Program Generated Data O: 162. Interpret program generated data 12/29/2006 12/21/2006
Produce Presentations and a Manuscript P: 161. Present findings with presentations 12/29/2006 12/21/2006
Annual Report Q: 132. Report kelt steelhead reconditioning project's annual progress 12/29/2006 12/21/2006
Project management R: 119. Manage subcontracts for kelt steelhead reconditioning 12/31/2006 12/21/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 63 Rear Fish
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 4 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Secure Permits
B 66 Collect kelt steelhead at CJMFF for Kelt Experiments
C 157 Collect biological data on kelt steelhead
D 158 PIT tag kelt steelhead admitted to Prosser Hatchery
E 158 Implant acoustic tags in kelt steelhead
F 66 Truck and release no-term and short-term kelt steelhead
G 157 Collect migration data on no-term and short-term kelt steelhead
H 162 Interpret migration data on no-term and short-term kelt steelhead
I 63 Recondition kelt steelhead at Prosser for long- and short-term experiments
J 157 Collect survival, condition, and rematuration data on long-term reconditioned kelt steelhead
K 162 Interpret survival, condition, and rematuration data on long-term reconditioned kelt steelhead
L 156 Develop experimental design to investigate gamete viability in kelt steelhead
M 157 Collect gamete and progeny viability data from kelt steelhead
N 162 Interpret gamete and progeny viability data from kelt steelhead
O 162 Interpret program generated data
P 161 Present findings with presentations
Q 132 Report kelt steelhead reconditioning project's annual progress
R 119 Manage subcontracts for kelt steelhead reconditioning
S 185 Periodic Status Reports for BPA