Contract 25778: 1992-048-00 EXP HELLSGATE BIG GAME WINTER RANGE
Project Number:
Title:
Hellsgate Big Game Winter Range
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Columbia Upper 100.00%
Contract Number:
25778
Contract Title:
1992-048-00 EXP HELLSGATE BIG GAME WINTER RANGE
Contract Continuation:
Previous: Next:
20947: 1992-048-00 HELLSGATE BIG GAME WINTER RANGE
  • 30842: 1992-048-00 EXP HELLSGATE BIG GAME WINTER RANGE
Contract Status:
Closed
Contract Description:
The Hellsgate Big Game Winter Range Wildlife Mitigation Project (Hellsgate Project) was proposed by the Confederated Tribes of the Colville Reservation (CTCR) as partial mitigation for hydropower's share of the wildlife losses resulting from Chief Joseph and Grand Coulee Dams.      The Northwest Power Planning Council (NPPC) and the Bonneville Power Administration (BPA) approved the Hellsgate Project as partial mitigation for associated impacts from the Grand Coulee and Chief Joseph Dams.   The BPA funds the project and it is carried out in cooperation with CTCR, Bureau of Indian Affairs (BIA), (NPPC), and others.   The project is consistent with Section 1003(b)(7) of the NPPC's Wildlife Rule and Sub-basin plans which address mitigation for wildlife losses due to the Federal Columbia River Power System.   Consistent with the Wildlife Rule, the CTCR have acquired 44,313 acres of land for the biological requirements of wildlife and to manage for the protection and enhancement of critical winter habitat for big game and shrub-steppe/sharp-tailed grouse habitat.   More land will be acquired and managed over time to mitigate for wildlife losses.   The USFWS Habitat Evaluation Procedure (HEP) will be used to determine mitigation credits and in part to monitor the results of project management activities over time.  To date we have acquired about 24,597 HU's towards a total 35,819 HU's lost from hydropower development.

The focus of the Hellsgate Project is the protection, restoration, and enhancement of critical winter habitat for big game and shrub-steppe/sharp-tailed grouse habitat on lands purchased and managed for wildlife mititation on the Colville Indian Reservation.  In addition, the CCT have set aside special management areas (Hellsgate Reserve, Tribal lands, and Agency Butte) surrounding certain Hellsgate Project land parcels to conserve and protect big game winter range and sharp-tailed grouse habitat.  The Hellsgate Project began mitigating for wildlife losses in 1992 and is currently made up of four separate ranches (the Graves, Berg Brothers, W. and H. Kuehne Ranches) and serveral separate parcels (Nespelem Bend and properties within the Hellsgate Reserve).  These land contain similar habitat types to those that were inundated by the dams.  To fully mitigate all the wildlife losses associated with these dams, additional lands need to be acquired and managed under the Tribes Wildlife Mitigation Program (Hellsgate O & M Project).  Each area will have site-specific goals to manage the lands to optimize available habitat for management species (desired future conditions).  These managed lands contain a wide diversity of vegetative types and habitats for a variety of wildlife species.  In all cases, the biological requirements of wildlife and the protection of critical habitat will take precedence over all other land use consideration in the management of these lands.  

Funding for reasonable operation and maintenance, enhancements, restoration, monitoring and evaluation will be provided by the Bonneville Power Administration.  The Hellsgate Project involes the protection of project lands (i.e. boundary fencing, noxious weed conrol and property livestock tresspass), operation and maintenance of acquired lands, enhancement and/or restoration of wildlife species and habitats on those lands with monitoring and evaluation over the long term to ensure that project objectives are being met.  Project lands are located within the San Poil, Upper Columbia and Rufus Woods Sub-Basins and will be evaluated for baseline conditions and species composition.  Data will be used to develop and implement site-specific management plans to protect and enhance wildlife habitat for the life of the Hellsgate Project.
Account Type(s):
Expense
Contract Start Date:
01/01/2006
Contract End Date:
12/31/2006
Current Contract Value:
$720,000
Expenditures:
$720,000

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
NEPA Checklist/Compliance A: 165. NEPA Checkllist Compliance 12/31/2006 12/31/2006
Installation of ten (10) miles of new fence B: 40. Construct New Boundary Fences 12/31/2006 12/31/2006
Completion of building and grounds maintenance and fence repair C: 186. Maintenance of fence, grounds and or buildings 12/31/2006 12/31/2006
Remove trespassing livestock from Mitigation lands D: 26. Removal of tresspassing livestock. 12/31/2006 12/31/2006
Reduction of Weed Infestation E: 53. Control of noxious/undesirable weeds. 12/31/2006 12/31/2006
Deliverable Complete F: 157. Collect Wildlife Species numbers and habitat information. 12/31/2006 12/31/2006
Summarization of data and results G: 161. Reporting of data collected 12/31/2006 12/31/2006
Coordination H: 118. Continue ongoing coordination with concerned/involved organizations. 12/31/2006 12/31/2006
Deliverable Complete I: 87. Inventory and assess habitat conditions using HEP. 12/31/2006 12/31/2006
Deliverable Complete J: 174. Develop/update Site-Specific Management Plans 12/31/2006 12/31/2006
Annual Report For FY05 Contract Period Uploaded to BPA K: 132. Annual Report For FY05 Contract Period 02/28/2006 02/28/2006
Deliverable Complete L: 119. Project Administration 12/31/2006 12/31/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 NEPA Checkllist Compliance
B 40 Construct New Boundary Fences
C 186 Maintenance of fence, grounds and or buildings
D 26 Removal of tresspassing livestock.
E 53 Control of noxious/undesirable weeds.
F 157 Collect Wildlife Species numbers and habitat information.
G 161 Reporting of data collected
H 118 Continue ongoing coordination with concerned/involved organizations.
I 87 Inventory and assess habitat conditions using HEP.
J 174 Develop/update Site-Specific Management Plans
K 132 Annual Report For FY05 Contract Period
L 119 Project Administration
M 185 Quarterly Reporting