Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 27281: 1995 013 00 RESIDENT FISH SUBSTITUTION PROGRAM
Project Number:
Title:
Nez Perce Trout Ponds
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
27281
Contract Title:
1995 013 00 RESIDENT FISH SUBSTITUTION PROGRAM
Contract Continuation:
Previous: Next:
22687: 1995 013 00 RESIDENT FISH SUBSTITUTION PROGRAM
  • 32604: 1995 013 00 EXP NPT RESIDENT FISH SUBSTITUTION PROGRAM
Contract Status:
Closed
Contract Description:
Contract history:

This project began in 1995 as mitigation for lost anadromous fisheries due to construction of Dworshak Dam on the North Fork Clearwater River which flows through the Nez Perce Reservation in north central Idaho.  Three ponds are managed by the project to provide subsistence and recreational harvest opportunities for tribal members using trout fisheries in small, confined ponds (< 3 hectares) stocked with hatchery fish.  The project goal of 4,750 kg of trout harvested annually is limited by insufficient carrying capacity and habitat volume due to eutrophication processes in existing ponds, as well as inadequate quantity of ponds (program originally called for 6-12 ponds).  The project has completed restoration of two original ponds and construction of one new pond.

Summary of FY 06 contract work:  

The current, FY 06 contract includes the operation and maintenance (O&M) of the three existing pond fisheries.  The project will provide all necessary documentation in order to comply with the applicable environmental regulations (NEPA).  The primary objective is to provide tribal harvest opportunities through operation and maintenance of three trout fisheries at Mud Springs, Talmaks, and Tunnel Ponds.  Work tasks related to providing optimal recreational and subsistence harvest include testing and monitoring water quality parameters that determine trout habitat in each pond, and monitoring angler harvest, and using the resulting data to manage fisheries (determine appropriate stocking schedules and rates, in particular).  Periodic seine sampling is conducted to monitor fish health and condition.  Regular site maintenance tasks include access road and fence repair, controlling site access, mowing and aquatic weed removal, and equipment upkeep and repair.  Additional activities include data analysis and report preparation, as well as project coordination and administration.
Account Type(s):
Expense
Contract Start Date:
05/01/2006
Contract End Date:
04/30/2007
Current Contract Value:
$203,916
Expenditures:
$203,916

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Dawn Boorse Bonneville Power Administration No Env. Compliance Lead drboorse@bpa.gov (503) 230-5678
David Kaplowe Bonneville Power Administration Yes COR djkaplowe@bpa.gov (503) 230-5365
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Patricia O'Donnell Bonneville Power Administration Yes Contracting Officer paodonnell@bpa.gov (503) 230-4747
Tod Sween Nez Perce Tribe Yes Contract Manager tods@nezperce.org (208) 621-3582


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance requirements complete A: 165. BPA Environmental compliance 05/05/2006 05/05/2006
Operate and maintain Mud Springs pond on Tribal Unit 11 B: 187. Operate Mud Springs fishery 04/30/2007 03/06/2007
Operate and maintain Talmaks pond on Tribal Unit 14 C: 187. Operate Talmaks fishery 04/30/2007 03/30/2007
Operate and maintain Tunnel Pond along the Clearwater River on Tribal Unit 44 D: 187. Operate Tunnel Pond fishery 04/30/2007 04/11/2007
Fish health monitoring/sampling at Mud Springs Reservoir E: 60. Monitor fish health for rainbow trout at Mud Springs Reservoir 04/30/2007 04/17/2007
Fish health monitoring/sampling at Talmaks Reservoir F: 60. Monitor fish health for rainbow trout at Talmaks Reservoir 04/30/2007 11/17/2007
Fish health monitoring/sampling at Tunnel Pond G: 60. Monitor fish health for rainbow trout at Tunnel Pond 03/31/2007 03/09/2007
Water Quality Data Collection at Mud Springs and Talmaks Reservoirs, and at Tunnel Pond H: 157. Monitor pond habitat at three pond sites 04/30/2007 04/19/2007
Analysis of Water Quality Data from Mud Springs, Talmaks, and Tunnel Ponds I: 162. Analysis of water quality data from three pond sites 04/30/2007 04/10/2007
Total Ammonia-Nitrogen Data Collection at all three pond sites J: 157. Total ammonia-nitrogen testing at all three ponds 04/30/2007 12/12/2006
Analysis of Total Ammonia-Nitrogen Data from Mud Springs, Talmaks, and Tunnel Ponds K: 162. Analysis of nitrogen testing data from three pond sites 04/30/2007 01/31/2007
Coliform Bacteria Data Collection at Mud Springs and Talmaks L: 157. Coliform bacteria testing at Mud Springs and Talmaks 04/30/2007 06/20/2006
Analysis of Coliform Bacteria Data from Mud Springs and Talmaks Ponds M: 162. Analysis of coliform bacteria testing data from Mud Springs and Talmaks 04/30/2007 06/30/2006
Phosphorus Data Collection at Mud Springs N: 157. Monitor phosphorus levels at Mud Springs 04/30/2007 02/28/2007
Analysis of Phosphorus Data from Mud Springs Pond O: 162. Analysis of phosphorus data from Mud Springs 04/30/2007 02/10/2007
Harvest Data Collection at Mud Springs, Talmaks, and Tunnel Ponds P: 157. Harvest monitoring at three pond sites 04/30/2007 03/29/2007
Analysis of Harvest Data from Mud Springs, Talmaks, and Tunnel Ponds Q: 162. Harvest data analysis for three pond sites 04/30/2007 04/30/2007
Coordinated project activities R: 118. Coordination and communication 04/30/2007 04/30/2007
FY 06 June and September accrual estimates and FY 07 SOW package S: 119. Management and administration 03/01/2007 03/01/2007
Final FY 05 annual report U: 132. Complete annual report for BPA 06/30/2006 06/30/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Rainbow (Oncorhynchus mykiss)
  • 3 instances of WE 60 Maintain Fish Health
  • 3 instances of WE 187 Put and Take Fisheries
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 5 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 BPA Environmental compliance
B 187 Operate Mud Springs fishery
C 187 Operate Talmaks fishery
D 187 Operate Tunnel Pond fishery
E 60 Monitor fish health for rainbow trout at Mud Springs Reservoir
F 60 Monitor fish health for rainbow trout at Talmaks Reservoir
G 60 Monitor fish health for rainbow trout at Tunnel Pond
H 157 Monitor pond habitat at three pond sites
I 162 Analysis of water quality data from three pond sites
J 157 Total ammonia-nitrogen testing at all three ponds
K 162 Analysis of nitrogen testing data from three pond sites
L 157 Coliform bacteria testing at Mud Springs and Talmaks
M 162 Analysis of coliform bacteria testing data from Mud Springs and Talmaks
N 157 Monitor phosphorus levels at Mud Springs
O 162 Analysis of phosphorus data from Mud Springs
P 157 Harvest monitoring at three pond sites
Q 162 Harvest data analysis for three pond sites
R 118 Coordination and communication
S 119 Management and administration
T 185 Periodic Status Reports for BPA
U 132 Complete annual report for BPA