Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 30562: 1997 030 00 CHINOOK SALMON ADULT ABUNDANCE MONITORING
Project Number:
Title:
Secesh chinook & Joseph Creek steelhead abundance monitoring
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
30562
Contract Title:
1997 030 00 CHINOOK SALMON ADULT ABUNDANCE MONITORING
Contract Continuation:
Previous: Next:
25619: 1997 030 00 CHINOOK SALMON ADULT ABUNDANCE MONITORING
  • 35429: 199703000 EXP CHINOOK SALMON ADULT ABUNDANCE MONITORING
Contract Status:
Closed
Contract Description:
The Chinook Salmon Adult Abundance Monitoring project collects data for long term monitoring of trends in wild chinook salmon adult escapement and productivity.  This information is used for effective resource management and for use in threatened species recovery monitoring.  Wild salmon escapement monitoring occurs in the Secesh River and the information provides for supplementation program reference stream comparison.  Accurate and precise measurement of adult salmon escapement will be accomplished using dual frequency identification sonar (DIDSON) acoustic imaging techniques.  

This project utilizes DIDSON technology to provide adult salmon escapement information on an annual basis.  As adult salmon migrate upstream through the monitoring site, escapement information is collected via a DIDSON acoustic imaging camera on the Secesh River.  The DIDSON monitoring site allows unimpeded upstream and downstream movement, and fish are not trapped or handled in any manner.  Information collected from this project will allow comparison to redd count survey data to assess if redd count information provides reliable indices of adult salmon escapement.  Accurate abundance data is necessary to calculate derived performance measures such as smolt-to-adult returns, spawner-to spawner ratios, recruits per spawner, population growth rates (lambda) and population trends.  Accurate and precise escapement information has been recognized as necessary component for status monitoring and assessment of progress toward recovery goal metrics for threatened Snake River basin chinook salmon.

Coordination will occur with Idaho Supplementation Studies (ISS), the Johnson Creek supplementation program, and the northeast Oregon hatchery program as the Secesh River represents a control/reference stream for those investigations.  ISS studies will further complement this investigation as they routinely estimate juvenile emigrant abundance which can be used to develop recruit per spawner relationships.  The Pilot study in the South Fork Salmon River explicitly states a need for adult salmon escapement information in the Secesh River at the population level.  Salmon abundance and productivity monitoring on wild populations is also a clearly identified need in the Salmon Subbasin Management Plan (Ecovista 2004).  Federal and state fisheries agencies from Idaho, Oregon, Washington and Alaska have consulted with this project concerning the application of DIDSON technology to monitor fish abundance.  Discussion of standardized data collection, methods, linkages to other research projects has and will continue to occur.  Undoubtedly, this will become an component of a larger comprehensive monitoring and evaluation plan for quantifying abundance, life stage specific survival and population growth for salmon index populations.

The Chinook Salmon Adult Abundance Monitoring project is located in the Secesh River drainage of west central Idaho.  The Secesh River is a tributary to the South Fork Salmon River.  The DIDSON acoustic camera site is located on the Secesh River (rkm 30) at the U. S. Forest Service's Chinook Campground.
Account Type(s):
Expense
Contract Start Date:
01/01/2007
Contract End Date:
12/31/2007
Current Contract Value:
$297,195
Expenditures:
$261,473

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration No Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Deborah Docherty Bonneville Power Administration Yes COR dldocherty@bpa.gov (503) 230-4458
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Paul Kucera Nez Perce Tribe Yes Technical Contact paulk@nezperce.org (208) 634-5290
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Kelly Wasson Nez Perce Tribe No Administrative Contact kellyw@nezperce.org (208) 843-7317


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance complete A: 165. Ensure environmental compliance requirements have been met 12/31/2007 12/31/2007
Coordination and information exchange B: 189. Escapement Monitoring Coordination 12/31/2007 12/31/2007
Installation of a functional escapement monitoring site C: 70. Install equipment at the Secesh River Salmon Escapement Monitoring Site 06/30/2007 05/25/2007
Secesh River wild chinook salmon escapement and productivity data D: 157. Collect wild chinook salmon adult escapement and productivity data 12/31/2007 12/31/2007
Maintain database E: 160. Maintain and protect project data 12/31/2007 12/31/2007
Analyze wild adult salmon escapement and productivity data F: 162. Summarize and analyze project data 12/31/2007 12/31/2007
Share research results with interested parties G: 161. Share results/findings and fulfill data requests 12/31/2007 12/31/2007
Complete annual report H: 132. Annual Report - Reporting Work Elements 07/31/2007 07/31/2007
Manage and Administer Chinook Adult Monitoring Project I: 119. Manage and Administer Chinook Adult Monitoring Project 12/31/2007 12/31/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Ensure environmental compliance requirements have been met 02/09/2007
B 189 Escapement Monitoring Coordination 02/09/2007
C 70 Install equipment at the Secesh River Salmon Escapement Monitoring Site 02/09/2007
D 157 Collect wild chinook salmon adult escapement and productivity data 02/09/2007
E 160 Maintain and protect project data 02/09/2007
F 162 Summarize and analyze project data 02/09/2007
G 161 Share results/findings and fulfill data requests 02/09/2007
H 132 Annual Report - Reporting Work Elements 02/09/2007
I 119 Manage and Administer Chinook Adult Monitoring Project 02/09/2007
J 185 Periodic Status Reports for BPA 02/09/2007