Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 30794: 1991-019-01 EXP HUNGRY HORSE MITIGATION FLATHEAD LAKE
Project Number:
Title:
Hungry Horse Mitigation/Flathead Lake Restoration and Research, Monitoring and Evaluation (RM&E)
Stage:
Implementation
Area:
Province Subbasin %
Mountain Columbia Flathead 100.00%
Contract Number:
30794
Contract Title:
1991-019-01 EXP HUNGRY HORSE MITIGATION FLATHEAD LAKE
Contract Continuation:
Previous: Next:
n/a
  • 36038: 1991-019-01 EXP HUNGRY HORSE MITIGATION FLATHEAD LAKE
Contract Status:
History
Contract Description:
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote "Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam" in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam.  On November 12, 1991, the Northwest Power and Conservation Council (NPCC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7).  A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993.  The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam.  The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904.
Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system.  The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake.  The project also addresses the unstable shoreline habitat within Flathead Lake, and the shifts in species composition within the lake and consequent dominance of new species that restricts the potential success of mitigation measures.  Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures.  The project consists of three components: monitoring, restoration and research.  Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981.  Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters.  Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide creel surveys since 1998.  The restoration component of the project has addressed several stream channel, riparian, and fish passage problems.  The research component of the project began in FY 2000 and measured trophic linkages between Mysis relicta and other species to assist in predicting the results of potential mitigation strategies.  Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds.  Additional funds are drawn from other sources to assist in completion of the remaining objectives.
Activities for FY 2006 include four data collection work elements.  They include quantification of: 1) trends in native species abundance in Flathead Lake by gillnetting surveys, 2) harvest and pressure in Flathead Lake by means of roving interviews and aerial counts, 3) lake trout population trends, and 4) catch rates in stocked, off-site reservoirs.  There are two research-based work elements intended to assist in guiding future mitigation activities.  These research activities address bioenergetics of the Flathead Lake fish community, and the factors controlling shoreline erosion rates in Flathead Lake.  The implementation-level work elements include decommissioning of roads, installation of riparian fences, construction of a natural gravel beach, and conducting fishing contests to reduce lake trout.
Account Type(s):
Expense
Contract Start Date:
09/30/2006
Contract End Date:
04/30/2007
Current Contract Value:
$62,107
Expenditures:
$62,107

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Cecilia Brown Bonneville Power Administration Yes COR ckbrown@bpa.gov (503) 230-3462
Lynn DuCharme Salish and Kootenai Confederated Tribes No Technical Contact lynn.ducharme@cskt.org (406) 883-2888x7279
Les Evarts Salish and Kootenai Confederated Tribes No Administrative Contact les.evarts@cskt.org (406) 675-2700
Barry Hansen Salish and Kootenai Confederated Tribes Yes Technical Contact barry.hansen@cskt.org (406) 883-2888
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Colleen Spiering Bonneville Power Administration No Env. Compliance Lead caspiering@bpa.gov (503) 230-5756
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Narratives for permits and EA's A: 165. Prepare permit applications and EA's 04/30/2007
One fishing contest B: 190. Conduct fishing contests for lake trout 10/23/2006 10/23/2006
Annual Flathead Lake creel survey C: 157. Flathead Lake creel survey 04/30/2007 04/30/2007
Estimates of size and age structure, length at maturity, and mortality rates D: 157. Monitor lake trout biology 04/30/2007 04/30/2007
Six measures of lake trout population dynamics E: 162. Analyze biological parameters of lake trout 04/30/2007 04/30/2007
Reports of erosion rates and causes F: 156. Research shoreline erosion processes 04/30/2007 04/30/2007
List of potential projects G: 114. Pre-planning and coordination of projects 04/30/2007 04/30/2007
FY07 Annual Report H: 132. FY06 Annual Report 04/30/2007
Project oversight and BPA Administrative requirements I: 119. Project management & Complete BPA's contract administrative requirements 04/30/2007 04/30/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Lake (S. namaycush) [OBSOLETE]
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Prepare permit applications and EA's
B 190 Conduct fishing contests for lake trout
C 157 Flathead Lake creel survey
D 157 Monitor lake trout biology
E 162 Analyze biological parameters of lake trout
F 156 Research shoreline erosion processes
G 114 Pre-planning and coordination of projects
H 132 FY06 Annual Report
I 119 Project management & Complete BPA's contract administrative requirements
J 185 Periodic Status Reports for BPA