Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 35518: 1989-035-00 EXP UMATILLA HATCHERY O&M
Project Number:
Title:
Umatilla Hatchery Operations and Maintenance (O&M)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
35518
Contract Title:
1989-035-00 EXP UMATILLA HATCHERY O&M
Contract Continuation:
Previous: Next:
29856: 1989-035-00 EXP UMATILLA HATCHERY O&M
  • 38956: 1989-035-00 EXP UMATILLA HATCHERY O&M
Contract Status:
Closed
Contract Description:
The Northwest Power Planning Council (Council) adopted the Master Plan in 1990 as part of its Fish and Wildlife Program. The Oregon Department of Fish and Wildlife (ODFW), Confederated Tribes of the Umatilla Indian Reservation (CTUIR), and others federal partners designed the Umatilla Hatchery as an experimental tool to achieve adult returns goals (hatchery-origin and natural-origin).  The adult goals include:
·Steelhead (5,500)
·Spring Chinook (8,000)
·Fall Chinook-upriver bright (12,000)
·Coho (6,000)

Maintaining artificial propagation, at its current level, was a recommended action from the Umatilla/Willow Subbasin Planning Team to Northwest Power and Conversation Council to achieve anadromous adult return goals (memo September 27, 2005).  

Fish production has changed in the program due to Umatilla water flow limitations and adaptive management.  Generally, these changes have resulted in reduced production at Umatilla Hatchery and additional fish production in other Columbia Basin hatcheries. Current fish production for the Umatilla Hatchery include:
·Summer Steelhead (150,000 smolts)
·Spring Chinook (810,000 smolts)
·Fall Chinook (600,000 sub-yearling smolts)

Other fish produced and transferred to the Umatilla Subbasin include:
·Fall Chinook (480,000 yearling smolts) from Bonneville Hatchery (John Day mitigation)
·Coho (1,000,000 smolts) from Cascade Hatchery (Mitchell Act)
·Coho (500,000) from Oxbow Hatchery  (Mitchell Act)

This proposal would fund all Umatilla Hatchery fish production, hatchery maintenance, and fish transfers into the Umatilla River Subbasin.
Account Type(s):
Expense
Contract Start Date:
10/01/2007
Contract End Date:
09/30/2008
Current Contract Value:
$966,661
Expenditures:
$966,661

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Assure environmental compliance A: 165. Assurance of Environmental Compliance 10/01/2007 10/01/2007
Steelhead production for release in 2008 B: 176. Produced Steelhead (BY07) 05/31/2008 05/31/2008
Steelhead Production for release in 2009 C: 176. Produce Steelhead (BY08) 09/30/2008 09/26/2008
Spring Chinook production for release in 2007-08 D: 176. Produced Spring Chinook (BY06) 04/30/2008 04/30/2008
Spring Chinook production (BY07) for release in 2009 E: 176. Produce Spring Chinook (BY07) 09/30/2008 09/26/2008
Fall Chinook production for release in 2009 F: 176. Produced Umatilla River fall Chinook eyed eggs (BY06) 03/10/2008 03/01/2008
Fall Chinook production for release in 2008 G: 176. Produce fall Chinook sub-yearlings (BY07) 05/31/2008 05/31/2008
Fish Transfers H: 66. Fish Transport 05/31/2008 05/31/2008
Hatchery Maintenance I: 61. Maintain Umatilla Hatchery 09/30/2008 09/25/2008
2009 Annual Operation Plan (AOP) J: 174. Produce 2009 Annual Operating Plan 08/31/2008 08/31/2008
Monthly Status Reports Complete K: 141. Status Reporting 09/30/2008 09/25/2008
2007-2008 Annual Report (FY08) L: 132. Annual Report 09/30/2008 02/26/2008
Scope of work/budget/property inventory/FY08 year end accruals M: 119. Manage and Administer Projects 09/30/2008 09/25/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 2 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 2 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Assurance of Environmental Compliance 02/09/2007
B 176 Produced Steelhead (BY07) 08/21/2007
C 176 Produce Steelhead (BY08) 08/21/2007
D 176 Produced Spring Chinook (BY06) 09/05/2007
E 176 Produce Spring Chinook (BY07) 09/07/2007
F 176 Produced Umatilla River fall Chinook eyed eggs (BY06) 09/07/2007
G 176 Produce fall Chinook sub-yearlings (BY07) 09/07/2007
H 66 Fish Transport 09/07/2007
I 61 Maintain Umatilla Hatchery 02/09/2007
J 174 Produce 2009 Annual Operating Plan 02/09/2007
K 141 Status Reporting 02/09/2007
L 132 Annual Report 02/09/2007
M 119 Manage and Administer Projects 02/09/2007
N 185 Periodic Status Reports for BPA 02/09/2007