Official acceptance and approval of BA's by applicable compliance representatives. |
A: 165. Prepare Biological Assessments for applicable projects |
|
03/31/2008 |
03/30/2008 |
Obtain DSL/USACE approval on JPA permits |
B: 165. Submit JPA to state and federal entities |
|
01/31/2009 |
03/28/2008 |
Obtain official approval from Tribal & state cultural resource preservation agency representatives. |
C: 165. Cultural Resource protection & preservation |
|
07/15/2008 |
05/01/2008 |
Active participation with co-managerial interests in the Umatilla Basin. |
D: 189. Coordinate with other entities planning & implementing habitat improvements in the Umatilla Basin. |
|
01/31/2009 |
01/31/2009 |
Develop and utilize applicable and effective monitoring techniques |
E: 157. Collect various forms of professional, scientific data for project potential analysis. |
|
01/31/2009 |
02/05/2008 |
Summarized data in the format of professional scientific reports |
F: 162. Analyze/interpret scientific data. |
|
01/31/2009 |
01/31/2009 |
Adherence to details of conservation easements |
G: 172. Secure & adhere to details of conservation easements assoc. w/ habitat project areas as necessary |
|
01/31/2009 |
01/31/2009 |
Delivery of engineered implementation designs/drawings with specifications. |
H: 175. Preparation & submittal of engineering designs/specifications for Birch & Meacham Creek projects. |
|
01/31/2009 |
12/31/2008 |
Secure a mutually agreed water source for landowners at Peterson & Broun dams. |
I: 34. Satisfy water source requirements of landowners at Peterson & Broun dams. |
|
04/30/2008 |
02/29/2008 |
Installation of second well at B&G property. |
J: 34. Install second well for alternative livestock water source on B&G easement, Umatilla River, RM 38. |
|
01/31/2009 |
07/15/2008 |
Installation of fence at Broun property. |
K: 40. Mutually agree on decision to install fence at Broun Dam, Birch Creek. |
|
03/31/2008 |
07/15/2008 |
Improve passage conditions at Peterson Dam. |
L: 85. Rectify fish passage at Peterson Dam, Birch Creek, Birch Creek. |
|
03/31/2008 |
03/31/2008 |
Rectify passage issues at Broun Dam. |
M: 85. Rectify fish passage at Broun Dam, Birch Creek. |
|
03/31/2008 |
03/31/2008 |
Improve instream habitat conditions on Meacham Creek. |
N: 29. Improve habit quality and quantity of instream habitat features in lower Meacham Creek. |
|
01/31/2009 |
01/31/2009 |
Vegetative planting in existing and new project areas. |
O: 47. Supplement riparian areas of existing and new projects with additional vegetation. |
|
01/31/2009 |
01/31/2009 |
Maximize survival of vegetation plantings in CTUIR project areas. |
P: 22. Maintain vegetation plantings at all CTUIR habitat project areas. |
|
01/31/2009 |
01/31/2009 |
removal of non-preferred species of vegetative growth from project areas. |
Q: 53. Control of noxious weeds in project areas by physical and chemical means. |
|
01/31/2009 |
01/31/2009 |
Repair fencing/gates and related properties in riparian areas at habitat project sites. |
R: 186. Repair damaged fencing/gates & related riparian property at habitat project sites, timely manner. |
|
01/31/2009 |
01/31/2009 |
Maintaining proper operation of instream habitat structures. |
S: 186. Monitor & troubleshoot issues that interfere w/ proper function of instream improvement structure |
|
01/31/2009 |
01/31/2009 |
Produce methods for use as monitoring project effectiveness. |
T: 156. Develop strategic and scientifically accepted monitoring methods for application. |
|
01/31/2009 |
12/31/2008 |
Review and provide technical input on issues that may adversely affect natural resources. |
U: 122. Review and provide technical input on issues and topics that affect the areas natural resources. |
|
01/31/2009 |
01/31/2009 |
Attach 2007 Progress Report in Pisces |
V: 132. Submit Progress Report for the period (Feb 2007) to (Jan 2008) |
|
01/31/2009 |
01/08/2009 |
Attach 2008 Progress Report in Pisces |
W: 132. Submit Annual Report for the period (Feb 2008 to Jan 2009). |
|
01/31/2009 |
01/29/2009 |
Complete, produce & have quarterly status reports accepted by COTR. |
X: 119. Produce quarterly status reports to BPA COTR. |
|
01/31/2009 |
01/31/2009 |
Compile spatial data base of riverine habitat in the Umatilla Basin |
Z: 174. MOA Initiate Umatilla watershed habitat assessment plan |
|
01/31/2009 |
01/31/2009 |
Assemble report draft of 2007-2008 summary of projects. |
AA: 141. MOA Draft 2007-2008 & 2008-2009 annual reports |
|
12/31/2008 |
12/31/2008 |
Development of additional water sources to supplement the low annual precipitation of 11". |
AB: 34. MOA Develop additional water sources & strategies to improve survival of riparian vegetational |
|
01/31/2009 |
01/31/2009 |
Utilize area farming practice methods to till established weed areas at the B&G property. |
AC: 48. MOA Conduct tillage strategies at B&G project to improve vegetative planting survival |
|
01/31/2009 |
01/31/2009 |
Removal of non-desirable species of noxious weeds from project area. |
AD: 53. MOA Additional control of noxious weeds by various means |
|
01/31/2009 |
01/31/2009 |
Produce expanded project design for removal of levees on Meacham Creek |
AE: 175. MOA Increased quantity of project designs required for additional levee removal |
|
10/01/2008 |
|
Improve riverine process via levee setback on Meacham Creek. |
AF: 180. MOA Enhance floodplain connectivity and function via levee setback at Meacham Creek |
|
01/31/2009 |
|
Indirectly improve instream habitat conditions in Meacham Creek by softening leeves. |
AG: 29. MOA Indirectly increase instream habitat complexity, by altering Meacham floodplain & riparian areas |
|
01/31/2009 |
01/31/2009 |
Participate in the process of installing a riparian fence, Meacham headwaters. |
AH: 40. MOA Install fence at Meacham Creek headwaters to protect & enhance watershed condition |
|
01/31/2009 |
01/31/2009 |
Acquire GIS Total Station and initiate preparations for maximizing use. |
AI: 160. MOA Create the capasity of autonmy by purchasing and developing GIS Total Survey Station |
|
01/31/2009 |
01/31/2009 |
Proper preparation of soil in riparian area for upcoming grass, shrub, and tree plantings. |
AJ: 47. MOA Prepare B&G project riparian areas for 09 plantings |
|
01/31/2009 |
01/31/2009 |