Province | Subbasin | % |
---|---|---|
Columbia Plateau | Umatilla | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Dawn Boorse | Bonneville Power Administration | No | Env. Compliance Lead | drboorse@bpa.gov | (503) 230-5678 |
Julie Burke | Umatilla Confederated Tribes (CTUIR) | Yes | Administrative Contact | julieburke@ctuir.org | (541) 429-7292 |
Billy Goodrich | Umatilla Confederated Tribes (CTUIR) | No | Technical Contact | billygoodrich@ctuir.org | (541) 966-2383 |
Brenda Heister | Bonneville Power Administration | Yes | Contracting Officer | bsheister@bpa.gov | (503) 230-3531 |
Eric Hoverson | Umatilla Confederated Tribes (CTUIR) | Yes | Contract Manager | erichoverson@ctuir.org | (541) 429-7555 |
Gary James | Umatilla Confederated Tribes (CTUIR) | No | Supervisor | garyjames@ctuir.org | (541) 429-7285 |
Timmie Mandish | Bonneville Power Administration | Yes | COR | tamandish@bpa.gov | (503) 230-3983 |
Rosemary Mazaika | Bonneville Power Administration | Yes | F&W Approver | rxmazaika@bpa.gov | (503) 230-5869 |
Jim Webster | Umatilla Confederated Tribes (CTUIR) | No | Contract Manager | jameswebster@ctuir.org | (541) 429-7240 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental clearance documents received and approved by BPA environmental compliance person | A: 165. Prepare Biological Assessment (BA) & NMFS consultation | 11/30/2007 | 09/30/2007 | |
USACE/SLD permits | B: 165. USACE/SLD Sec/ 404 permits for Meacham & Birch Cr. projects | 01/31/2008 | 12/31/2008 | |
Cultural Preservation Clearance | C: 165. Cultural Preservation Clearance | 07/13/2007 | 06/27/2007 | |
Meeting participation | D: 189. Coordinate with other agencies in planning and implementing habitat improvements in the Subbasin | 01/31/2008 | 01/31/2008 | |
Participate with other entities concerning fish and wildlife habitat | E: 99. Participation with other entities in advisory & educational activities | 01/31/2008 | 01/31/2008 | |
Effectiveness monitoring data | F: 157. Collect redd counts/Suspended Solids/Turbidity, and Benthic Invertebrate Data | 01/31/2008 | 11/27/2007 | |
Analyzed/interpreted data | G: 162. Analyze/interpret redd counts, suspendid solids, & Invertebrate Data | 01/31/2008 | 01/31/2008 | |
Conservation easements | H: 172. Acquire conservation easements for improvements on Birch Creek | 01/31/2008 | 01/31/2008 | |
Designs/specifications | I: 175. Preparation of engineering designs/specifications - Birch/Meacham Cr. projects | 01/31/2008 | 01/31/2008 | |
Wells/pumps | J: 34. Dig well or install surface pump diversion as alternative to dam diversion | 01/31/2008 | ||
Well, Pump and trough. | K: 34. Install well for alternative livestock water source on the B&G easement | 01/31/2008 | 01/30/2008 | |
PVC Pipeline | L: 149. Install buried PVC irrigation mainlines | 01/31/2008 | ||
Barbed wire fence | M: 40. Install fence on Broun easement, Birch Cr. | 01/31/2008 | ||
Removed diversion dam | N: 85. Remove Broun diversion Dam | 01/31/2008 | ||
Dam removal | O: 85. Remove Peterson easement dam | 01/31/2008 | ||
Full channel, concrete fish ladder | P: 184. Install fish ladder at Hoeft Dam, W. Birch Cr. | 01/31/2008 | ||
Rock weirs | Q: 184. Install rock weirs below Cunningham Sheep Co. culvert, W. Birch Cr. | 10/31/2007 | 10/31/2007 | |
Channel J-hooks or cross weirs | R: 29. Install J-Hooks cross veins in Meacham Cr. | 01/31/2008 | 01/31/2008 | |
Removed or severed levees | S: 29. Remove levees in Meacham Cr. floodplain | 01/31/2008 | 01/31/2008 | |
Vegetative Planting | T: 47. Plant riparian vegetation on Broun easement | 01/31/2008 | 01/15/2008 | |
Vegetative Planting | U: 47. PLant +/- 107 acres of native grasses, via no-till seeding, on the B&G Easement property | 01/31/2008 | 01/31/2008 | |
Survival of trees and shrubs at a minimum of 70%. | V: 22. Maintain vegetation planted previously on CTUIR easements | 01/31/2008 | 01/31/2008 | |
Treated weeds | W: 53. Control noxious weeds | 12/31/2007 | 12/31/2007 | |
Repaired fencing/gates | X: 186. Repair damaged fencing/gates | 05/25/2007 | 05/25/2007 | |
Unimpaired instream passage structures | Y: 186. Conduct O&M activities on instream improvement structures | 01/31/2008 | 01/31/2008 | |
Plans and proposals reviewed within 60 days of receipt. | Z: 122. Review plans and proposals | 01/31/2008 | 01/31/2008 | |
Management plan | AA: 174. Preparation of 6 project management plans | 05/18/2007 | 05/18/2007 | |
2007 Annual Report | AB: 132. Draft & Finalize the 2007 Annual Report | 01/31/2008 | ||
Funding Package - Submit draft to COTR | AC: 119. Submit next year's SOW, Budget, and Property Inventory to the BPA COTR. | 11/01/2007 | 11/01/2007 |
Primary Focal Species | Work Statement Elements |
---|---|
All Anadromous Fish |
|
All Anadromous Salmonids |
|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Coho (O. kisutch) - Unspecified Population |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Trout, Rainbow (Oncorhynchus mykiss) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Prepare Biological Assessment (BA) & NMFS consultation | 02/09/2007 | ||||||
B | 165 | USACE/SLD Sec/ 404 permits for Meacham & Birch Cr. projects | 02/09/2007 | ||||||
C | 165 | Cultural Preservation Clearance | 02/09/2007 | ||||||
D | 189 | Coordinate with other agencies in planning and implementing habitat improvements in the Subbasin | 02/09/2007 | ||||||
E | 99 | Participation with other entities in advisory & educational activities | 02/09/2007 | ||||||
F | 157 | Collect redd counts/Suspended Solids/Turbidity, and Benthic Invertebrate Data | 02/09/2007 | ||||||
G | 162 | Analyze/interpret redd counts, suspendid solids, & Invertebrate Data | 02/09/2007 | ||||||
H | 172 | Acquire conservation easements for improvements on Birch Creek | 02/09/2007 | ||||||
I | 175 | Preparation of engineering designs/specifications - Birch/Meacham Cr. projects | 02/09/2007 | ||||||
J | 34 | Dig well or install surface pump diversion as alternative to dam diversion | 02/09/2007 | ||||||
K | 34 | Install well for alternative livestock water source on the B&G easement | 02/09/2007 | ||||||
L | 149 | Install buried PVC irrigation mainlines | 02/09/2007 | ||||||
M | 40 | Install fence on Broun easement, Birch Cr. | 02/09/2007 | ||||||
N | 85 | Remove Broun diversion Dam | 02/09/2007 | ||||||
O | 85 | Remove Peterson easement dam | 02/09/2007 | ||||||
P | 184 | Install fish ladder at Hoeft Dam, W. Birch Cr. | 02/09/2007 | ||||||
Q | 184 | Install rock weirs below Cunningham Sheep Co. culvert, W. Birch Cr. | 02/09/2007 | ||||||
R | 29 | Install J-Hooks cross veins in Meacham Cr. | 08/03/2007 | ||||||
S | 29 | Remove levees in Meacham Cr. floodplain | 08/03/2007 | ||||||
T | 47 | Plant riparian vegetation on Broun easement | 02/09/2007 | ||||||
U | 47 | PLant +/- 107 acres of native grasses, via no-till seeding, on the B&G Easement property | 02/09/2007 | ||||||
V | 22 | Maintain vegetation planted previously on CTUIR easements | 02/09/2007 | ||||||
W | 53 | Control noxious weeds | 02/16/2007 | ||||||
X | 186 | Repair damaged fencing/gates | 02/09/2007 | ||||||
Y | 186 | Conduct O&M activities on instream improvement structures | 02/09/2007 | ||||||
Z | 122 | Review plans and proposals | 02/09/2007 | ||||||
AA | 174 | Preparation of 6 project management plans | 02/09/2007 | ||||||
AB | 132 | Draft & Finalize the 2007 Annual Report | 02/09/2007 | ||||||
AC | 119 | Submit next year's SOW, Budget, and Property Inventory to the BPA COTR. | 02/09/2007 | ||||||
AD | 185 | Periodic Status Reports for BPA | 02/09/2007 |