Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 37460: 2007-398-00 CAP YAKIMA TRIBUTARY PASSAGE/HABITAT (YTAHP)
Project Number:
Title:
Yakima Basinwide Tributary Passage and Flow
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
37460
Contract Title:
2007-398-00 CAP YAKIMA TRIBUTARY PASSAGE/HABITAT (YTAHP)
Contract Continuation:
Previous: Next:
32463: 200739800 CAP YAKIMA TRIB/PASS&FLOW- YTAHP
  • 42079: 200739800 CAP YAKIMA TRIBUTARY PASSAGE/HABITAT (YTAHP)
Contract Status:
Closed
Contract Description:
The Yakima Tributary Access and Habitat Program (YTAHP) works on Yakima River tributaries to re-establish fish passage, screen diversions, increase in-stream flow and enhance riparian and in-stream habitat.  Section 2.1.2 of the Yakima Subbasin Plan Supplement (Nov.26,2004. pg.8) speaks to limiting factors in the Yakima Subbasin and attributes the declines of aquatic species to “low flows; obstruction to fish migration and entrainment; diminished habitat quantity, quality and diversity; high temperatures; altered sediment transport; and degraded channel stability”.  (Yakima Sub-basin map page 14)

YTAHP developed from a number of groups engaged in watershed management, and/or habitat restoration within the Yakima River Basin. These groups include the Washington State Department of Fish and Wildlife, Kittitas County Conservation District, North Yakima Conservation District, Kittitas County Water Purveyors, the Yakama Nation, and Ahtanum Irrigation District. The US Bureau of Reclamation and the Yakama Nation participate in the development of many YTAHP projects.  The South Central Washington Resource Conservation and Development Council administers the program at the local level.

YTAHP has concentrated on tributaries upstream of Union Gap where salmonids are known to have occurred historically.  Streams have been surveyed for fish passage barriers, analyzed for screening of diversions, and assessed for habitat quality using WDFW’s  Salmonid Screening, Habitat Enhancement, and Restoration (SSHEAR) protocol. The SSHEAR assessments provide index numbers to facilitate prioritization of passage and screening projects; YTAHP participants also bring practical knowledge and local perspective, including land ownership and water rights, to the table. Projects are not prioritized strictly by SSHEAR index numbers, rather, the merits of each project are discussed by YTAHP participants in consideration of technical difficulty, funding availability, timing relative to agricultural and fish concerns, landowner/irrigator willingness to participate, and the likelihood of accomplishing a given project.

In general, projects on tributaries are prioritized sequentially, moving upstream from the confluence with the Yakima River; as projects are completed, the regained habitat is connected to the mainstem and available to anadromous fish.  At times projects may appear out of sequence but do fit in the context of multi-year planning.
Account Type(s):
Capital
Contract Start Date:
04/01/2008
Contract End Date:
03/31/2009
Current Contract Value:
$749,448
Expenditures:
$749,448

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Program administration of specific projects B: 119. RC&D and subcontractor administration work 03/28/2009 03/31/2009
Final report uploaded to the Pisces C: 132. Submit annual report 03/31/2009
Project final design and engineering services D: 175. Project design and engineering 03/31/2009 03/31/2009
Permitting services E: 165. Permitting 03/31/2009 03/31/2009
Screen installed AA: 69. Currier Creek - EWC 11/28/2008 11/28/2008
Structure installed AB: 184. Currier Creek - EWC 11/14/2008 11/14/2008
Screen installed AK: 69. Cantu Diversion 03/31/2009 03/31/2009
Screen installed AQ: 69. Kisner Diversion pump screen 03/31/2009 03/31/2009
Screen installed AR: 69. North Yakima Conservation District (NYCD) 1 pump screen 03/31/2009 03/31/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 84 Remove/Install Diversion
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 17 instances of WE 69 Install Fish Screen
  • 1 instance of WE 80 Install Siphon
  • 2 instances of WE 84 Remove/Install Diversion
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 7 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 175 Produce Design
  • 5 instances of WE 148 Install Flow Measuring Device
  • 3 instances of WE 149 Install Pipeline
  • 3 instances of WE 164 Acquire Water Instream
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 119 RC&D and subcontractor administration work 02/09/2007
C 132 Submit annual report 02/09/2007
D 175 Project design and engineering 02/09/2007
E 165 Permitting 02/09/2007
F 184 Fines - Fish Passage 02/09/2007
G 69 Fines - Diversion Fish Screen 02/09/2007
H 148 Fines - diversion (Wide Hollow Creek) 02/09/2007
I 184 North Ahtanum Gauging station 10/02/2008
J 148 North Fork Ahtanum Gauging Station 10/02/2008
K 84 Remove Boyd Brown diversion 04/27/2007
L 80 Naches/Cowiche Siphon 02/09/2007
M 149 Cowiche Creek Water Users Association (CCWUA) 02/09/2007
N 164 Cowiche Creek Water Users Association (CCWUA) 02/09/2007
O 184 Jack creek Culvert 04/03/2008
P 184 Indian Creek Culvert 04/03/2008
Q 84 Lower Reecer Creek - Durand 02/09/2007
R 69 Lower Reecer Creek - Durand 02/09/2007
S 84 Lower Reecer Creek - Dollarway 10/28/2008
T 69 Lower Reecer Creek - Dollarway 10/28/2008
U 148 Lower Reecer Creek - Dollarway 10/28/2008
V 69 Cherry Creek - Jacob/Nesbit 02/09/2007
W 184 Cherry Creek - Jacob/Nesbit 02/09/2007
X 85 Parke Creek - Denmark Road 07/29/2008
Y 69 Cherry Creek - Sims 02/09/2007
Z 184 Cherry Creek - Sims 02/09/2007
AA 69 Currier Creek - EWC 01/06/2009
AB 184 Currier Creek - EWC 01/06/2009
AC 149 Nile Valley Piping Project 02/09/2007
AD 164 Nile Valley Piping Project 02/09/2007
AE 148 Nile Valley Piping Project 02/09/2007
AF 69 Cowychee Ditch - Fish Screen 02/09/2007
AG 148 Cowychee Ditch - Measuring device 02/09/2007
AH 149 Cowychee Ditch - Pipeline 02/09/2007
AI 164 Cowychee Ditch - Trust water 02/09/2007
AJ 154 CCWUA, Niles Valley, Cowychee Ditch Transaction negotiations 02/09/2007
AK 69 Cantu Diversion 09/11/2008
AL 69 Mortenson pump screen 07/16/2007
AM 69 Blue Slough Fish Screen 02/09/2007
AN 69 Melville Diversion 02/09/2007
AO 69 Wilson Diversion 02/09/2007
AP 69 Riley Diversion pump screen 09/11/2008
AQ 69 Kisner Diversion pump screen 09/11/2008
AR 69 North Yakima Conservation District (NYCD) 1 pump screen 09/11/2008
AS 69 North Yakima Conservation District (NYCD) 2 pump screen 02/09/2007
AT 69 Coleman Creek- Moe/Nisbet Diversion 02/20/2009