Province | Subbasin | % |
---|---|---|
Columbia Cascade | Okanogan | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Provide cultural survey or SHPO documentation to BPA | A: 165. Environmental Compliance | 09/30/2009 | 01/15/2009 | |
Scotch Creek Riparian channel restoration | B: 30. Restore Scotch Creek Riparian Channel | 09/15/2009 | 09/15/2009 | |
Sediment trap enhancements | C: 55. Sediment trap enhancements | 03/31/2009 | 03/31/2009 | |
Coordinate Citizens Advisory Group meetings | D: 99. Coordinate Citizens Advisory Group meetings | 02/28/2009 | 02/26/2009 | |
Establish 1/2 acre enhancement with deciduous tree and shrub planting | E: 47. Riparian shrub planting | 11/30/2009 | 11/15/2009 | |
Property boundary survey and posting | F: 172. Survey and post property boundary | 11/30/2009 | 11/30/2009 | |
Well maintained vegetation to ensure restoration of Riparian and Shrub-steppe habitats | G: 22. Maintain existing habitat enhancements | 11/30/2009 | 09/30/2009 | |
Fence maintenance, repair or replacement as needed | H: 186. Fence Maintenance, Repair, Replacement, or Removal | 11/30/2009 | 09/30/2009 | |
Maintained Physical Improvements | I: 186. Maintain physical improvements. | 09/30/2009 | 09/30/2009 | |
Completed weed control on all Scotch Creek units | J: 53. Weed Control | 11/30/2009 | 09/30/2009 | |
Maintained informational and regulatory signs and reader boards | K: 188. Maintain informational and regulatory signs, and reader boards | 05/31/2009 | 05/31/2009 | |
Develop a public access point on Eder road. | L: 188. Develop a public access point on Eder road | 11/30/2009 | ||
Removal of all Barn and residence materials on the Boyce acquisition | M: 27. Remove debris, litter, old buildings, and other materials as needed | 11/30/2009 | 11/20/2009 | |
Administrative duties and professional development | N: 119. Administrative duties and professional development | 11/30/2009 | 09/30/2009 | |
PILT and weed assessment payment | O: 98. Annual PILT and weed assessment payment | 04/15/2009 | 04/15/2009 |
Primary Focal Species | Work Statement Elements |
---|---|
Wildlife |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Environmental Compliance | 02/09/2007 | ||||||
B | 30 | Restore Scotch Creek Riparian Channel | 02/09/2007 | ||||||
C | 55 | Sediment trap enhancements | 02/09/2007 | ||||||
D | 99 | Coordinate Citizens Advisory Group meetings | 02/09/2007 | ||||||
E | 47 | Riparian shrub planting | 02/09/2007 | ||||||
F | 172 | Survey and post property boundary | 02/09/2007 | ||||||
G | 22 | Maintain existing habitat enhancements | 02/09/2007 | ||||||
H | 186 | Fence Maintenance, Repair, Replacement, or Removal | 02/09/2007 | ||||||
I | 186 | Maintain physical improvements. | 02/09/2007 | ||||||
J | 53 | Weed Control | 02/09/2007 | ||||||
K | 188 | Maintain informational and regulatory signs, and reader boards | 02/09/2007 | ||||||
L | 188 | Develop a public access point on Eder road | 08/31/2009 | ||||||
M | 27 | Remove debris, litter, old buildings, and other materials as needed | 02/09/2007 | ||||||
N | 119 | Administrative duties and professional development | 02/09/2007 | ||||||
O | 98 | Annual PILT and weed assessment payment | 02/09/2007 | ||||||
P | 132 | Submit Progress Report for the period Oct 2008 through Nov 2009 | 02/09/2007 | ||||||
Q | 185 | Periodic Status Reports for BPA | 02/09/2007 |