Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 45139: 1996-094-01 EXP SCOTCH CREEK WILDLIFE AREA
Project Number:
Title:
Scotch Creek Wildlife Mitigation
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
45139
Contract Title:
1996-094-01 EXP SCOTCH CREEK WILDLIFE AREA
Contract Continuation:
Previous: Next:
39276: 199609401 EXP SCOTCH CREEK WILDLIFE AREA
  • 50929: 1996-094-01 EXP SCOTCH CREEK WILDLIFE AREA
Contract Status:
Closed
Contract Description:
The Scotch Creek Wildlife Area is a complex of 6 separate management units located in Okanogan county in North Central Washington State.  The project is located within the Columbia Cascade Province (Okanogan sub-basin) and partially addresses adverse impacts caused by the construction of Chief Joseph and Grand Coulee hydroelectric dams.  With the addition of the Eder acquisition, the total size of all wildlife area units is 19,860 acres.  The Scotch Creek Wildlife Area was approved as a wildlife mitigation project in 1996 and habitat enhancement efforts to meet mitigation objectives have been underway since the spring of 1997 on Scotch Creek.  Population estimates of Sharp-tailed grouse on the Scotch Creek unit show a dramatic increase since initial acquisition in 1991.  Habitat enhancements and genetic supplementation through augmentation appear to be having a positive effect.  

Maintenance of BPA funded enhancements are necessary to protect and enhance shrub-steppe and riparian habitats to recover and sustain populations of Sharp-tailed grouse and other obligate species.  This contract will maintain shrub and tree plantings to ensure continued growth and survival, and the benefit of Sharp tailed grouse winter habitat.  We will restore shrub-steppe or meadow habitat in the area of the Scotch Creek channel construction.  After removal of non-native grasses on this 41 acres we will seed to a native grass/forb seed mix.  This is a critical habitat area for wintering Sharp-tailed grouse.  Future Riparian plantings along this channel will restore riparian habitat units.  Boundary fence repair will be performed to prevent trespass livestock on all wildlife area units.  Weed control on all acres of the wildlife area will be performed to restore quality habitat as well as protection from new invaders and maintain existing HU's.  Maintenance of signs, physical improvements, roads and parking areas will protect habitat by directing and informing the public.  Funding of administrative duties will keep project staff informed of new procedures and developments, BPA and DFW personnel informed of on-going projects, keep planning and project reporting on track, and insure smooth operations between all interested parties.

This year we will attempt to reduce fuel loads on Pogue Mountain by chipping the abundant small diameter Ponderosa Pine that has encroached on the area due to fire suppression.  Also plantings of bitterbrush, ceanothus, serviceberry and other deciduous shrubs will provide winter food for deer that was removed by the 2008 Salmon Creek wildfire.  We also will attempt to collect native plant seeds from the most desirable and important species on the wildlife area to be grown out by a commercial seed producer.  This will provide years of restoration material in the form of local biotypes for future seedings.
Account Type(s):
Expense
Contract Start Date:
12/01/2009
Contract End Date:
11/30/2010
Current Contract Value:
$364,118
Expenditures:
$364,118

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Provide cultural resource survey or SHPO documentation to BPA A: 165. Environmental Compliance 11/30/2010 09/30/2010
Coordinate Citizens Advisory Group meetings C: 99. Coordinate Citizens Advisory Group meetings 02/28/2010 01/28/2010
Annual PILT, weed assessment, and fire protection payments D: 98. Annual PILT, weed assessment, and fire protection payments 04/15/2010 04/15/2010
Administrative duties and professional development E: 119. Administrative duties and professional development 11/30/2010 11/30/2010
Fence maintenance; repair, replacement or removal as needed F: 186. Maintain Fence; Repair, Replacement, or Removal 10/31/2010 10/31/2010
Well maintained vegetation to ensure restoration of Riparian and Shrub-steppe habitats G: 22. Maintain existing habitat enhancements 10/31/2010 10/31/2010
Maintained facilities H: 186. Maintain facilities 11/30/2010 11/30/2010
Maintained informational and regulatory signs and reader boards I: 188. Maintain informational and regulatory signs, and reader boards 06/30/2010 06/30/2010
Improved access roads and public parking areas on all units J: 188. Improve access roads and parking areas 10/31/2010 10/31/2010
Completed weed control on all Scotch Creek units K: 53. Weed Control 11/30/2010 11/30/2010
Thinned forest stand L: 53. Fuels treatment on Pogue Mountain 10/15/2010 09/30/2010
Enhanced Mule Deer habitat M: 47. Deciduous shrub plantings on Pogue Mountain 11/30/2010 11/30/2010
Shrub-steppe/meadow Restoration O: 47. Restore Shrub-steppe habitat 11/30/2010 11/30/2010
Annual Report P: 132. Submit Progress Report for the period Dec 1, 2009 to Nov 30, 2010 11/30/2010 11/30/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 22 Maintain Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 47 Plant Vegetation
  • 2 instances of WE 53 Remove Vegetation
  • 1 instance of WE 98 Other
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 02/09/2007
B 185 Periodic Status Reports for BPA 02/09/2007
C 99 Coordinate Citizens Advisory Group meetings 02/09/2007
D 98 Annual PILT, weed assessment, and fire protection payments 12/01/2009
E 119 Administrative duties and professional development 02/09/2007
F 186 Maintain Fence; Repair, Replacement, or Removal 02/09/2007
G 22 Maintain existing habitat enhancements 02/09/2007
H 186 Maintain facilities 02/09/2007
I 188 Maintain informational and regulatory signs, and reader boards 02/09/2007
J 188 Improve access roads and parking areas 02/09/2007
K 53 Weed Control 02/09/2007
L 53 Fuels treatment on Pogue Mountain 12/01/2009
M 47 Deciduous shrub plantings on Pogue Mountain 12/01/2009
N 157 Collect native plant seed from local biotypes 12/01/2009
O 47 Restore Shrub-steppe habitat 02/09/2007
P 132 Submit Progress Report for the period Dec 1, 2009 to Nov 30, 2010 02/09/2007