Province | Subbasin | % |
---|---|---|
Columbia Plateau | Deschutes | 100.00% |
Previous: | Next: |
---|---|
n/a |
|
* Expenditures data includes accruals and are based on data through 31-Mar-2025.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Determine The Feasibility Of Developing A PIT Tag Interrogation Site In The Mainstem Deschutes River | A: 156. Full Duplex PIT Tag Interogation Site/Array Feasibility - Deschutes River | 02/12/2010 | 10/27/2009 | |
Develop Library Of Fall Chinook Genetic Tissue | B: 157. Collect Genetic Samples - Fall Chinook | 01/15/2010 | 01/29/2010 | |
Genetic Analysis | C: 162. Analyze Genetic Sample - Fall Chinook | 02/12/2010 | 02/05/2010 | |
Conduct Boat Based Redd Counts | D: 157. Conduct Boat Based Redd Counts - Aerial Redd Count Validation | 01/29/2010 | 01/29/2010 | |
Conduct Aerial Redd Counts | G: 157. Aerial Redd Counts - Aerial Redd Count Validation | 12/31/2009 | 11/25/2009 | |
Redd Count Validation | H: 162. Aerial Redd Count Validation | 02/12/2010 | 02/12/2010 | |
Conduct Carcass Surveys | I: 157. Conduct Carcass Surveys | 01/15/2010 | 02/12/2010 | |
Coded Wire Tag Inspection | J: 157. Decode Coded Wire Tags - Carcass Surveys | 02/12/2010 | 02/12/2010 | |
Data Analysis - Carcass Survey | K: 162. Carcass Surveys | 02/12/2010 | 02/12/2010 | |
Funding Package - Submit Draft To COTR | N: 119. Manage Project | 11/16/2009 | 02/05/2010 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Deschutes River Summer/Fall ESU |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 156 | Full Duplex PIT Tag Interogation Site/Array Feasibility - Deschutes River | 02/09/2007 | ||||||
B | 157 | Collect Genetic Samples - Fall Chinook | 10/19/2009 | ||||||
C | 162 | Analyze Genetic Sample - Fall Chinook | 02/09/2007 | ||||||
D | 157 | Conduct Boat Based Redd Counts - Aerial Redd Count Validation | 10/19/2009 | ||||||
E | 157 | Adult Trap Operations At Sherars Falls - Aerial Redd Count Validation | 10/19/2009 | ||||||
F | 158 | Assist with Marking and Tagging of Fall Chinook - Aerial Redd Count Validation | 10/19/2009 | ||||||
G | 157 | Aerial Redd Counts - Aerial Redd Count Validation | 10/19/2009 | ||||||
H | 162 | Aerial Redd Count Validation | 02/09/2007 | ||||||
I | 157 | Conduct Carcass Surveys | 10/19/2009 | ||||||
J | 157 | Decode Coded Wire Tags - Carcass Surveys | 02/09/2007 | ||||||
K | 162 | Carcass Surveys | 02/09/2007 | ||||||
L | 185 | Periodic Status Reports for BPA | 02/09/2007 | ||||||
M | 132 | No Annual Report Due | 02/09/2007 | ||||||
N | 119 | Manage Project | 02/09/2007 |