Province | Subbasin | % |
---|---|---|
Columbia Cascade | Entiat | 20.00% |
Methow | 40.00% | |
Wenatchee | 40.00% |
Previous: | Next: |
---|---|
n/a |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Completed Habitat Restoration Project | B: 29. Keystone Canyon Habitat Project - 2009-01 | 07/30/2011 | 06/29/2010 | |
Reintroduce 4 Families of Beavers into the Upper Methow Watershed | C: 36. Reintroduce Beavers - Methow Watershed 2009-19 | 12/31/2009 | 12/31/2009 | |
3 completed project plans as per the Work Element Description | F: 174. 2nd CCR Methow River Fender Mill Engineering 2009-15 | 12/31/2009 | 12/31/2009 | |
Produce Geo-rectified thermal IR imagery in known vertical and horizontal survey datum. | G: 157. Conduct Thermal Infrared (TIR) Flight in Methow Basin - 2009-16 | 12/31/2009 | 12/31/2009 | |
Replace Culverts with Bridges | H: 184. Heath Phase II Install 2 Bridges - 2009-03 | 08/31/2010 | 06/30/2010 | |
Completed Habitat Restoration Project | I: 29. 5th CCR Hancock Springs Restoration 2009-14 | 09/30/2011 | 09/30/2011 | |
One completed assessment document as per the Work Element Description | J: 174. Lower Peshashtin Creek Assessment - 2009-07 | 08/01/2010 | 06/30/2010 | |
5 passage barrier culverts replaced with non passage barrier structures | K: 184. Chumstick Creek Culvert Replacements - 2009-08 | 10/31/2009 | 10/31/2009 | |
Complete pre-acquisition work on the Marracci Property | M: 172. Conservation Easement, Marracci - MC - 2009-06 | 11/01/2009 | 11/01/2009 | |
Complete pre-acquisition work on the Canan Property | N: 172. Conservation Easements Canan - MC - 2009-10 | 12/01/2009 | 12/01/2009 | |
Complete pre-acquisition work on the Epps Property | O: 172. Conservation Easement, Epps - MC - 2009-11 | 10/01/2009 | 10/01/2009 | |
Activities completed to acquire Cedarosa properties | P: 172. Purchase, Cedarosa properties - MC - 2009-13 | 07/28/2010 | 09/30/2010 | |
Funding Package - Submit draft to COTR | Q: 119. Manage Restoration Projects | 07/31/2011 | 07/31/2011 | |
Prepare for report to be written in year 2 | R: 132. Not required for year 1 - year 1 results will be reported on as a deliverable in year 2 | 02/28/2010 | 02/28/2010 | |
Completed environmental permit applications, submitted to Washington State | S: 191. Project Permit Development & Coordination | 07/31/2011 | 10/31/2009 | |
Road Conditions Survey complete | U: 115. 1st CCR Road Condition Survey 2009-18 | 11/30/2009 | 11/30/2009 | |
Conduct Pre-Acquisition Activities for the Hancock Springs Conservation Easement | W: 172. 1st CCR Hancock Springs Property Acquisition 2009-21 | 07/31/2011 | 06/30/2010 | |
Submit reports documenting all contacts made | X: 191. 5th, 3rd, 1st CCR Outreach Supporting Habitat Restoration Activities (Methow) 2009-22 | 07/31/2012 | 07/31/2012 | |
Restoration feasibility study on the Big Valley Wildlife Area complete | Y: 174. 1st CCR Big Valley Wildlife Area Feasability Study 2009-24 | 12/31/2009 | 09/01/2009 | |
Completed Reach Assesments on the Lower Twisp and Chewuch Rivers | Z: 174. 1st CCR Lower Twisp and Chewuch Reach Assessments - 2009-25 | 06/01/2010 | 06/01/2010 | |
Construct one bank stabilization project | AB: 29. 1st CCR Wolf Creek Road Bank Stabilization Project 2009-23 | 03/04/2010 | 03/04/2010 | |
Produce plan for re-activation of the Goodfellow Sidechannel | AC: 175. 1st CCR Goodfellow Sidechannel Project 2009-09 | 04/15/2010 | 04/15/2010 | |
Conduct pre acquisition activities associated with the Parrington Property | AE: 172. 2nd CCR Pre Acquisition Activities Associated with the Parrington Property CE - 2009-27 | 10/01/2010 | 09/30/2010 | |
One completed assessment document as per the Work Element Description | AF: 115. 2nd CCR 3D Entiat River Assesment 2009-29 | 03/31/2010 | 02/17/2010 | |
One completed assessment document as per the Work Element Description | AG: 115. 2nd CCR Upper Wenatchee River Assesment 2009-28 | 07/31/2012 | 07/31/2012 | |
Produce Plans for Restoration of Reach 3-D | AH: 175. 3rd CCR Entiat 3-D Engineering 2010-46 | 10/30/2010 | 10/30/2010 | |
Produce Plans for Restoration of Middle Methow Reach - Lewisia Road to Twisp | AI: 175. 3rd CCR Lewisia Road to Twisp, Middle Methow Reach Engineering 2010-56 | 07/31/2012 | 07/31/2012 | |
Reintroduce 4 Families of Beavers into the Upper Methow Watershed | AJ: 36. 5th, 3rd CCR Reintroduce Beavers - Methow Watershed 2009-19 | 07/31/2012 | 07/31/2012 | |
Oversight of efforts to Purchase Conservation Easement | AK: 172. 3rd CCR Beaver Creek Schoolhouse Property - 2010-55 | 07/31/2012 | 07/31/2012 | |
Complete Survey and Hydraulic Modeling as per the milestones in this WE | AL: 114. 5th, 3rd CCR UC Survey and hydraulic modeling Contract - 2010-58 | 07/31/2012 | 07/31/2012 | |
Produce Designs for Small Restoration Projects | AM: 175. 5th, 3rd CCR UC Engineering Design - 2010-57 | 07/31/2012 | 07/31/2012 | |
contract for lwd harvest and hauling | AN: 98. 5th, 3rd CCR LWD Procurement - 2010-59 | 07/31/2012 | 07/31/2012 | |
Landowner Outreach completed | AO: 99. 4th CCR (21150) CCD Landowner Outreach & Coordination - 2010-60 | 07/31/2012 | 07/31/2012 | |
Construct Chewuch River Mile 10 Project | AP: 30. 5th CCR Chewuch River Mile 10 Backwater Channel- 2010-47 | 07/31/2012 | 07/31/2012 | |
Design reports, outreach materials, and final construction documents | AV: 175. 5th CCR Twisp River RM 3.5 Restoration Design - 2011-64 | 07/31/2012 | ||
Complete the USFS NEPA projects for projects in the Chewuch | AW: 165. 5th CCR Chewuch River USFS NEPA Process | 07/31/2012 | 07/31/2012 | |
Reintroduce Families of Beavers into the Upper Methow Watershed | AY: 190. 5th, 3rd CCR Reintroduce Beavers - Methow Watershed 2009-19 | 07/31/2012 | 07/31/2012 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed) |
|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
Coho (O. kisutch) - Unspecified Population |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Trout, Brook (Salvelinus fontinalis) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 02/09/2007 | ||||||
B | 29 | Keystone Canyon Habitat Project - 2009-01 | 08/24/2010 | ||||||
C | 36 | Reintroduce Beavers - Methow Watershed 2009-19 | 02/09/2007 | ||||||
D | 84 | Batie Diversion Reconfiguration (Beaver Creek) 2009-02 | 09/03/2009 | ||||||
E | 30 | Beaver Creek Channel Realignment - 2009-02 | 09/03/2009 | ||||||
F | 174 | 2nd CCR Methow River Fender Mill Engineering 2009-15 | 11/09/2009 | ||||||
G | 157 | Conduct Thermal Infrared (TIR) Flight in Methow Basin - 2009-16 | 02/09/2007 | ||||||
H | 184 | Heath Phase II Install 2 Bridges - 2009-03 | 05/12/2010 | ||||||
I | 29 | 5th CCR Hancock Springs Restoration 2009-14 | 02/09/2007 | ||||||
J | 174 | Lower Peshashtin Creek Assessment - 2009-07 | 02/09/2007 | ||||||
K | 184 | Chumstick Creek Culvert Replacements - 2009-08 | 01/26/2009 | ||||||
L | 172 | Conservation Easement, Riley MSRF - 2009-05 | 02/09/2007 | ||||||
M | 172 | Conservation Easement, Marracci - MC - 2009-06 | 02/09/2007 | ||||||
N | 172 | Conservation Easements Canan - MC - 2009-10 | 02/09/2007 | ||||||
O | 172 | Conservation Easement, Epps - MC - 2009-11 | 02/09/2007 | ||||||
P | 172 | Purchase, Cedarosa properties - MC - 2009-13 | 02/09/2007 | ||||||
Q | 119 | Manage Restoration Projects | 02/09/2007 | ||||||
R | 132 | Not required for year 1 - year 1 results will be reported on as a deliverable in year 2 | 02/09/2007 | ||||||
S | 191 | Project Permit Development & Coordination | 02/09/2007 | ||||||
T | 186 | 1st CCR Repair Twisp River Side Channel Backup Pump - 20090-4 | |||||||
U | 115 | 1st CCR Road Condition Survey 2009-18 | 02/09/2007 | ||||||
V | 172 | 1st CCR Dryden Property Acquisition 2009-20 | 02/09/2007 | ||||||
W | 172 | 1st CCR Hancock Springs Property Acquisition 2009-21 | 02/09/2007 | ||||||
X | 191 | 5th, 3rd, 1st CCR Outreach Supporting Habitat Restoration Activities (Methow) 2009-22 | 02/09/2007 | ||||||
Y | 174 | 1st CCR Big Valley Wildlife Area Feasability Study 2009-24 | 02/09/2007 | ||||||
Z | 174 | 1st CCR Lower Twisp and Chewuch Reach Assessments - 2009-25 | 02/09/2007 | ||||||
AA | 165 | 1st CCR Assist with EC on 2009-4, 2009-17, 2009-18 and Dryden | 02/09/2007 | ||||||
AB | 29 | 1st CCR Wolf Creek Road Bank Stabilization Project 2009-23 | 08/21/2009 | ||||||
AC | 175 | 1st CCR Goodfellow Sidechannel Project 2009-09 | 06/09/2010 | ||||||
AD | 172 | 2nd CCR Pre Acquisition Associated with the Sugar Dike land purchases 2009-26 | 04/15/2009 | ||||||
AE | 172 | 2nd CCR Pre Acquisition Activities Associated with the Parrington Property CE - 2009-27 | 04/15/2009 | ||||||
AF | 115 | 2nd CCR 3D Entiat River Assesment 2009-29 | 04/15/2009 | ||||||
AG | 115 | 2nd CCR Upper Wenatchee River Assesment 2009-28 | 04/15/2009 | ||||||
AH | 175 | 3rd CCR Entiat 3-D Engineering 2010-46 | 04/15/2009 | ||||||
AI | 175 | 3rd CCR Lewisia Road to Twisp, Middle Methow Reach Engineering 2010-56 | 04/15/2009 | ||||||
AJ | 36 | 5th, 3rd CCR Reintroduce Beavers - Methow Watershed 2009-19 | 04/15/2009 | ||||||
AK | 172 | 3rd CCR Beaver Creek Schoolhouse Property - 2010-55 | 04/15/2009 | ||||||
AL | 114 | 5th, 3rd CCR UC Survey and hydraulic modeling Contract - 2010-58 | 04/15/2009 | ||||||
AM | 175 | 5th, 3rd CCR UC Engineering Design - 2010-57 | 04/15/2009 | ||||||
AN | 98 | 5th, 3rd CCR LWD Procurement - 2010-59 | 09/22/2010 | ||||||
AO | 99 | 4th CCR (21150) CCD Landowner Outreach & Coordination - 2010-60 | 04/15/2009 | ||||||
AP | 30 | 5th CCR Chewuch River Mile 10 Backwater Channel- 2010-47 | 05/25/2011 | ||||||
AQ | 29 | 5th CCR Chewuch River 8-Mile Ranch LWD- 2010-48 | 06/21/2011 | ||||||
AR | 47 | 5th CCR Chewuch River 8-Mile Rach Re-vegetation - 2010-48 | 06/21/2011 | ||||||
AS | 174 | 5th CCR River User Safety Plan - 2011-61 | 04/15/2009 | ||||||
AT | 40 | 5th CCR Remove and Install Fence for 8 Mile Ranch - 2010-48 | 06/21/2011 | ||||||
AU | 29 | 5th CCR Sunnyslope ELJ - 2011-63 | 08/23/2011 | ||||||
AV | 175 | 5th CCR Twisp River RM 3.5 Restoration Design - 2011-64 | 04/15/2009 | ||||||
AW | 165 | 5th CCR Chewuch River USFS NEPA Process | 04/15/2009 | ||||||
AX | 29 | 5th CCR Chewuch River Mil 10 Instream LWD - 2010-47 | 05/25/2011 | ||||||
AY | 190 | 5th, 3rd CCR Reintroduce Beavers - Methow Watershed 2009-19 | 04/15/2009 |