Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 42839: 2008-466-00 EXP PROSSER HATCHERY REFORM & UPGRADES
Project Number:
Title:
Prosser Hatchery Reform & Upgrades
Stage:
Closed
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
42839
Contract Title:
2008-466-00 EXP PROSSER HATCHERY REFORM & UPGRADES
Contract Continuation:
Previous: Next:
n/a
Contract Status:
History
Contract Description:
To make needed reforms and upgrades to the infrastructure of the Prosser hatchery. This will include replacing the current chiller with a larger more productive one and all associated tasks.
The chiller will increase egg viability/survival, allow for synchronization of egg  hatch time and increase survival of broodstock.

Install an automated alarm system to monitor water conditions throughout the hatchery. This will include flow meters on river intake system, wells on every fish holding vessel, along with dissolved oxygen/temperature probes and float meters on all holding vessels.

Install a larger pump in one of the current wells.

Install lights at various locations throughout the hatchery for night time checks and emergencies.

This work will include all needed upgrades to facility to incorporate the above mentioned modification/additions, i.e. electrical work, installing pipes, electrical conduit and esthetic finishes when installation is complete.

Market comparables were researched for all contracted materials and labor.  See uploaded quotes and recommendations under Attachments.
Account Type(s):
Expense
Contract Start Date:
05/01/2009
Contract End Date:
06/30/2011
Current Contract Value:
$1,000,000
Expenditures:
$1,000,000

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shirley Alvarado Yakama Confederated Tribes Yes Administrative Contact shirley_alvarado@yakama.com (509) 865-5121x6304
Hannah Dondy-Kaplan Bonneville Power Administration Yes Env. Compliance Lead hadondy-kaplan@bpa.gov (503) 230-4071
Israel Duran Bonneville Power Administration No Interested Party induran@bpa.gov (503) 230-3967
Dave Fast Yakama Confederated Tribes No Technical Contact fast@yakama.com (509) 966-5291
Bill Fiander Yakama Confederated Tribes Yes Contract Manager bfiander@yakama.com (509) 865-5121x6372
Mark Johnston Yakama Confederated Tribes Yes Technical Contact mark_johnston@yakama.com (509) 945-1133
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Michael Mayer Bonneville Power Administration Yes Interested Party msmayer@bpa.gov (503) 230-7692
Rosemary Mazaika Bonneville Power Administration Yes Interested Party rxmazaika@bpa.gov (503) 230-5869
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Mel Sampson Yakama Confederated Tribes No Supervisor mel@yakama.com (509) 865-5121x6303
Patricia Smith Bonneville Power Administration Yes COR prsmith@bpa.gov (503) 230-7349
Adrienne Wilson Yakama Confederated Tribes Yes Administrative Contact Adrienne_Wilson@Yakama.com (509) 865-5121x6306


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Updated Site Plan & Final Inspections B: 61. Update Site Plans; Coordination with BPA 06/30/2011 06/30/2011
Automated Alarm system C: 61. Install alarm system at Prosser Hatchery. 04/30/2010 04/30/2010
Water Chiller and Weatherized Enclosures D: 61. Upgrade water chiller system at Prosser and Marion Drain Hatchery. 04/30/2010 10/09/2009
Water Delivery, Lights, Widening Road & Bank Stabilization E: 61. Upgrades to water delivery/lights 06/30/2011 06/30/2011
Funding Package - Submit draft to COTR F: 119. Prosser Hatchery - Implement Construction Activities 01/01/2010 12/31/2009
EC Coordination & Clearances H: 165. Coordinates with BPA EC Lead for Environmental Compliance 04/30/2010 10/01/2009
Funding Package - Accruals for FY11 I: 119. Prosser Hatchery - Continue Administration - FY 11 Funding/Accruals 06/30/2011 06/30/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 4 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
Coho (O. kisutch) - Unspecified Population
  • 4 instances of WE 61 Maintain Artificial Production Facility/Infrastructure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 61 Update Site Plans; Coordination with BPA 03/17/2009
C 61 Install alarm system at Prosser Hatchery. 03/17/2009
D 61 Upgrade water chiller system at Prosser and Marion Drain Hatchery. 03/17/2009
E 61 Upgrades to water delivery/lights 03/17/2009
F 119 Prosser Hatchery - Implement Construction Activities 02/09/2007
G 132 Project Annual Report 02/09/2007
H 165 Coordinates with BPA EC Lead for Environmental Compliance 02/09/2007
I 119 Prosser Hatchery - Continue Administration - FY 11 Funding/Accruals 05/01/2009